Design institutes of Kazakhstan's oil and gas industry

A comparison of 36 organisations that prepare project documents for subsoil users, each with its own profile. And the rules: the documents needed at each stage and who approves them, the licences a designer must hold, what to look at when choosing one. No ratings: only facts with their sources.

organisations compared
36
organisations compared
prepare subsurface documents
10
prepare subsurface documents
design field facilities and plants
30
design field facilities and plants
smaller firms in a separate table
19
smaller firms in a separate table

Data checked on October 2, 2026

The organisations compared

Organisations that have a profile with sources in the directory. The order is alphabetical: a place in the table means nothing. Click a name to open the profile.

Discipline
Owner

Showing 36 of 36

Aksaigazproekt

Working designs for the producing Karachaganak field: pads for drilling and workover, well tie-ins, in-field pipelines, modifications of process units; environmental documents and surveys.

CityAksaialso: OralDisciplines
  • Facilities
  • Environmental
OwnerPrivate, KazakhstanFounded2001
Aktau Engineering

Working designs for Mangystau oil fields: well sites and hook-ups, gathering systems, metering units, tank farms; field infrastructure, surveys, environmental sections to its own designs.

CityAktauDisciplines
  • Facilities
OwnerPrivate, KazakhstanFounded2006
AktyubNIGRI

Exploration and trial production projects, well drilling projects, liquidation and conservation projects, environmental sections to its own projects; an accredited testing laboratory.

CityAktobeDisciplines
  • Subsurface
  • Environmental
  • Research
OwnerPrivate, KazakhstanFoundedThe founding year could not be established
Caspian Energy Research

Reserves estimates, exploration, trial production and development projects, well construction projects, liquidation projects — with environmental sections. Not to be confused with Caspian Engineering & Research of Aktau.

CityAtyrauDisciplines
  • Subsurface
  • Environmental
OwnerPrivate, KazakhstanFounded2002
Caspian Engineering & Research (CER)

Field facilities for oil and gas fields (oil and gas treatment units, gathering systems), trunk pipelines, storage of liquefied gases and petroleum products, pre-design documents, environmental design.

CityAktauDisciplines
  • Facilities
  • Environmental
OwnerPrivate, KazakhstanFounded2003
Caspian Proger

According to the company — multidisciplinary engineering and project management for the onshore and offshore facilities of Kashagan under a framework agreement, and engineering of water treatment and waste management facilities.

CityAtyraualso: AlmatyDisciplines
  • Facilities
OwnerInternational groupProger (Italy)Founded2002
Caspy Engineering

Working designs for operating facilities at Tengiz and Karachaganak, well construction projects, environmental documents, engineering surveys; a large part of its work is civil design for public-sector clients.

CityAtyraualso: Oral, AksaiDisciplines
  • Facilities
  • Environmental
OwnerPrivate, KazakhstanFounded2002
Construction NS

Working designs for well facilities and gathering systems at Mangystau fields, liquidation and reclamation projects, environmental protection sections and draft emission standards; also civil design.

CityAktaualso: AstanaDisciplines
  • Facilities
  • Environmental
OwnerPrivate, KazakhstanFoundedThe founding year could not be established
Engineering Centre (Aktau)

Working designs for oil and gas fields in Mangystau and Atyrau regions: well hook-ups, manifold stations, group metering units, field pipelines; oil depots and tank farms.

CityAktauDisciplines
  • Facilities
OwnerPrivate, KazakhstanFounded2001
EON Energo

Working designs for the reconstruction and re-equipment of units at the Atyrau and Pavlodar refineries, environmental sections of the designs; besides design — equipment supply and construction and installation work.

CityAktaualso: PavlodarDisciplines
  • Facilities
  • Environmental
OwnerPrivate, KazakhstanFounded2005
Fluor

Through the Fluor-led joint venture KPJV — FEED, detailed engineering and construction management of the Future Growth Project at Tengiz (according to the company); the project was completed in 2025.

CityAtyrauDisciplines
  • Facilities
OwnerInternational groupFluor (USA)FoundedThe founding year could not be established
GeoProject

Working designs for well facilities and oil and gas gathering systems at producing fields; environmental design documents — draft emission and technological standards, environmental protection sections.

CityAtyrauDisciplines
  • Facilities
  • Environmental
OwnerPrivate, KazakhstanFounded1998
ILF Kazakhstan

According to the company — FEED and detailed design of trunk gas and oil pipelines and compressor stations, concept studies and FEED for field facilities; also technical audits and project management consultancy.

CityAlmatyalso: AtyrauDisciplines
  • Facilities
OwnerInternational groupILF Group (Austria, Germany)Founded1994
K Caspian Engineering (KCE)

Detailed design for operating facilities at Tengiz under a contract with Tengizchevroil: well sites and well pads, group metering units, flowlines and water lines.

CityAtyrauDisciplines
  • Facilities
OwnerPrivate, KazakhstanFounded2007
KATEK

Gas transport and gas supply: feasibility studies and working designs for trunk gas pipelines, branches and gas distribution stations, distribution networks of towns and villages; the feasibility study of the Tengiz–Karabatan ethane and propane pipelines.

CityAlmatyDisciplines
  • Facilities
OwnerPrivate, KazakhstanFoundedThe founding year could not be established
Kazakh Institute of Oil and Gas (KING)

The parent company of a private design group: feasibility studies and design documentation for refining, petrochemicals and gas chemistry and for trunk oil and gas pipelines; environmental documents, standards and R&D.

CityAlmatyalso: AstanaDisciplines
  • Facilities
  • Environmental
  • Research
OwnerPrivate, KazakhstanKING group (parent company)Founded2002
Kazgiproneftetrans (KGNT)

Design of refining, petrochemical and gas-chemical plants, trunk oil and gas pipelines, field facilities, terminals and tank farms; engineering surveys and environmental design documents.

CityAlmatyDisciplines
  • Facilities
  • Environmental
OwnerPrivate, KazakhstanKING groupFounded1974 — The year from which the organisation traces its history
KAZHADA PROJECTS

Working designs for oil fields in Kyzylorda region (well sites and hook-ups, flowlines, power supply), inter-field pipelines, environmental design documents.

CityKyzylordaDisciplines
  • Facilities
  • Environmental
OwnerPrivate, KazakhstanFoundedThe founding year could not be established
KazNIGRI

Exploration projects, reserves estimates, development design and analysis, well drilling projects, liquidation projects, environmental design; an accredited laboratory (core, PVT, fluids). Field facilities are a minor line.

CityAtyrauDisciplines
  • Subsurface
  • Facilities
  • Environmental
  • Research
OwnerPrivate, KazakhstanFounded1946 — The year from which the organisation traces its history
KazTransOil Research and Development Centre (CIR)

KazTransOil's in-house design and research centre (a branch, not a separate company): design and estimate documentation for the company's own trunk oil pipelines, pump stations and tank farms, environmental sections, oil and corrosion laboratories.

CityAstanaalso: Aktau, PavlodarDisciplines
  • Facilities
  • Environmental
  • Research
OwnerState groupKazTransOil (KazMunayGas group)Founded2000
KITNG (formerly KazGiproGaz)

Gas supply: trunk gas pipelines and branches, gas distribution stations and networks; refining and petroleum-product supply facilities; environmental documents and engineering surveys.

CityAlmatyDisciplines
  • Facilities
  • Environmental
OwnerPrivate, KazakhstanFounded1973 — The year from which the organisation traces its history
KJS Project & Consulting

Working designs for Mangystau fields: well sites and hook-ups, oil and gas gathering and transport systems, connection of field pipelines to trunk oil pipelines; environmental protection sections and draft emission standards.

CityAktaualso: AstanaDisciplines
  • Facilities
  • Environmental
OwnerPrivate, KazakhstanFounded2008
KMG Engineering

The research and design institute of the KazMunayGas group: reserves estimates, exploration and development projects, well construction projects, field facilities, environmental documents; laboratories in Aktau and Atyrau.

CityAstanaalso: Atyrau, AktauDisciplines
  • Subsurface
  • Facilities
  • Environmental
  • Research
OwnerState groupKazMunayGasFounded2014
KPSP — Karaganda Promstroyproekt Institute

A multi-sector design institute. In oil and gas — design-stage and working documentation for gas processing and petrochemicals, adaptation of foreign designs to Kazakhstan's norms, author supervision; Karachaganak and Kashagan facilities through the TKJV joint venture.

CityAstanaalso: Karaganda, Atyrau, AksaiDisciplines
  • Facilities
OwnerPrivate, KazakhstanKPSP groupFounded1959 — The year from which the organisation traces its history
NIPI Kaspiymunaigaz

Field facilities for oil and gas fields (feasibility studies and working designs), environmental design documents, engineering surveys. A private institute — not the Atyrau branch of KMG Engineering.

CityAtyrauDisciplines
  • Facilities
  • Environmental
OwnerPrivate, KazakhstanKING groupFounded1940 — The year from which the organisation traces its history
NIPIneftegaz

Reserves estimates, exploration, trial production and development projects, well construction projects, field facilities, environmental documents; a laboratory centre with core storage.

CityAktaualso: Almaty, Astana, Oral, Kyzylorda, AtyrauDisciplines
  • Subsurface
  • Facilities
  • Environmental
  • Research
OwnerPrivate, KazakhstanFounded1997
OPTIMUM Design Institute

Reserves estimates, exploration, trial production and development projects, well construction projects, field facilities, design of gas-chemical plants, environmental documents.

CityAktauDisciplines
  • Subsurface
  • Facilities
  • Environmental
OwnerPrivate, KazakhstanFounded2000
QazaqGaz NTC

The science, engineering and training centre of the national company QazaqGaz, working inside the group: geological analysis and models, standards, staff training. Design is a small and recent part of its work: the working design of a standard CNG filling station (2025).

CityAstanaDisciplines
  • Facilities
  • Research
OwnerState groupQazaqGazFounded2023
Scientific and Production Centre (NPC), Aktau

Reserves estimates, exploration, trial production and development projects, development analysis and author supervision, well construction projects, liquidation projects, environmental documents.

CityAktauDisciplines
  • Subsurface
  • Environmental
OwnerPrivate, KazakhstanFounded2000
SMART Engineering

Reserves estimates, exploration and appraisal, trial production and development projects, development analysis, author supervision, well construction projects — with its own environmental sections.

CityAlmatyalso: AtyrauDisciplines
  • Subsurface
  • Environmental
OwnerPrivate, KazakhstanFounded2006
Timal Consulting Group

Development projects and their addenda, trial production and exploration projects, reserves estimates, geological and reservoir simulation models; environmental documents prepared in-house.

CityAtyraualso: AlmatyDisciplines
  • Subsurface
  • Environmental
OwnerPrivate, KazakhstanFounded2008
TKJV

According to the company — concept studies, pre-FEED and FEED, detailed engineering for producing fields under frame agreements with the operators of Kashagan and Karachaganak.

CityKaragandaalso: Atyrau, Aksai, AlmatyDisciplines
  • Facilities
OwnerInternational groupJoint venture of Technip Energies (France) and KPSPFounded2019
Viridi Navitas

For oil and gas — well drilling projects, projects for liquidating the consequences of subsoil use and impact reports; also works in solid minerals and hydrogeology.

CityAstanaDisciplines
  • Subsurface
  • Environmental
OwnerPrivate, KazakhstanFounded2009
Witteveen+Bos Caspian

Civil and marine infrastructure for oil and gas projects, not process plant: artificial islands, marine access channels, ports and offloading facilities, access roads, and environmental impact assessment for those facilities (according to the company).

CityAlmatyalso: Atyrau, AktauDisciplines
  • Facilities
  • Environmental
OwnerInternational groupWitteveen+Bos (Netherlands)FoundedThe founding year could not be established
WoodKSS

According to the company — early-phase studies, FEED and detailed engineering, modifications of operating facilities, as well as project management, EPC/EPCm and asset-integrity services.

CityAtyraualso: Almaty, Tengiz, AktauDisciplines
  • Facilities
OwnerInternational groupJoint venture of Wood (UK) and KazStroyServiceFounded2007
Worley

According to the company — FEED and detailed engineering, EPCM for field facilities and pipelines (Tengiz, Karachaganak).

CityAtyraualso: Almaty, AktauDisciplines
  • Facilities
OwnerInternational groupWorley (Australia)FoundedThe founding year could not be established

How to read the table

State group
A subsidiary or a branch of a national company.
Private, Kazakhstan
A private company or group registered in Kazakhstan that, on the public record, belongs neither to a national company's group nor to an international engineering group. In many cases the participants are not published.
International group
The Kazakhstan company or branch of an international engineering group, or its joint venture with a Kazakhstan partner.

City is where the head office is; “also” lists the other cities in Kazakhstan where the organisation itself reports an office, branch or design bureau.

“Founded” is the year the organisation was created. An asterisk marks a year from which the organisation traces its history: it is the year a predecessor institute was created, and the present legal entity was registered later. For units of international groups it is the year the Kazakhstan company was created, as the group itself states it. A dash means the year could not be established.

All design institutes in the directory

Smaller design firms

Firms whose design documents are visible on state portals but whose public footprint is thin: a few documents, one client, or no website of their own. They have no profiles and we publish no contacts — only what the documents confirm.

ТОО «Ast Nedra»CityAstanaWhat it preparesSubsurface and wellsWhat open sources showThe notice of a public hearing scheduled for 26 January 2022 names it as developer of the development project for the North Akshabulak field for Sauts-Oil LLP.
ТОО «Geoscience Consulting»CityAstanaWhat it preparesSubsurface and wellsWhat open sources showAt least four public-hearing notices of 2022–2025 name it as developer of exploration projects and a group drilling project for SapaInvestment and Kumkol Oil LLP.
ТОО «Дербес Солюшенс»CityAtyrauWhat it preparesSubsurface and wellsWhat open sources showNine public-hearing notices (April 2025 – September 2026) name it as developer of well-construction technical projects with environmental sections, mainly for Maten Petroleum JSC, Priority Oil & Gas and Prosperity Oil & Gas.
ТОО «БМ Продакшн»CityAstanaWhat it preparesSubsurface and wellsWhat open sources showFour public-hearing notices (December 2024 – September 2025) name it as developer of drilling technical projects and a liquidation project for Turan-Barlau LLP and BK Engineering.
ТОО «НКЦ «Geo&Engineering Plus»CityAktauWhat it preparesSubsurface and wellsWhat open sources showThree public-hearing notices (December 2024 – May 2025) name it as developer of technical projects for exploration and appraisal wells for Coast Oil, Kristall Management JSC and Shetpe Munai.
ТОО «Проектный Институт Нефти и Газа»CityAktauWhat it preparesFacilities and plantsWhat open sources showAt least four public-hearing notices of 2022–2025 name it as developer or co-developer of field-facility working designs: the corrected facilities design for the Zhangurshi field for Aktau-Transit, and projects for Kom-Munai and Tasbulat Oil Corporation.
ТОО «Gals»CityAktauWhat it preparesSeveral lines of workWhat open sources showTwo public-hearing notices name it as developer: the technical project for exploration well WPC-2 for West Precaspian Company (September 2025) and the working design of an oil-gathering point at the Tagan Yuzhny field (hearing scheduled for November 2026).
ТОО «АртНефтьСтройПроект»CityKyzylordaWhat it preparesEnvironmentalWhat open sources showAt least eight public-hearing notices of 2022–2026 name it as developer, mostly of environmental documents for oil-waste sites and for Kristall Management JSC.
ТОО «KZ ПроектСтройКомплекс Атырау»CityAtyrauWhat it preparesFacilities and plantsWhat open sources showThe gov.kz portal carries the 2025 working design of an oil pipeline from the Morskoye field to PSSN Karaton for KoZhaN JSC, with this company's title block.
ТОО «Optimum Project»CityAktobeWhat it preparesFacilities and plantsWhat open sources showFour public-hearing notices (October and November 2025) concern facilities of KUL-BAS LLP; the environmental section states that the working design for expanding the oil gathering and treatment system at the Kul-Bas field (second start-up complex) was developed by this company, which is separate from the Aktau institute OPTIMUM.
ТОО «Юг Газ Проект»CityShymkentWhat it preparesFacilities and plantsWhat open sources showAt least seven public-hearing notices of 2022–2025 name it as designer: the pig launcher and receiver on the Kartaly–Rudny trunk gas pipeline for Intergas Central Asia JSC, while the other notices concern village gas networks.
ТОО «КАЗНИИХИМПРОЕКТ»CityShymkentWhat it preparesFacilities and plantsWhat open sources showThree public-hearing notices (November 2024 – March 2025) name it as developer of project documentation for Sauts-Oil LLP: the ZU-4 metering unit at the Bukharsai field and the UPSV-2 preliminary water knockout unit at the North Akshabulak field.
ТОО «ПИНАМ Групп»CityAktauWhat it preparesFacilities and plantsWhat open sources showAt least six public-hearing notices (December 2024 – January 2026) name it as developer of the 2024 working design for the facilities of exploration and early-production wells at the Vostochny Bekturly field for Becturly Energy Operating, and as one of the developers of documentation for Tasbulat Oil Corporation and Kom-Munai.
ТОО «BM engineering»CityAktauWhat it preparesSeveral lines of workWhat open sources showThirteen public-hearing notices (November 2024 – March 2026) name it as developer, mostly of environmental documents for oil and gas projects; the 2024 working design for the facilities of 64 wells and a gas-gathering collector at the Sarybulak field for Tarbagatay Munai LLP was made by the company itself.
ТОО «PRIME CAPITAL CORPORATION»CityAktauWhat it preparesSubsurface and wellsWhat open sources showEighteen public-hearing notices (November 2024 – September 2026) name it as developer, mostly of well-construction technical projects and their environmental sections, for Maten Petroleum, North Karazhanbas, Emir-Oil, Lucent Petroleum, TENGE Oil & Gas, Buzachi Operating and other companies.
ТОО «SciRes»CityAktauWhat it preparesSubsurface and wellsWhat open sources showAt least nine public-hearing notices of 2022–2026 name it as developer: exploration projects and well-construction technical projects for Black Gold Operating Company, RAMCO Oil Shubar, CS Energy and Absolute Oil, and draft emission limits and environmental programmes for ARK Petroleum.
Филиал «ОНХП-Евразия» ПАО «ОНХП»CityAstanaWhat it preparesFacilities and plantsWhat open sources showAstana branch of the Russian company ONHP PJSC (Omsk), opened in 2022 according to the organisation; the Samruk-Kazyna procurement portal shows one executed ONHP contract with the Pavlodar Petrochemical Plant for technological regulations (2021), and the organisation itself publishes the Kazakhstan licences held in ONHP's name for design activity of category I, engineering surveys and environmental design.
Филиал «Казахстанский» АО «Гипровостокнефть»CityAktauWhat it preparesFacilities and plantsWhat open sources showAktau branch of the Russian institute Giprovostokneft JSC (Samara); as stated by the organisation, the institute holds Kazakhstan licences of 2018 for design activity of category I and for project documents for hydrocarbon fields, and its 2025 annual report mentions contracts with the Kazakhstan company of the Caspian Pipeline Consortium (CPC-K).
ТОО «Мунайгазгеолсервис»CityAlmatyWhat it preparesSubsurface and wellsWhat open sources showDocuments on state portals name it as author of exploration projects of 2019–2023 (Bekmurat, Madot Oil, the area near Kumkol, Sarylan) and of the pilot-operation project (2020), reserves estimate (2022) and development project (approved in 2023) for the Kenbulak field; its legal address is in Almaty and its production base in Shymkent.

What a design institute does

A subsoil user may drill, produce and build only under project documents, and those are drawn up by a licensed design organisation it engages. The institute prepares the document, takes it through the reviews together with the subsoil user and then carries out author supervision.

  • Where the Subsoil Code requires it, subsoil operations may be carried out only under a project document. It contains the plans, methods, technical conditions, technological indicators, volumes and timing of the work; it is drawn up separately for each subsoil area and takes account of environmental and industrial safety.

  • Hydrocarbon project documents fall into two groups. The basic ones are the exploration project, the trial production project and the field development project. The technical ones are developed on the basis of the basic ones; among them the Unified Rules name the seismic project, the technical project for drilling wells, the field facilities project, the project for conserving the subsoil area, the project for liquidating or conserving technological objects and the project for liquidating the consequences of subsoil use.

  • Project documents are drawn up by a design organisation engaged by the subsoil user that holds a licence for the relevant activity. They are approved by the subsoil user.

  • The subsoil user must comply with the provisions of project documents that received positive review conclusions. To change the types, methods, technologies, volumes or timing of the work, the project document is amended first; the cases where that is not needed are listed in the Unified Rules.

Four lines of work

The organisations in the comparison above are tagged by these lines.

  • Subsurface: reserves, exploration, development, wells

    Reserves estimate reports, exploration, trial production and development projects, development analysis and author supervision, geological and reservoir simulation models. In this directory, technical projects for drilling (constructing) wells also belong here.

  • Field facilities and plants

    Field facilities design — oil and gas gathering and treatment, field pipelines, tank farms, power supply — as well as trunk pipelines, gas processing and refining: from the feasibility study and FEED to working documentation and author supervision during construction.

  • Environmental documents

    Reports on possible impacts, “Environmental protection” sections in design documentation, draft emission standards, document packages for environmental permits. Marked for organisations where environmental design is a line of work in its own right.

  • Research and laboratories

    Laboratory studies that support design work — core, PVT, reservoir fluids, drilling fluids and cement slurries — as well as research and standards.

After the document is delivered

The documents needed at each stage and who approves them

The table follows the Subsoil Code for a hydrocarbon field. Project documents are approved by the subsoil user itself; the state carries out the reviews and receives notifications. The terms are those the law gives for a review.

Every step and approval in order — on the Field development stages page
ExplorationThe exploration projectWithin a year of the contract's registration, for the whole exploration periodThe step in the field stages Drafted byA licensed design organisationApproved byThe subsoil userReview and termState environmental review. The project goes to the competent body by notification; the central commission reviews it, in 2 months, only if it provides for appraising a discovery, offshore exploration or an increase of the subsoil area.BasisSubsoil Code, Arts. 134, 135, 139, 140Central Commission (TsKRR) regulation, para. 9
ExplorationThe seismic project; the technical project for drilling wellsThe drilling project is drawn up under a design assignment prepared by the subsoil user; drilling without an approved project is not allowedThe step in the field stages Drafted byA licensed design organisationApproved byThe subsoil userReview and termThe reviews required by the Subsoil Code and other laws.BasisSubsoil Code, Art. 138(1), (5)Unified Rules on rational and integrated subsoil use, paras 5, 165–169
AppraisalAn addendum to the exploration project (appraising the discovered pool)The step in the field stages Drafted byA licensed design organisationApproved byThe subsoil userReview and termReview by the central commission — 2 months, with one independent expert; an environmental conclusion is needed first.BasisSubsoil Code, Arts. 135(5), 139(3), 140(4)Rules for engaging independent experts, para. 3
AppraisalThe operational reserves estimate reportNeeded before trial productionThe step in the field stages Drafted byA licensed design organisationApproved byThe subsoil userReview and termState review of subsoil: until 1 January 2030 it is carried out by the state commission on reserves. The term is 3 months, extendable by no more than 3 months.BasisSubsoil Code, Arts. 141, 277(6)Unified Rules on rational and integrated subsoil use, paras 31, 56
Trial productionThe trial production projectWithin three months of the subsoil user's decision to hold trial production, which is itself optionalThe step in the field stages Drafted byA licensed design organisationApproved byThe subsoil userReview and termReview by the central commission — 3 months, extendable by no more than 3 months; one independent expert. The project is accepted only after a positive conclusion on the operational reserves estimate.BasisSubsoil Code, Arts. 136, 139, 140Unified Rules on rational and integrated subsoil use, para. 28Rules for engaging independent experts, para. 3
End of explorationThe reserves estimate reportThe step in the field stages Drafted byA licensed design organisationApproved byThe subsoil userReview and termState review of subsoil — 3 months, extendable by no more than 3 months. A positive conclusion is a mandatory condition for fixing the production area and the preparatory period.BasisSubsoil Code, Arts. 118(4), 141Unified Rules on rational and integrated subsoil use, para. 35
Getting ready to produceThe field development projectFor the whole period of profitable production; at least three development variants are consideredThe step in the field stages Drafted byA licensed design organisationApproved byThe subsoil userReview and termReview by the central commission — 3 months, extendable by no more than 3 months; two independent experts. The project is accepted only after a positive conclusion on the reserves estimate report.BasisSubsoil Code, Arts. 137, 139, 140Unified Rules on rational and integrated subsoil use, paras 101, 134Rules for engaging independent experts, paras 3–4
Getting ready to produceThe raw gas processing development programmeUpdated every three yearsThe step in the field stages Drafted byThe subsoil user — on the approved form, based on the approved basic project document or the development analysisApproved byThe hydrocarbons authority — taking account of the working group's recommendationsReview and termNo review is provided for.BasisSubsoil Code, Art. 147(3)
Field facilitiesThe technical project for field facilities; design and estimate documentationBased on the trial production project, the development project or the development analysisThe step in the field stages Drafted byA design organisation; on the licences, see the next sectionApproved byThe subsoil userReview and termComprehensive non-departmental review: for new construction, reconstruction, expansion, modernisation and technical re-equipment of objects of the first and second levels of responsibility it is carried out by the state expert organisation. The design documentation of a hazardous production facility is agreed with the chief state industrial safety inspector. The state environmental review runs within the environmental permit procedure.BasisSubsoil Code, Arts. 124, 134(4), 139(5)Unified Rules on rational and integrated subsoil use, para. 96Construction Code, Arts. 104, 105, 109, 114Civil Protection Law, Art. 78Environmental Code, Art. 87
ProductionThe author supervision reportThe step in the field stages Drafted byThe design organisation that wrote the projectApproved byThe Subsoil Code and the Unified Rules provide for no approvalReview and termNot subject to review; sent to the hydrocarbons authority by notification.BasisSubsoil Code, Art. 142(1), (5)Unified Rules on rational and integrated subsoil use, paras 148, 155
ProductionThe development analysisAt least once every three yearsThe step in the field stages Drafted byA licensed design organisationApproved byArticle 142 of the Code names no approval; Articles 125 and 147 speak of a development analysis approved by the subsoil userReview and termSent to the competent body by notification. The central commission reviews the analysis only if actual indicators differ from the design ones by more than 10 % and the analysis reasonably shows that the development project must be changed.BasisSubsoil Code, Arts. 125(1), 142(2), (7), (8), 147(3)Unified Rules on rational and integrated subsoil use, para. 162Central Commission (TsKRR) regulation, para. 9
ClosureThe project for liquidating the consequences of subsoil use; the project for conserving the subsoil areaThe liquidation project is approved and submitted for review within two months of the subsoil use right endingThe step in the field stages Drafted byA licensed design organisation — under a technical assignment approved by the subsoil userApproved byThe subsoil userReview and termAgreements and reviews under the legislation on environmental protection, subsoil, industrial safety, sanitary and epidemiological welfare and land; if the project involves construction — also under construction legislation.BasisSubsoil Code, Arts. 126–128Hydrocarbon suspension and abandonment rules, Annexes 5 and 8

How the reviews run and how long they take

  • The central commission on the exploration and development of hydrocarbon fields (known by its Russian abbreviation, ЦКРР) takes a basic project document only when the applicant already holds an environmental conclusion: the scoping conclusion and/or a screening conclusion that a mandatory assessment is not needed, or the conclusion on the results of the impact assessment.

  • The project, an annotation and an application on the set form are filed with the commission electronically, in DOCX and PDF. The application names the design organisation that developed the document.

  • The review is held with independent experts in geology and development; the independent expertise is paid for by the subsoil user. The expert has 20 working days for an exploration or trial production project and 30 working days for a development project or analysis. An expert who took part in preparing the project, or is affiliated with those who drew it up or approved it, is not engaged.

  • The fee cap for the independent expertise runs from “no more than 0.6 million tenge” to “no more than 3 million tenge”, depending on the stage and the size of the field.

  • A copy of the expert conclusion is sent to the subsoil user within five working days of its signing. Grounds for a negative conclusion include non-compliance with the legislation or the contract, with the requirements for the document's content, structure and formatting, or with good subsoil-use practice, and unreliable reserves data in a development project.

  • Until 1 January 2030 a number of project-document indicators count as contract obligations: well grid density, the ratio of producers to injectors, the compensation coefficient by pool, pressure ratios, the maximum gas factor, production and reinjection volumes, and well commissioning. They are not written into the contract but taken from the project documents.

  • Design documentation for construction on which building has not started within three years of approval is treated as outdated: it is corrected, reviewed again and re-approved.

  • Under contracts concluded before the Subsoil Code, work may continue under project documents approved under the earlier legislation; changes to them are made under the Code's rules.

Environmental documents that go with the projects

  • The report on possible impacts is prepared by holders of the licence for works and services in environmental protection. The compiler answers to the initiator for the report's quality.

  • An environmental impact assessment is mandatory, among other cases, for commercial production of oil above 500 tonnes a day or gas above 500 thousand m³ a day, for pipelines with a diameter above 800 mm and/or longer than 40 km, oil storage of 200 thousand tonnes and more, and oil refineries and gas processing plants. Hydrocarbon exploration and production, surface industrial facilities for producing oil and gas and pipelines longer than 5 km are subject to mandatory screening.

  • In the edition of the Environmental Code in force since September 2026, for activity under technical project documents during hydrocarbon exploration an impact assessment is not mandatory and no notice of planned activity has to be filed for screening. This does not apply to exploration at sea.

  • Where a mandatory assessment is not needed, the simplified procedure applies: the “Environmental protection” section within the design documentation and the draft emission standards. Draft emission standards for category I objects are developed by a holder of the same environmental licence.

  • Hydrocarbon production and processing and exploration at sea are category I objects; exploration other than at sea is category II. The state environmental review of design documentation is carried out within the environmental permit procedure; no separate conclusion is issued.

  • The conclusion on the results of the impact assessment has no expiry date, but lapses if the activity is not started within three years of its date.

Who may prepare project documents

Three kinds of documents need three different licences: in the hydrocarbons sphere — for subsurface documents, for design activity — for construction objects, and in environmental protection — for the report on possible impacts and the draft emission standards of category I objects. One organisation may hold all three or just one.

Subsurface documents: the hydrocarbons licence

  • The “Licence for works and services in the hydrocarbons sphere” has 13 sub-types. Two are design sub-types: sub-type 11, “Drafting basic project documents for hydrocarbon fields and analysing the development of hydrocarbon fields”, and sub-type 12, “Drafting technical project documents for hydrocarbon fields”. The licence is inalienable, class 1.

  • The Subsoil Code requires a licensed design organisation for all project documents, for the reserves estimate and operational estimate reports, and for the development analysis. The Unified Rules repeat it for technical drilling projects, and the conservation and liquidation rules for conservation and liquidation projects.

  • The licence is issued or refused within 30 working days. The licence fee in this sphere is charged per sub-type.

  • What a licensee must have. An office at the address given in the application. For basic documents and development analysis — licensed software for geological modelling of fields and hydrodynamic modelling of reservoirs, computers, a printer, a plotter of up to A0, downhole tools for field studies and a winch unit. For technical documents — licensed software for designing well drilling, computers, a printer and a plotter. A technical manager with higher technical education in hydrocarbons and at least three years' experience, and three specialists with at least two years' experience. Compliance is checked with a visit to the applicant.

Field facilities and plants: the design licence and its category

  • In architecture, urban planning and construction there are the “Licence for survey activity” and the “Licence for design activity”; both are inalienable, class 1. The sub-types of the design licence include the design of engineering systems and networks, among them “trunk oil pipelines, petroleum product pipelines, gas pipelines (medium and high pressure gas supply)”, and the technological design of industrial objects — energy, the processing industry and others. Oil and gas production is not named among the technological-design sub-types.

  • The annex to the licence states the licensee's category. Category I — objects of all levels of responsibility. Category II — objects of the second and third levels, and of the first level only as a subcontractor. Category III — objects of the third level, and of the first and second levels only as a subcontractor. The licensor assigns the category when issuing the licence.

  • The object's level of responsibility is set by the customer and confirmed by the design organisation. The first (elevated) level includes, among others, hazardous production facilities not listed separately in the Rules that have the features set in Articles 70 and 71 of the Law on Civil Protection; tanks for oil, petroleum products and liquefied gas of 10,000 m³ and more; gas distribution above 1.2 MPa; and trunk oil and product pipelines of classes I and II. The second level includes such tanks of a smaller volume and trunk oil and product pipelines of classes III and IV.

  • It follows from these provisions that an object of the first level of responsibility may be designed under a direct contract only by a category I licensee; category II and III licensees may work on it only as subcontractors.

  • Licences are issued by the local executive bodies of the capital, the regions and the cities of national significance that exercise state architectural and construction control and supervision. When the composition of the founders changes, the licence is reissued with a new check of the qualification requirements.

  • The qualification requirements in force since 1 July 2026. Category III: at least one attested engineering and technical worker on the staff (chief project engineer, chief project architect, chief designer or lead design engineer), an office owned or leased for at least a year, and software for calculations and drawings. Category II: in addition, at least five years' experience as a licensee and at least five completed objects of the second and/or third level as general contractor, or at least ten objects of the first and/or second level as a subcontractor. Category I: at least ten years' experience as a licensee — or at least seven years for those who designed offshore oil and gas projects in Kazakhstan, or at least five years as a category II licensee — and at least ten objects of the first and/or second level as general contractor, or at least twenty as a subcontractor. Experience is counted from the date of the licence and is annulled if the licence ends.

  • Specialists. Applicants and licensees must have on their staff specialists who have passed certification; a certified specialist may not work part-time in other organisations doing the same activity. The Construction Code's articles on certification take effect on 1 July 2028; until then a specialist's certificate is equal to an attestation in architecture, urban planning and construction.

  • Design organisations are licensed, not accredited. Accreditation is required of those providing technical supervision, technical inspection, project management and comprehensive non-departmental review.

  • A construction design organisation bears civil liability for the quality and soundness of its decisions, for defects of the documentation including those found in operation, and for its subcontractors' work; it provides author's support (author supervision) until the object is commissioned.

Environmental documents: the environmental protection licence

A foreign designer

  • The acts we read contain no requirement that the designer of hydrocarbon project documents be a Kazakhstan legal entity. The Subsoil Code requires a licence, and foreigners and foreign legal entities obtain permits on an equal footing with Kazakhstan ones unless laws or international treaties provide otherwise.

  • Design and estimate documentation made by a foreign legal entity for construction in Kazakhstan, except for objects of special economic zones and special industrial zones, must follow the Kazakhstan stages, composition and mandatory norms unless a ratified international treaty provides otherwise. The Code allows a departure from this rule by decision of the customer (investor) on the conditions named in the same provision, and for objects on the unified industrialisation map.

  • When a foreign person applies for a design licence, an equivalent permit document of a foreign state counts as experience.

  • Kazakhstan citizenship is required of the independent experts of the central commission — together with higher education in oil and gas and at least 15 years' experience.

Buying design work

  • Hydrocarbon subsoil users and their contractors buy goods, works and services by open tender, from a single source, by open reverse tender (electronic bidding), on commodity exchanges and — under a separate list — outside these methods.

  • When the winner is chosen, the bid price of a Kazakhstan producer of works and services is conditionally reduced by twenty per cent. Such a producer is an individual entrepreneur or a legal entity created under Kazakhstan law and located in Kazakhstan in which Kazakhstan citizens make up at least 95 % of the employees, not counting managers and specialists working under an intra-corporate transfer. For the discount to apply, the bidder files a statement of staff numbers. With equal prices the Kazakhstan producer is preferred.

  • When the tender covers a licensed activity, the bid must contain copies of the licences; non-residents file the same or equivalent documents.

  • The services of a design organisation and author supervision may be bought as one lot; so may design and turnkey construction. A subcontractor may not engage further subcontractors.

  • Single-source purchase is allowed for changes and additions to design or pre-design documentation from the supplier that developed it, and for the development analysis from the developer of the design or pre-design documentation. Author supervision services and the services of the independent experts engaged by the central commission and by the reserves commission are bought outside the procurement methods.

  • The share of in-country value in the works and services bought in a calendar year must be at least 70 %; this does not apply to complex projects in the Kazakhstan sector of the Caspian. The calculation under the unified methodology takes into account the share of the payroll of Kazakhstan staff in the supplier's total payroll. The 70 % rule does not extend to contracts concluded before the Code took effect.

  • These procurement rules do not apply to subsoil users that buy under the public procurement legislation or, as natural monopolies, under the natural monopolies legislation, to legal entities in which the national managing holding owns, directly or indirectly, fifty per cent or more of the voting shares (participation interests), or to complex projects. National managing holdings, national holdings, national companies and organisations in which they own fifty per cent or more of the voting shares (participation interests) buy under the Law on Procurement of Certain Quasi-Public Sector Entities, and under production sharing agreements and the contract approved by the President the procedures of those agreements apply.

What we found no direct answer to in the acts

In both cases ask the designer for all its licences with their annexes and check the requirements with the licensor before signing the contract.

Choosing a designer: questions to check

A neutral list of what is worth asking and checking before a contract. It is built on the legal requirements from the sections above; we do not rate organisations.

  1. 1

    Which document you need

    Decide what kind of document it is: a basic or a technical subsurface document, a field facilities project, an environmental document. The licence and its sub-type depend on that. Not every organisation covers every line of work — see the “Disciplines” column in the comparison.

  2. 2

    The licences and their annexes

    Ask for the licence numbers and annexes: sub-type 11 or 12 of the hydrocarbons licence, the design licence with its category, the environmental licence. Check them in the state licence register, elicense.kz: whether the licence is valid, whether it has been reissued and whether it was issued to this legal entity. In the profiles the licences are given as the organisation itself states them.

  3. 3

    The designer's category and the object's level of responsibility

    An object of the first level of responsibility may be designed under a direct contract only by a category I licensee. The level is set by the customer and confirmed by the designer — settle it before the tender.

  4. 4

    Documents that have passed review

    Ask for examples of the same kind of document from recent years, with the numbers of the protocols and conclusions: of the central commission, the state commission on reserves, the comprehensive non-departmental review. Part of this is public — in the public hearing notices on the state environmental portal and in the state bank of construction projects.

  5. 5

    Who will do the work

    Ask who the technical manager and the specialists are, which attested engineers are on the staff, which licensed software the organisation uses and what it subcontracts. The designer answers for its subcontractors' work, and under the procurement rules a subcontractor may not engage subcontractors of its own.

  6. 6

    Where the design is made

    With international groups and joint ventures, find out which part of the design is made in Kazakhstan and who signs the documentation. As a rule, a foreign legal entity's documentation for construction in Kazakhstan must follow the Kazakhstan stages, composition and mandatory norms; the exceptions are named in the Construction Code.

  7. 7

    Author supervision and later changes

    The author of the project carries out author supervision, and corrections to construction design documentation are made by the organisation that developed it; during author supervision the design organisation may be replaced only with the author's consent. The choice is made for a long time — settle author supervision (in construction, author's support) and the handover of models and source data in the contract.

  8. 8

    Liability for quality

    In a drilling project the subsoil user is responsible for the input data, and the subsoil user and the design organisation for the quality of the project. In construction the designer bears civil liability for defects of the documentation, including those found in operation. The compiler of the report on possible impacts answers to the initiator for its quality.

  9. 9

    Review times in the project schedule

    Build the statutory terms into the schedule: the central commission's review — two months for an exploration project and three months, extendable by no more than three more, for trial production and development projects; the reserves review — three months with the same extension; the independent expert — 20 or 30 working days. The environmental conclusion is needed before filing with the commission. Construction design documentation is treated as outdated if building has not started within three years of its approval, and the impact assessment conclusion lapses if the activity is not started within three years.

  10. 10

    The terms of the purchase

    Check which procurement method you must use, whether the licences are attached to the bid, whether the 20 % conditional discount for a Kazakhstan producer of works and services applies and how the contract will affect your share of in-country value.

  11. 11

    Conflict of interest

    The central commission includes representatives of research and design organisations. A member with a conflict of interest regarding the subsoil user or the design organisation that submitted the project does not vote on that project, and an expert who took part in preparing it is not engaged for the independent expertise.

  12. 12

    What is confirmed and what is claimed

    In the profiles, facts known only from the organisation's own words are marked “according to the company”. Check them against primary documents before deciding.

How the directory was compiled

Who is included
Organisations with a real presence in Kazakhstan — a legal entity, a branch or a permanent office — that themselves prepare project documents for oil and gas. Construction contractors, equipment vendors and consultants with no design output are not included.
Where the facts come from
The organisations' official websites; state registers and portals — public hearing notices, the public procurement register, the licence register, the bank of construction projects, the depository of financial statements; the annual reports of parent companies; business and trade media. Every profile carries its list of sources. Links to state portals lead to the portal itself rather than to individual records, because the records contain personal data of company representatives.
What “according to the company” means
It marks facts we found only with the organisation itself — on its website or in its materials — and could not confirm by a register, an official document or a press publication. Most often these are lists of services and completed projects. Facts without the mark are confirmed by a state register or an official document, or were published in the business or trade press.
Licences
The licences in the profiles are given as the organisation itself states them: from the documents it publishes, or from the state licence register where the record could be opened. Licences are reissued — check the current status in the register before a contract.
No ratings
We compile no ratings and do not judge the quality of anyone's work. Being in the directory is not a recommendation, and being absent is not a judgement: it means we did not find information about the organisation or have not checked it yet.
Contacts and personal data
Contacts are company-level only, as the organisation itself publishes them: the office address, the switchboard phone, the general mailbox. The directory carries no names of employees or owners; owners are described as a state group, a private company or group, or an international group.
Date checked
The data was checked on 2 October 2026. Organisations are reorganised and move — if you see an inaccuracy, tell us.

See also

Reference material — not legal advice and not a recommendation of any organisation. Legislation as of 2 October 2026; check the current versions of the acts before making decisions.