Reservoir engineering and stimulation
Reserves, inflow, PVT, fracturing, acidizing, waterflooding
Ten areas — from the reservoir and drilling to electrical, environment and payroll. Enter data in metric or field units: everything is converted to the formula's units and the result updates instantly.
One oil well from start-up to the economic limit: the well type, depletion or pressure support, a liquid plateau and a rising water cut. A monthly chart, a yearly table and CSV.
Calculations across a field's life — from the reservoir and the well to facilities, power, environment and people.
Reserves, inflow, PVT, fracturing, acidizing, waterflooding
Build-up and drawdown, skin, productivity, gas wells
Pressures and mud, hydraulics, string, cementing, trajectory
Well killing, volumes and circulation, tubing, stuck pipe
Productivity, rod pumps and ESPs, metering, chokes, forecast
Pipelines, tanks, earthworks, cathodic protection
Pumps, compressors, drives, strength and bolting
Power and current, cables, motors, transformers, energy use
Greenhouse gases, flaring, emission payments, spills, concentrations
Salary and 2026 payroll taxes, vacation and sick pay, overtime, rotations
Beshbarmak for any number of guests. The one calculation that is checked at the table.
Kazakhstan works in metric units, while many formulas and data come in US field units. Enter a value in any unit and all the others update instantly.
psi and psia are absolute pressure; gauge units (barg, MPa(g), psig) are above atmospheric (101.325 kPa = 14.696 psi). Pressure differences in the formulas do not depend on this.
Mass and volume are linked by the oil density. A year is 365 days; 1 barrel = 158.987 L.
Results are engineering estimates from standard formulas; for design decisions check them against the codes, project documents and specialists' calculations. The formulas carried over from the original set are unchanged, and their errors are described in the notes.