Engineering Centre (Aktau)

Service companyAktau+1ecenter.kz
VerifiedKazakhstan companyDesign institutesEPC / Engineering

What they do

A private design company based in Aktau (ТОО «Инженерный центр» — 'Engineering Centre' LLP), working since 2001 according to the company. It designs facilities for oil and gas fields in Mangystau and Atyrau Region: well hook-ups, pads and roads, manifold stations, flowlines and in-field pipelines, power supply; according to the company, also group metering units, field gas and oil pipelines, tank farms, oil depots and industrial facilities.

Hearing notices on the state public-hearings portal name the company as developer for these working designs: facilities of 60 wells at the North Buzachi field for Buzachi Operating Ltd (2025), facilities of seven wells of the Zhaiykmunaigas production unit for Embamunaigas JSC (2026), facilities at the Dunga and Tenge fields (2026), and a road and drilling pads for Tepke LLP (2022).

According to the company, it designed 70% of the construction facilities at the North Buzachi field and 60% of the facilities at the fields of Emir-Oil LLP, as well as a Tenaris premium connection threading plant in the Aktau special economic zone; these statements carry no dates.

As stated by the organisation, it holds a category I design licence; the licence number and date are not published on its site.

Key competencies

  • Well facilities: hook-ups, pads, roads, manifold stations
  • Projects for fields in Mangystau and Atyrau Region
  • Field gas and oil pipelines (according to the company)
  • Category I design licence (as stated by the organisation)
Legal entity
ТОО «Инженерный центр»
Company type
Service company
Founded
2001

Services

  • Working designs for oil and gas field facilities
  • Well hook-ups, pads and access roads
  • Manifold stations, flowlines and in-field pipelines
  • Power supply of field facilities
  • Reconstruction of oil treatment units
  • Drilling pads and their access roads
  • Group metering units, camps, warehouses and laboratories at fields (according to the company)
  • Field and feeder gas and oil pipelines, gas utilisation facilities (according to the company)
  • Oil depots, tank farms, fuel stores, filling stations and gas filling stations (according to the company)
  • Industrial and civil design: production bases, warehouses, plants (according to the company)
  • 3D design (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Upstream (E&P)

Categories

Locations

Regions

Offices, bases and facilities

  • AktauHeadquarters

Projects and clients in Kazakhstan

As reported in public sources
  • Buzachi Operating Ltd – working design 'Phase XVI. Stage 2. Field facilities of the North Buzachi field under commercial development': 60 wells, roads and pads, manifold stations, flowlines and in-field pipelines, power supply — named as developer in the hearing notice (2025)
  • Embamunaigas JSC – working design for facilities of seven wells of the Zhaiykmunaigas production unit, Atyrau Region: design organisation on the title page (2026)
  • Dunga Operating GmbH – drainage vessel for well-workover fluid and installation of liquid meters at production wells of the Dunga field (2026)
  • TENGE Oil & Gas LLP – well upgrades and reconstruction of the oil treatment unit at the Tenge field: developer together with another firm (2026)
  • Tepke LLP – working design for a road to the Tepke site and six drilling pads with access roads (2022)
  • Buzachi Operating – North Buzachi field: design of 70% of the construction facilities, including hook-ups, pads and roads for 2,000+ wells, group metering units, flowlines and camps (undated, according to the company)
  • Emir-Oil LLP – design of 60% of the construction facilities at the company's fields, a 42 km gas pipeline and a 20 km oil transport complex to the Kalamkas – Karazhanbas – Aktau pipeline (undated, according to the company)
  • Field gas pipeline of 220 km to the Zhanaozen – Aktau trunk gas pipeline, a 19 km gas pipeline at the Aksaz field, a gas utilisation system at the Karazhanbas field, pilot-development facilities at the Urikhtau field (undated, according to the company)
  • Tenaris – two-stage design of a premium connection threading plant in the Aktau SEZ; Sartas Teniz Port JSC – onshore support base for marine operations in Sartas Bay (undated, according to the company)

Data sources

Report an error

Similar companies

KMG Engineering

Service companyAstana +2

Research and design institute of the KazMunayGas group, with its head office in Astana and two branches — KazNIPImunaygas in Aktau and the Atyrau branch; the sole participant of the LLP is NC KazMunayGas JSC. The legal entity was created on 12 March 2014 as the KazMunayGas Research Institute of Production and Drilling Technologies LLP — according to the company, on the basis of the Kazakh Institute of Oil and Gas JSC (KING) and its subsidiary institutes — and was renamed KMG Engineering on 4 May 2019; KING itself did not become part of the institute and has been a separate private company since 2015. In May 2018 the subsidiary institutes became branches: KazNIPImunaygas (which traces its history to the KazNIPIneft institute, 1970) prepares project documents for the Mangystau assets — Ozenmunaigas, Mangistaumunaigaz, Karazhanbasmunai and the KazGPZ gas processing plant — and the Atyrau branch (the former NII Caspiymunaygas LLP) for Embamunaigas and assets in Aktobe, Kyzylorda and West Kazakhstan regions; the head office, according to the company, handles management, monitoring of exploration projects, conceptual design and design review. The branches prepare exploration work projects, reserves estimates, field development projects, technical designs for well construction, working designs of field facilities and environmental documentation; according to the company, they also run laboratory centres (core, PVT, oilfield chemistry, drilling fluids). The institute works almost exclusively for KMG group companies and their joint ventures; the private NIPI Kaspiymunaigaz JSC in Atyrau is a separate organisation and not part of the institute.

VerifiedLocal (KZ)Design institutes

NIPIneftegaz

Service companyAktau +5

A privately owned oil and gas research and design institute headquartered in Aktau, set up in 1997 and given its present name in 2025; according to the company, it was founded as NIPIneftegaz CJSC and has offices in Almaty, Astana, Oral (Uralsk), Kyzylorda and Atyrau. In 2007 the institute described itself as created on the basis of the KazNIPIneft institute; it is not that institute's legal successor: according to the history published by KMG Engineering LLP, the legal succession of KazNIPIneft leads to that company. According to the company, the institute prepares reserves estimates, exploration, trial production and field development projects, technical projects for well construction, designs of field facilities and industrial plants and environmental documents, and studies core and reservoir fluids in its own laboratory centre. State portals confirm that in 2022–2026 it was named as developer of the development projects for the Karaturun Morskoe, Munaibay, Karamandybas North and Tuzkol fields and of facilities projects at the Dunga field, and a subsoil user's filing names it as the author of the Karabulak North reserves estimate approved by the State Commission on Reserves in 2022; work for Tengizchevroil, KPO and NCOC is listed only on the institute's own site. As stated by the organisation, it holds state licences for the design of mining production in the oil and gas sector (class 1), environmental design and standard-setting, category I design and engineering surveys; its testing laboratory is accredited until 6 October 2030 (register of the National Accreditation Centre), and its average headcount in 2025 was 311 (annual statements filed with the state depository).

VerifiedLocal (KZ)Design institutes

Caspian Engineering & Research (CER)

Service companyAktau +2

A private design organisation based in Aktau (Caspian Engineering & Research LLP, abbreviated CER), registered in 2003 according to the company. It designs facilities for oil, gas and gas-condensate fields — oil and gas treatment units, gathering systems, reservoir-pressure maintenance and gas re-injection — and storage and transshipment facilities for liquefied gases and petroleum products; according to the company, also trunk pipelines and pump stations. Environmental design is a separate line of work: environmental impact assessments, reports on possible impacts, environmental protection sections and emission limits. Documents on the state public-hearings portal for 2022–2025 show the company as the design organisation of the Eskene LPG LLP liquefied petroleum gas separation plant in Atyrau Region, of the NDF KAZAKHSTAN LLP tank farm in West Kazakhstan Region and of a working design for Tepke LLP, and as one of the developers of projects for Tasbulat Oil Corporation LLP and Kom-Munai LLP and of environmental documentation for Karachaganak Petroleum Operating. According to the company, its portfolio also includes work for the Tengiz, Kashagan and Karachaganak projects and for the CPC expansion in 2004–2025.

VerifiedLocal (KZ)Design institutes