EON Energo

EPC / Engineering · ContractorAktau+1eon.kz

What they do

Engineering company with an office in Aktau and a design department on the site of the Pavlodar Petrochemical Plant. According to the company, it was founded in 2005, provides design, equipment supply and construction for refining and petrochemicals, and its design department is the former in-house design office of the Pavlodar plant, which moved to KGNT in 2018, to KING in 2019 and to EON Energo in 2021.

Thirteen public-hearing notices on the state portal (2021–2026) name the company as developer of documentation for the Atyrau Refinery and the Pavlodar Petrochemical Plant: expansion of a hydrogen compressor station, a coke-chamber block, off-gas compression, reconstruction of an oil metering unit. Much of the material published for these projects consists of environmental protection sections and impact reports.

The 2020 licences shown on its website — design activity of category I, engineering surveys, and environmental protection works and services — are marked as re-issued in the state register; the current documents are not published on the site.

Key competencies

  • Brownfield projects at operating refineries
  • Design department that was formerly the Pavlodar plant's in-house design office (according to the company)
  • Environmental documentation for refinery projects
  • Category I design licence (as stated by the organisation)
Legal entity
ТОО «Эон энерго» (EON Energo LLP)
Company type
EPC / Engineering, Contractor
Founded
2005

Services

  • Working designs for reconstruction and revamp of refinery process units
  • Design of compressor and pump stations and pump cooling systems
  • Revamp design for process control systems of process units
  • Oil metering unit design
  • Environmental protection sections and impact reports
  • All sections of a working design by its own design department (according to the company)
  • Support through expert review and author supervision (according to the company)
  • Equipment supply, construction, installation and commissioning (according to the company)
  • Turnkey (EPC) projects in refining and petrochemicals (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Locations

Regions

Offices, bases and facilities

  • AktauHeadquarters
  • PavlodarOffice

Projects and clients in Kazakhstan

As reported in public sources
  • Atyrau Refinery – expansion of the hydrogen compressor station at the Prime D gas-oil hydrotreating and dewaxing unit: developer of documentation (public hearing 24 December 2024)
  • Atyrau Refinery – coke-chamber block: developer of documentation (hearings 21 January and 13 March 2025)
  • Atyrau Refinery – off-gas compression block for the ELOU-AT-2, ELOU-AVT-3 and delayed coking units (hearings 9 June 2025 and 25 May 2026)
  • Atyrau Refinery – revamp of the process control system of the LG 35-11/300-95 aromatics unit (hearing 11 March 2025)
  • Atyrau Refinery – reconstruction of the Martyshi oil metering system (hearing 26 May 2026)
  • Atyrau Refinery – new pump station for loading gasoline and jet fuel (hearing 14 October 2024)
  • Atyrau Refinery – infrastructure for unloading naphtha and the kerosene–gas oil fraction: developer of the impact report (hearing 18 March 2025)
  • Pavlodar Petrochemical Plant – lump-sulphur remelting unit: impact report (hearings 22 September 2026)
  • Pavlodar Petrochemical Plant – SENIM-D integrated working design, LPG Merox treating unit, pump cooling system and process control revamp of primary processing units (according to the company; undated)
  • Atyrau Refinery – working design for reconstruction of the delayed coking unit (according to the company; undated)

Data sources

Report an error

Profile compiled from public sources and checked on October 2, 2026. Something out of date? Let us know.

Similar companies

KazTransOil Research and Development Centre (CIR)

Service companyAstana +2

In-house research and design centre of KazTransOil JSC — a branch of the company, not a separate legal entity; it is based in Astana, with design-estimate bureaus also in Aktau and Pavlodar. According to the company, it was created on 3 September 2000 as the Science and Technology Centre branch and renamed the Research and Development Centre in May 2020; since 25 December 2023 it has been located at M. Gabdullin Street 2 in Astana. It prepares design-estimate documentation for the investment programme and overhaul of KazTransOil's own facilities — trunk oil pipelines, oil pumping stations, tanks and tank farms — together with the environmental sections and emission-limit projects for them. According to the company, the centre runs laboratories for oil and petroleum products, physical and chemical methods, and corrosion; at the end of 2025 the branch had 127 employees (KazTransOil annual report). It designs only for KazTransOil itself: no work for outside clients was found in public sources, and all licences are held by KazTransOil JSC.

VerifiedLocal (KZ)Design institutes

KMG Engineering

Service companyAstana +2

Research and design institute of the KazMunayGas group, with its head office in Astana and two branches — KazNIPImunaygas in Aktau and the Atyrau branch; the sole participant of the LLP is NC KazMunayGas JSC. The legal entity was created on 12 March 2014 as the KazMunayGas Research Institute of Production and Drilling Technologies LLP — according to the company, on the basis of the Kazakh Institute of Oil and Gas JSC (KING) and its subsidiary institutes — and was renamed KMG Engineering on 4 May 2019; KING itself did not become part of the institute and has been a separate private company since 2015. In May 2018 the subsidiary institutes became branches: KazNIPImunaygas (which traces its history to the KazNIPIneft institute, 1970) prepares project documents for the Mangystau assets — Ozenmunaigas, Mangistaumunaigaz, Karazhanbasmunai and the KazGPZ gas processing plant — and the Atyrau branch (the former NII Caspiymunaygas LLP) for Embamunaigas and assets in Aktobe, Kyzylorda and West Kazakhstan regions; the head office, according to the company, handles management, monitoring of exploration projects, conceptual design and design review. The branches prepare exploration work projects, reserves estimates, field development projects, technical designs for well construction, working designs of field facilities and environmental documentation; according to the company, they also run laboratory centres (core, PVT, oilfield chemistry, drilling fluids). The institute works almost exclusively for KMG group companies and their joint ventures; the private NIPI Kaspiymunaigaz JSC in Atyrau is a separate organisation and not part of the institute.

VerifiedLocal (KZ)Design institutes

NIPIneftegaz

Service companyAktau +5

A privately owned oil and gas research and design institute headquartered in Aktau, set up in 1997 and given its present name in 2025; according to the company, it was founded as NIPIneftegaz CJSC and has offices in Almaty, Astana, Oral (Uralsk), Kyzylorda and Atyrau. In 2007 the institute described itself as created on the basis of the KazNIPIneft institute; it is not that institute's legal successor: according to the history published by KMG Engineering LLP, the legal succession of KazNIPIneft leads to that company. According to the company, the institute prepares reserves estimates, exploration, trial production and field development projects, technical projects for well construction, designs of field facilities and industrial plants and environmental documents, and studies core and reservoir fluids in its own laboratory centre. State portals confirm that in 2022–2026 it was named as developer of the development projects for the Karaturun Morskoe, Munaibay, Karamandybas North and Tuzkol fields and of facilities projects at the Dunga field, and a subsoil user's filing names it as the author of the Karabulak North reserves estimate approved by the State Commission on Reserves in 2022; work for Tengizchevroil, KPO and NCOC is listed only on the institute's own site. As stated by the organisation, it holds state licences for the design of mining production in the oil and gas sector (class 1), environmental design and standard-setting, category I design and engineering surveys; its testing laboratory is accredited until 6 October 2030 (register of the National Accreditation Centre), and its average headcount in 2025 was 311 (annual statements filed with the state depository).

VerifiedLocal (KZ)Design institutes