What they do

A privately owned design institute in Aktau, founded in 2000, according to the company, as an independent expert and consulting firm in geology and subsoil use and renamed OPTIMUM Design Institute LLP in 2009.

According to the company, the institute prepares reserves estimates and re-estimates (including PRMS assessments), exploration, trial production and field development projects, technical projects for well construction, field facilities designs and environmental documents, and also designs gas-chemical plants.

State documents confirm reserves re-estimates approved by the State Commission on Reserves for the Airakty (2021), Sarybulak (2023) and Kamenskoe (2024) fields, development projects for the Matin, Kamenskoe, Sarybulak and Bukharsai fields, and two reserves and resources reports published on KASE in 2018 by the issuers KazAzot and Maten Petroleum. Public-hearing notices of 2022–2026 name the institute as project developer for QazaqGaz Exploration and Production, Kuatamlonmunai, Ken-Sary, Kom-Munai, Taiqonyr Energy, KazAzot, Kazpetrol Group and a Sinopec branch.

As stated by the organisation, it holds a Ministry of Energy licence for works and services in the hydrocarbons sector (class 1) and licences for category I design, engineering surveys and environmental protection works.

Key competencies

  • Reserves and resources: re-estimates for the State Commission on Reserves and PRMS assessments
  • Oil and gas field development projects
  • Well construction design
  • Field facilities design
  • Environmental sections and emission standards for subsoil users' projects
Legal entity
ТОО «Проектный институт «OPTIMUM»
Company type
Service company
Founded
2000
Former names
Независимая экспертно-консалтинговая фирма «OPTIMUM»

Services

  • Reserves estimates and re-estimates, PRMS reserves and resources assessments
  • Exploration projects and their addenda
  • Trial production and field development projects
  • Technical projects for well construction and well reactivation projects
  • Field facilities design
  • Raw gas processing development programmes
  • Environmental documents: reports on possible impacts, environmental protection sections, emission standards
  • Development analysis, author supervision, geological and reservoir simulation modelling (according to the company)
  • Design of gas-chemical plants and BIM models (according to the company)
  • Projects for liquidating the consequences of subsoil use, process-loss norms (according to the company)
  • 2D/3D seismic processing and reinterpretation, basin modelling (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Locations

Regions

Offices, bases and facilities

  • AktauHeadquarters

Projects and clients in Kazakhstan

As reported in public sources
  • QazaqGaz Exploration and Production – re-estimation of gas and condensate reserves of the Airakty field, approved by the State Commission on Reserves (2021)
  • QazaqGaz Exploration and Production – environmental sections for the Maldybai exploration project and for well projects at the Amangeldy and Airakty fields (2024–2025)
  • Maten Petroleum – Matin field development project (2024); report on possible impacts for the Kokarna East development project (2023); PRMS reserves assessment published on KASE (2018)
  • KazAzot – raw gas processing development programme for Shagyrly-Shomyshty for 2024–2026 and facilities working project for gas well No. 271; exploration results and reserves report published on KASE (2018)
  • Pozitiv Invest – Kamenskoe reserves re-estimate approved by the State Commission on Reserves and field development project (2024); technical project for well Wtp102 at Zapadno-Teplovskoe (2026)
  • CNPC-AiDan Munai and Kumkol Trans Service – Sarybulak field development project (2021) and reserves re-estimate approved by the State Commission on Reserves (2023)
  • PetroKazakhstan Kumkol Resources and South-Oil – Bukharsai field development project (2022)
  • CaspiOilGas – addendum to the trial production project for the Upper Jurassic horizon of the Rakushechnoe field, with NIPIneftegaz (2022)
  • Taiqonyr Energy – report on possible impacts for the addendum to the Pridorozhnoe gas field development project (2026)
  • Kuatamlonmunai – environmental sections for group technical projects for wells at the Konys and Bektas fields (2025–2026)
  • Ken-Sary – environmental section for the group technical project for production wells at Arystanovskoe (2026)
  • Sinopec International Energy Investment Holdings Netherlands B.V. (Kazakhstan branch) – environmental section for the group technical project for exploration wells S-1 and S-2 at Sai-Utes (2025)
  • Kazpetrol Group – draft emission standards for the Khairkeldy North and Khairkeldy South fields, with other developers (2026)
  • Técnicas Reunidas and KazAzotPrime – ammonia–urea complex in Mangystau Region, 2023–2024 (according to the company)
  • Kazpetrol Group – reservoir pressure maintenance system for the Khairkeldy South, Khairkeldy North and Taur fields, working project of 2021–2022 (according to the company)

Data sources

Report an error

Similar companies

KMG Engineering

Service companyAstana +2

Research and design institute of the KazMunayGas group, with its head office in Astana and two branches — KazNIPImunaygas in Aktau and the Atyrau branch; the sole participant of the LLP is NC KazMunayGas JSC. The legal entity was created on 12 March 2014 as the KazMunayGas Research Institute of Production and Drilling Technologies LLP — according to the company, on the basis of the Kazakh Institute of Oil and Gas JSC (KING) and its subsidiary institutes — and was renamed KMG Engineering on 4 May 2019; KING itself did not become part of the institute and has been a separate private company since 2015. In May 2018 the subsidiary institutes became branches: KazNIPImunaygas (which traces its history to the KazNIPIneft institute, 1970) prepares project documents for the Mangystau assets — Ozenmunaigas, Mangistaumunaigaz, Karazhanbasmunai and the KazGPZ gas processing plant — and the Atyrau branch (the former NII Caspiymunaygas LLP) for Embamunaigas and assets in Aktobe, Kyzylorda and West Kazakhstan regions; the head office, according to the company, handles management, monitoring of exploration projects, conceptual design and design review. The branches prepare exploration work projects, reserves estimates, field development projects, technical designs for well construction, working designs of field facilities and environmental documentation; according to the company, they also run laboratory centres (core, PVT, oilfield chemistry, drilling fluids). The institute works almost exclusively for KMG group companies and their joint ventures; the private NIPI Kaspiymunaigaz JSC in Atyrau is a separate organisation and not part of the institute.

VerifiedLocal (KZ)Design institutes

NIPIneftegaz

Service companyAktau +5

A privately owned oil and gas research and design institute headquartered in Aktau, set up in 1997 and given its present name in 2025; according to the company, it was founded as NIPIneftegaz CJSC and has offices in Almaty, Astana, Oral (Uralsk), Kyzylorda and Atyrau. In 2007 the institute described itself as created on the basis of the KazNIPIneft institute; it is not that institute's legal successor: according to the history published by KMG Engineering LLP, the legal succession of KazNIPIneft leads to that company. According to the company, the institute prepares reserves estimates, exploration, trial production and field development projects, technical projects for well construction, designs of field facilities and industrial plants and environmental documents, and studies core and reservoir fluids in its own laboratory centre. State portals confirm that in 2022–2026 it was named as developer of the development projects for the Karaturun Morskoe, Munaibay, Karamandybas North and Tuzkol fields and of facilities projects at the Dunga field, and a subsoil user's filing names it as the author of the Karabulak North reserves estimate approved by the State Commission on Reserves in 2022; work for Tengizchevroil, KPO and NCOC is listed only on the institute's own site. As stated by the organisation, it holds state licences for the design of mining production in the oil and gas sector (class 1), environmental design and standard-setting, category I design and engineering surveys; its testing laboratory is accredited until 6 October 2030 (register of the National Accreditation Centre), and its average headcount in 2025 was 311 (annual statements filed with the state depository).

VerifiedLocal (KZ)Design institutes

KazTransOil Research and Development Centre (CIR)

Service companyAstana +2

In-house research and design centre of KazTransOil JSC — a branch of the company, not a separate legal entity; it is based in Astana, with design-estimate bureaus also in Aktau and Pavlodar. According to the company, it was created on 3 September 2000 as the Science and Technology Centre branch and renamed the Research and Development Centre in May 2020; since 25 December 2023 it has been located at M. Gabdullin Street 2 in Astana. It prepares design-estimate documentation for the investment programme and overhaul of KazTransOil's own facilities — trunk oil pipelines, oil pumping stations, tanks and tank farms — together with the environmental sections and emission-limit projects for them. According to the company, the centre runs laboratories for oil and petroleum products, physical and chemical methods, and corrosion; at the end of 2025 the branch had 127 employees (KazTransOil annual report). It designs only for KazTransOil itself: no work for outside clients was found in public sources, and all licences are held by KazTransOil JSC.

VerifiedLocal (KZ)Design institutes