Skip to content
Brent$117.6Gas TTF$1,192USD453.87 ₸
MunaiHub

What they do

Research and design institute of the KazMunayGas group, with its head office in Astana and two branches — KazNIPImunaygas in Aktau and the Atyrau branch; the sole participant of the LLP is NC KazMunayGas JSC. The legal entity was created on 12 March 2014 as the KazMunayGas Research Institute of Production and Drilling Technologies LLP — according to the company, on the basis of the Kazakh Institute of Oil and Gas JSC (KING) and its subsidiary institutes — and was renamed KMG Engineering on 4 May 2019; KING itself did not become part of the institute and has been a separate private company since 2015.

In May 2018 the subsidiary institutes became branches: KazNIPImunaygas (which traces its history to the KazNIPIneft institute, 1970) prepares project documents for the Mangystau assets — Ozenmunaigas, Mangistaumunaigaz, Karazhanbasmunai and the KazGPZ gas processing plant — and the Atyrau branch (the former NII Caspiymunaygas LLP) for Embamunaigas and assets in Aktobe, Kyzylorda and West Kazakhstan regions; the head office, according to the company, handles management, monitoring of exploration projects, conceptual design and design review.

The branches prepare exploration work projects, reserves estimates, field development projects, technical designs for well construction, working designs of field facilities and environmental documentation; according to the company, they also run laboratory centres (core, PVT, oilfield chemistry, drilling fluids).

The institute works almost exclusively for KMG group companies and their joint ventures; the private NIPI Kaspiymunaigaz JSC in Atyrau is a separate organisation and not part of the institute.

Key competencies

  • Base project documents for KMG group fields: from the exploration work project to the field development project
  • General designer of oil and gas gathering, treatment and transport facilities
  • Monitoring of exploration projects and the ABAI information system
  • Laboratory centres in Aktau and Atyrau, core storage (according to the company)
  • Category I design licence No. 21033641 of 20 December 2021 — as stated by the organisation
Legal entity
ТОО «КМГ Инжиниринг» (KMG Engineering LLP)
Company type
Service company
Founded
2014
Former names
ТОО «НИИ технологий добычи и бурения «КазМунайГаз» (НИИ ТДБ КМГ, 2014–2019)

Services

  • Exploration work projects and supplements to them
  • Estimation, re-estimation and addition of oil and gas reserves
  • Field development projects and supplements to them
  • Technical designs for well construction — group and individual
  • Field facilities design: working designs and design-estimate documentation with state expertise
  • Conceptual design and FEED
  • Environmental design documentation: impact reports, emission limits, waste management programmes
  • Projects for liquidation of the consequences of subsoil use
  • Research work and geological support for KMG group companies
  • Development analysis and monitoring, author supervision, geological and reservoir simulation models (according to the company)
  • Drilling supervision and online drilling support (according to the company)
  • Laboratory studies of core, reservoir fluids, drilling and cement fluids (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Upstream (E&P)OffshoreMidstream (pipelines & storage)Gas processing

Categories

Locations

Regions

Offices, bases and facilities

  • AstanaHeadquarters
  • AtyrauBranch
  • AktauBranch
  • AtyrauLaboratory

Projects and clients in Kazakhstan

As reported in public sources
  • KazMunayGas – long-term contract for integrated engineering works in the oil and gas sector (engineering, research, survey and design work), signed 25.06.2024 and valid to 31.12.2028
  • Kalamkas-Khazar Operating – FEED for development of the Kalamkas-more and Khazar fields, from January 2025 in a consortium with Forward Energy Solutions (the institute's share is 50%); settlements were suspended in December 2025
  • Ural Oil & Gas – working design "Rozhkovskoye field facilities for phase 2 of commercial development" (contract of 19.09.2025); impact report by the Atyrau branch, hearings on 21–22.10.2026
  • Embamunaigas – working design for gas gathering, treatment and transport facilities from the West Prorva field to the Tolkyn gas gathering point (contract of 19.06.2026; general designer: Atyrau branch)
  • Embamunaigas – working design of the Altykul–Karsak oil pipeline (contract of 26.12.2022; general designer: Atyrau branch, 2024)
  • Kazakhturkmunay – working design for hook-up of production well GS-1 at the East Saztobe field (general designer: Atyrau branch, 2024)
  • Urikhtau Operating – design-estimate documentation for stage 2 of the Urikhtau booster pump station upgrade and for the gas pipeline from Central Urikhtau to gas plant GPZ-3 of the Zhanazhol complex (contracts of 04.09.2024)
  • Kazakhoil Aktobe – supplement to the development project for the Alibekmola and Kozhasai fields with an EIA (contract of 29.01.2026; Atyrau branch; hearings on 26.06.2026)
  • Embamunaigas – supplement to the development project for the South-East Kamyshitovoye field (contract of 10.03.2026; Atyrau branch)
  • Akkaiyn Operating – exploration work project for the Berezovsky block in West Kazakhstan Region and the impact report for it (Atyrau branch; hearings in June 2026)
  • KazMunayGas – supplement to the project for liquidation of the consequences of exploration at the Turgai Paleozoic structure (Atyrau branch; hearings on 21.10.2025)
  • Ozenmunaigas – long-term contract for integrated engineering works (signed 30.12.2024, valid to 31.12.2029)
  • Mangistaumunaigaz – Zhetybai field development project and development project for the Aptian–Neocomian gas deposits of the Kalamkas field (KazNIPImunaygas branch, 2025)
  • Karazhanbasmunai – group technical design for construction of vertical wells at the Karazhanbas field for 2026 and the impact report for the supplement to the Karazhanbas development project (KazNIPImunaygas branch, 2026)
  • KazGPZ (Kazakh Gas Processing Plant) – working design for additional compressor units at the compressor shop in Zhanaozen (general design organisation: KazNIPImunaygas branch; hearings on 28.11.2025)

Data sources

Report an error

Similar companies

NIPIneftegaz

Service companyAktau +5

A privately owned oil and gas research and design institute headquartered in Aktau, set up in 1997 and given its present name in 2025; according to the company, it was founded as NIPIneftegaz CJSC and has offices in Almaty, Astana, Oral (Uralsk), Kyzylorda and Atyrau. In 2007 the institute described itself as created on the basis of the KazNIPIneft institute; it is not that institute's legal successor: according to the history published by KMG Engineering LLP, the legal succession of KazNIPIneft leads to that company. According to the company, the institute prepares reserves estimates, exploration, trial production and field development projects, technical projects for well construction, designs of field facilities and industrial plants and environmental documents, and studies core and reservoir fluids in its own laboratory centre. State portals confirm that in 2022–2026 it was named as developer of the development projects for the Karaturun Morskoe, Munaibay, Karamandybas North and Tuzkol fields and of facilities projects at the Dunga field, and a subsoil user's filing names it as the author of the Karabulak North reserves estimate approved by the State Commission on Reserves in 2022; work for Tengizchevroil, KPO and NCOC is listed only on the institute's own site. As stated by the organisation, it holds state licences for the design of mining production in the oil and gas sector (class 1), environmental design and standard-setting, category I design and engineering surveys; its testing laboratory is accredited until 6 October 2030 (register of the National Accreditation Centre), and its average headcount in 2025 was 311 (annual statements filed with the state depository).

VerifiedLocal (KZ)Design institutes

KazTransOil Research and Development Centre (CIR)

Service companyAstana +2

In-house research and design centre of KazTransOil JSC — a branch of the company, not a separate legal entity; it is based in Astana, with design-estimate bureaus also in Aktau and Pavlodar. According to the company, it was created on 3 September 2000 as the Science and Technology Centre branch and renamed the Research and Development Centre in May 2020; since 25 December 2023 it has been located at M. Gabdullin Street 2 in Astana. It prepares design-estimate documentation for the investment programme and overhaul of KazTransOil's own facilities — trunk oil pipelines, oil pumping stations, tanks and tank farms — together with the environmental sections and emission-limit projects for them. According to the company, the centre runs laboratories for oil and petroleum products, physical and chemical methods, and corrosion; at the end of 2025 the branch had 127 employees (KazTransOil annual report). It designs only for KazTransOil itself: no work for outside clients was found in public sources, and all licences are held by KazTransOil JSC.

VerifiedLocal (KZ)Design institutes

Witteveen+Bos Caspian

EPC / EngineeringAlmaty +2

Kazakhstan company of the Dutch consulting and engineering firm Witteveen+Bos — Witteveen+Bos Caspian LLP, with offices in Almaty, Atyrau and Aktau; according to the company, its first office in Kazakhstan opened in Aktau in 2001, followed by Atyrau in 2003 and Almaty in 2007. By its own description, it designs civil and marine infrastructure for oil and gas projects rather than process plant: artificial islands and ice-protection structures, marine access channels, ports and cargo offloading facilities, access roads, industrial wastewater treatment. According to the company, its experts have worked in Kazakhstan since 1997 and have designed Kashagan's islands since 1998; for Tengizchevroil it carried out, from 2012, the feasibility study, environmental impact assessment, surveys, FEED and detailed design of the Cargo Transportation Route (CaTRo), and for NCOC the design of the Kashagan marine access channels from pre-FEED to detailed design (the first phase of the channels was then planned to be operational at the end of 2021). NCOC's mandate for the front-end engineering of the channels was also reported by Energy Intelligence in April 2021. Outside oil and gas the company works on water management, urban mobility and remediation.

VerifiedInternationalDesign institutes