Construction NS

Service companyAktau+1constructionns.kz

What they do

Design company based in Aktau with a second office in Astana; its own website calls it a design and construction company.

The state public-hearings portal names it as the design organisation or developer in 11 notices of 2024–2026: small field-facility working designs for Mangystau producers — the Tenge, Arman, Karakuduk, Dunga and North Buzachi fields — and the environmental documents that go with them.

The title page of its 2025 working design for the facilities of well No. 213 and the reconstruction of the TsPU-2 unit at the Arman field cites a category I licence, GSL No. 21016535 of 26 April 2021. The company's website covers civil design, legalisation of alterations and supervision, and says nothing about its oil and gas work.

Key competencies

  • Small field-facility designs at producing fields in Mangystau
  • Environmental documentation for field-facility projects
  • Category I licence GSL No. 21016535 of 26 April 2021 (as stated by the organisation on a design title page)
Legal entity
ТОО «Construction NS»
Company type
Service company

Services

  • Working designs for well facilities and gathering systems
  • Well modernisation and reconstruction of gathering points and oil metering units
  • Designs for converting production wells to injection
  • Environmental protection sections to working designs, including liquidation and land-reclamation projects
  • Draft limits for permissible emissions and discharges
  • Waste management and environmental control programmes
  • Civil and industrial design: sketch and working designs of buildings, engineering networks (according to the company)
  • Technical inspection, author and technical supervision (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Locations

Regions

Offices, bases and facilities

  • AktauHeadquarters
  • AstanaOffice

Projects and clients in Kazakhstan

As reported in public sources
  • JV Arman – working design for the facilities of well No. 213 and reconstruction of the TsPU-2 unit at the Arman field (contract of 21 November 2024; public hearing 25 July 2025)
  • TENGE Oil & Gas – facilities for 22 wells and the gathering system at the Tenge field: design organisation (hearing 7 February 2025)
  • TENGE Oil & Gas – well modernisation and reconstruction of the oil treatment unit at Tenge, together with Inzhenernyi Tsentr LLP (hearing 30 July 2026)
  • Dunga Operating GmbH – reconstruction of the commercial oil metering site at the Dunga field (hearing scheduled for 7 October 2026)
  • Karakudukmunai – correction of the working design for converting wells between production and injection at Karakuduk, together with KJS Project & Consulting (hearing 9 October 2024); a further Karakudukmunai notice names Construction NS alone as developer (hearing 27 November 2024)
  • Buzachi Operating Ltd – environmental section to the working design optimising 49 existing wells at North Buzachi (hearing 26 March 2026)
  • Embavedoil – environmental section to the liquidation design for a filtration field at the South Kamyskul field (hearing 16 June 2026)
  • Meerbusch – emission and discharge limits, waste management and environmental control programmes for 2026 and 2027 (hearings 22 October 2025 and 30 September 2026)
  • KazAzot – environmental section to a land-reclamation working design after construction of the Shagyrly–Shomyshty–Kosbulak road (hearing 18 March 2025)

Data sources

Report an error

Profile compiled from public sources and checked on October 2, 2026. Something out of date? Let us know.

Similar companies

KMG Engineering

Service companyAstana +2

Research and design institute of the KazMunayGas group, with its head office in Astana and two branches — KazNIPImunaygas in Aktau and the Atyrau branch; the sole participant of the LLP is NC KazMunayGas JSC. The legal entity was created on 12 March 2014 as the KazMunayGas Research Institute of Production and Drilling Technologies LLP — according to the company, on the basis of the Kazakh Institute of Oil and Gas JSC (KING) and its subsidiary institutes — and was renamed KMG Engineering on 4 May 2019; KING itself did not become part of the institute and has been a separate private company since 2015. In May 2018 the subsidiary institutes became branches: KazNIPImunaygas (which traces its history to the KazNIPIneft institute, 1970) prepares project documents for the Mangystau assets — Ozenmunaigas, Mangistaumunaigaz, Karazhanbasmunai and the KazGPZ gas processing plant — and the Atyrau branch (the former NII Caspiymunaygas LLP) for Embamunaigas and assets in Aktobe, Kyzylorda and West Kazakhstan regions; the head office, according to the company, handles management, monitoring of exploration projects, conceptual design and design review. The branches prepare exploration work projects, reserves estimates, field development projects, technical designs for well construction, working designs of field facilities and environmental documentation; according to the company, they also run laboratory centres (core, PVT, oilfield chemistry, drilling fluids). The institute works almost exclusively for KMG group companies and their joint ventures; the private NIPI Kaspiymunaigaz JSC in Atyrau is a separate organisation and not part of the institute.

VerifiedLocal (KZ)Design institutes

KazTransOil Research and Development Centre (CIR)

Service companyAstana +2

In-house research and design centre of KazTransOil JSC — a branch of the company, not a separate legal entity; it is based in Astana, with design-estimate bureaus also in Aktau and Pavlodar. According to the company, it was created on 3 September 2000 as the Science and Technology Centre branch and renamed the Research and Development Centre in May 2020; since 25 December 2023 it has been located at M. Gabdullin Street 2 in Astana. It prepares design-estimate documentation for the investment programme and overhaul of KazTransOil's own facilities — trunk oil pipelines, oil pumping stations, tanks and tank farms — together with the environmental sections and emission-limit projects for them. According to the company, the centre runs laboratories for oil and petroleum products, physical and chemical methods, and corrosion; at the end of 2025 the branch had 127 employees (KazTransOil annual report). It designs only for KazTransOil itself: no work for outside clients was found in public sources, and all licences are held by KazTransOil JSC.

VerifiedLocal (KZ)Design institutes

NIPIneftegaz

Service companyAktau +5

A privately owned oil and gas research and design institute headquartered in Aktau, set up in 1997 and given its present name in 2025; according to the company, it was founded as NIPIneftegaz CJSC and has offices in Almaty, Astana, Oral (Uralsk), Kyzylorda and Atyrau. In 2007 the institute described itself as created on the basis of the KazNIPIneft institute; it is not that institute's legal successor: according to the history published by KMG Engineering LLP, the legal succession of KazNIPIneft leads to that company. According to the company, the institute prepares reserves estimates, exploration, trial production and field development projects, technical projects for well construction, designs of field facilities and industrial plants and environmental documents, and studies core and reservoir fluids in its own laboratory centre. State portals confirm that in 2022–2026 it was named as developer of the development projects for the Karaturun Morskoe, Munaibay, Karamandybas North and Tuzkol fields and of facilities projects at the Dunga field, and a subsoil user's filing names it as the author of the Karabulak North reserves estimate approved by the State Commission on Reserves in 2022; work for Tengizchevroil, KPO and NCOC is listed only on the institute's own site. As stated by the organisation, it holds state licences for the design of mining production in the oil and gas sector (class 1), environmental design and standard-setting, category I design and engineering surveys; its testing laboratory is accredited until 6 October 2030 (register of the National Accreditation Centre), and its average headcount in 2025 was 311 (annual statements filed with the state depository).

VerifiedLocal (KZ)Design institutes