MunaiHub

Aktau Engineering

Service companyAktauaktauengineering.kz
VerifiedKazakhstan companyDesign institutesEPC / Engineering

What they do

A private design company based in Aktau (Aktau Engineering LLP), classed as a small enterprise in the state procurement register; its design and survey licences were first issued in 2007, as stated by the organisation.

According to the company, it prepares working designs for oil-field facilities in Mangystau — pads and hook-ups of production and injection wells, oil and gas gathering and in-field transport systems, metering units, tank farms, camps and utilities — as well as engineering and geodetic surveys, cost estimates and environmental protection sections for its own projects.

The state public-hearings portal confirms two of its projects for Phystech II JSC at the Karazhanbas Severny field: a group working design for the construction of production wells (2019) and a working design for facilities of four wells being converted to injection (2021). In 2025 the portal names the company as developer of environmental documentation and of a working design for the uranium producer JV KATCO LLP.

According to the company, it has also designed facilities at the Dunga, Zhalgiztobe, North Buzachi and Tenge fields; the list of completed projects on its site covers 2007–2023.

Key competencies

  • Well facilities at Mangystau oil fields
  • Design for construction of production wells
  • Engineering and geodetic surveys for field-facility projects
  • Category I design licence No. 18021462 of 28.11.2018 (as stated by the organisation)
  • Survey licence MKL No. 0000334 of 19.02.2020 (as stated by the organisation)
  • Licence for process design in the oil and gas sphere No. 15011534 of 18.06.2015 (as stated by the organisation)
Legal entity
ТОО «Актау Инжиниринг»
Company type
Service company
Founded
2006

Services

  • Working designs for well facilities: pads, hook-ups, conversion to injection
  • Group working designs for construction of production wells
  • Engineering and geodetic surveys
  • Environmental protection sections for projects
  • Oil and gas gathering and in-field transport systems, metering units (according to the company)
  • Tank farms, sales-oil pipelines, pressure-maintenance systems (according to the company)
  • Field infrastructure: camps, roads, power supply, water pipelines, boiler houses (according to the company)
  • Sites for treatment of oily waste and drilling waste (according to the company)
  • Cost estimates, author and technical supervision (according to the company)
  • Design of civil buildings, feasibility studies for gas and water supply (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Upstream (E&P)Mining

Categories

Locations

Regions

Offices, bases and facilities

  • AktauHeadquarters

Projects and clients in Kazakhstan

As reported in public sources
  • Phystech II JSC – Karazhanbas Severny field: working design for facilities of wells 213, 255, 2144 and 277 converted from production to injection, with engineering and geodetic surveys (2021)
  • Phystech II JSC – Karazhanbas Severny field: group working design for construction of production wells, Jurassic and Neocomian horizons (2019)
  • JV KATCO LLP (uranium producer) – Moinkum deposit, Tortkuduk site: environmental documentation for a mobile drilling-mud preparation station and for well-workover solution pipelines (2025)
  • Total E&P Dunga – Dunga field: facilities of wells DGA-50G, 51G and 52G converted to injection, modernisation of well pads and of the central processing facility (2007–2023, according to the company)
  • Karazhanbas Severny field – pads for 45 production wells in pilot operation, group metering units, gathering system, tank farm, sales-oil pipeline, camps (2007–2023, according to the company)
  • Zhalgiztobemunai – Zhalgiztobe field facilities: oil treatment unit, hot-water injection units, tanks, access roads and pads for production wells (2007–2023, according to the company)
  • Buzachi Operating – North Buzachi field: fire station, 25 km water pipeline, boiler house; Tenge field: reconstruction of an oil treatment point (2007–2023, according to the company)
  • Marine operations support base and fuel depot in Bautino, oily-waste treatment sites, a gas filling station in Shetpe (2007–2023, according to the company)

Data sources

Report an error

Similar companies

KMG Engineering

Service companyAstana +2

Research and design institute of the KazMunayGas group, with its head office in Astana and two branches — KazNIPImunaygas in Aktau and the Atyrau branch; the sole participant of the LLP is NC KazMunayGas JSC. The legal entity was created on 12 March 2014 as the KazMunayGas Research Institute of Production and Drilling Technologies LLP — according to the company, on the basis of the Kazakh Institute of Oil and Gas JSC (KING) and its subsidiary institutes — and was renamed KMG Engineering on 4 May 2019; KING itself did not become part of the institute and has been a separate private company since 2015. In May 2018 the subsidiary institutes became branches: KazNIPImunaygas (which traces its history to the KazNIPIneft institute, 1970) prepares project documents for the Mangystau assets — Ozenmunaigas, Mangistaumunaigaz, Karazhanbasmunai and the KazGPZ gas processing plant — and the Atyrau branch (the former NII Caspiymunaygas LLP) for Embamunaigas and assets in Aktobe, Kyzylorda and West Kazakhstan regions; the head office, according to the company, handles management, monitoring of exploration projects, conceptual design and design review. The branches prepare exploration work projects, reserves estimates, field development projects, technical designs for well construction, working designs of field facilities and environmental documentation; according to the company, they also run laboratory centres (core, PVT, oilfield chemistry, drilling fluids). The institute works almost exclusively for KMG group companies and their joint ventures; the private NIPI Kaspiymunaigaz JSC in Atyrau is a separate organisation and not part of the institute.

VerifiedLocal (KZ)Design institutes

KazTransOil Research and Development Centre (CIR)

Service companyAstana +2

In-house research and design centre of KazTransOil JSC — a branch of the company, not a separate legal entity; it is based in Astana, with design-estimate bureaus also in Aktau and Pavlodar. According to the company, it was created on 3 September 2000 as the Science and Technology Centre branch and renamed the Research and Development Centre in May 2020; since 25 December 2023 it has been located at M. Gabdullin Street 2 in Astana. It prepares design-estimate documentation for the investment programme and overhaul of KazTransOil's own facilities — trunk oil pipelines, oil pumping stations, tanks and tank farms — together with the environmental sections and emission-limit projects for them. According to the company, the centre runs laboratories for oil and petroleum products, physical and chemical methods, and corrosion; at the end of 2025 the branch had 127 employees (KazTransOil annual report). It designs only for KazTransOil itself: no work for outside clients was found in public sources, and all licences are held by KazTransOil JSC.

VerifiedLocal (KZ)Design institutes

NIPIneftegaz

Service companyAktau +5

A privately owned oil and gas research and design institute headquartered in Aktau, set up in 1997 and given its present name in 2025; according to the company, it was founded as NIPIneftegaz CJSC and has offices in Almaty, Astana, Oral (Uralsk), Kyzylorda and Atyrau. In 2007 the institute described itself as created on the basis of the KazNIPIneft institute; it is not that institute's legal successor: according to the history published by KMG Engineering LLP, the legal succession of KazNIPIneft leads to that company. According to the company, the institute prepares reserves estimates, exploration, trial production and field development projects, technical projects for well construction, designs of field facilities and industrial plants and environmental documents, and studies core and reservoir fluids in its own laboratory centre. State portals confirm that in 2022–2026 it was named as developer of the development projects for the Karaturun Morskoe, Munaibay, Karamandybas North and Tuzkol fields and of facilities projects at the Dunga field, and a subsoil user's filing names it as the author of the Karabulak North reserves estimate approved by the State Commission on Reserves in 2022; work for Tengizchevroil, KPO and NCOC is listed only on the institute's own site. As stated by the organisation, it holds state licences for the design of mining production in the oil and gas sector (class 1), environmental design and standard-setting, category I design and engineering surveys; its testing laboratory is accredited until 6 October 2030 (register of the National Accreditation Centre), and its average headcount in 2025 was 311 (annual statements filed with the state depository).

VerifiedLocal (KZ)Design institutes