Skip to content
Brent$117.6Gas TTF$1,192USD453.87 ₸
MunaiHub

TKJV (Technip Energies)

EPC / Engineering · Service companyKaraganda+3ten.com

What they do

Kazakhstan-registered joint venture of Technip Energies (France) and the Karaganda Promstroyproekt Institute LLP (KPSP), created in 2019; according to Technip Energies, the partners hold equal shares. Its head office is in Karaganda and, according to the company, it has branch offices in Atyrau, Aksai and Almaty.

According to the company, it provides conceptual studies, pre-FEED, FEED and detailed engineering for operating fields, as well as project management consultancy (PMC).

In July 2021 Technip Energies reported a five-year frame agreement between TKJV and NCOC for the Aktote, Kairan and Kashagan fields, from conceptual studies to pre-FEED; on 18 June 2024 Technip Energies, through TKJV, signed a five-year services frame agreement with Karachaganak Petroleum Operating, from consulting and concept to detailed engineering. A state public-hearing notice for a hearing on 22 June 2026 names TKJV as the developer of the design documentation for the tie-in and hook-up of well 98102 at the Karachaganak field.

Key competencies

  • Karachaganak field engineering
  • Concept and pre-FEED work for North Caspian fields (according to Technip Energies)
  • Joint venture with the Kazakh design institute KPSP (50% Kazakh equity, according to Technip Energies)
  • Category I design licence (as stated on the company's page; number not published)
Legal entity
ТОО «TKJV (ТИКЕЙДЖЕЙВИ)» (TKJV LLP)
Company type
EPC / Engineering, Service company
Group headquarters
France
Founded
2019

Services

  • Conceptual, feasibility and concept-select studies
  • Field master plans (with Genesis) (according to the company)
  • Pre-FEED engineering
  • FEED and basic engineering
  • Detailed engineering for operating fields
  • Debottlenecking of onshore and offshore facilities (according to Technip Energies)
  • Project management consultancy (PMC) and owner's engineer services
  • EPC projects (as stated by the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Upstream (E&P)OffshoreGas processing

Categories

Locations

Regions

Offices, bases and facilities

  • KaragandaHeadquarters
  • AtyrauOffice
  • AksaiOffice
  • AlmatyOffice

Projects and clients in Kazakhstan

As reported in public sources
  • KPO – design documentation for the tie-in and hook-up of well 98102 at the Karachaganak field: named developer (state public-hearing notice; hearing 22 June 2026)
  • KPO – five-year long-term services frame agreement, from consulting and concept to detailed engineering, signed by Technip Energies through TKJV (18 June 2024; reported by Oil & Gas Journal)
  • NCOC – five-year frame agreement for the Aktote, Kairan and Kashagan fields: concept-select studies, pre-FEED for the Kashagan upgrade and extension, debottlenecking of onshore and offshore facilities (announced 2 July 2021; according to Technip Energies)

Data sources

Report an error

Similar companies

WoodKSS (Wood)

EPC / EngineeringAtyrau +2

Kazakhstan-registered joint venture of Wood (UK; owned by Sidara since 10 March 2026) and OGCC KazStroyService JSC: founded in 2007 as PSN KazStroy JSC, renamed WOOD KSS in 2021 and converted into a limited liability partnership in August 2022. Its head office is in Atyrau, with a branch in Almaty and offices in Aktau and at Tengiz. According to the company, it has more than 400 employees and provides engineering from feasibility, concept and pre-FEED studies through FEED and detailed design, including modifications of operating facilities, together with project management, EPC/EPCm delivery, asset integrity and operations support. As stated by the organisation, it holds state licences for design activity of category I (No. 22015392, first issued on 14 December 2016), construction and installation works of category I, and engineering surveys. On 29 May 2026 the company announced a new engineering and project-support contract with Tengizchevroil; it follows the master services agreement of 2019 and, as the company describes it, covers an expanded scope of specialist project management services.

VerifiedInternationalEPC / Engineering

Worley

EPC / EngineeringAtyrau +2

Kazakhstan business of the international engineering company Worley (Australia) — WorleyParsons Kazakhstan LLP, with an office in Atyrau. According to the company, Worley has worked in Kazakhstan for more than 25 years and provides FEED, detailed engineering and EPCM as well as construction, turnaround and maintenance services. On Tengizchevroil's Future Growth Project – Wellhead Pressure Management Project (FGP-WPMP) Worley was a member of the Fluor-led KPJV joint venture; the company describes its own part as FEED and detailed EPCM for the wellhead pressure management scope, carried out by its engineering centres in Atyrau, Almaty and Aktau. The Petroleum journal reported that a consortium of WorleyParsons Kazakhstan LLP and KGNT completed the FEED for stage 1 of the Karachaganak Expansion Project (KEP-1) in autumn 2019. A services framework agreement with Tengizchevroil, which the company calls long-term and which was reported by Oil & Gas Journal and World Oil, has been in effect since February 2026.

VerifiedInternationalEPC / Engineering

ILF Kazakhstan

EPC / EngineeringAlmaty +1

Kazakhstan company of the international engineering group ILF Consulting Engineers (Austria and Germany) — ILF Kazakhstan LLC, with offices in Almaty (head office) and Atyrau. According to the company, ILF in Kazakhstan was established in 1994; the group's timeline lists a new Almaty office under 2004–2005 and the Atyrau office under 2019. According to the company, it provides design engineering, technical audits and project management consultancy (PMC) and holds a category I state design licence. The company reports that it is carrying out the FEED and detailed design for the next phase of the Beineu–Bozoy–Shymkent gas pipeline (1,600 km of pipeline and six compressor stations; 2025) and that in 2021 a joint venture it belongs to won a five-year NCOC framework contract for conceptual studies, pre-FEED and FEED. The Samruk-Kazyna procurement portal confirms consultancy contracts: project management for the Kenderli seawater desalination plant for Ak Su KMG (2022) and a technical audit for Intergas Central Asia (2021–2022).

VerifiedInternationalDesign institutes