Scientific and Production Centre (NPC), Aktau

Service companyAktaunpc.com.kz

What they do

A privately owned design organisation in Aktau working on subsurface project documents. According to the company (its website has not been updated since July 2013), it was formed in December 2000 on the basis of the geology and oil and gas field development department of the Engineering Centre of Mangistaumunaigaz JSC and in 2001–2009 prepared project and research documents for all 15 fields of that company.

According to the company, it prepares reserves estimates and re-estimates, prospecting and exploration projects, trial production and field development projects with geological and reservoir simulation models, technical projects for well construction, conservation and liquidation projects and environmental documents.

State portals confirm work for subsoil users in Mangystau and Atyrau regions: the centre is named as the author of the addenda to the development projects for the West Sagiz and Asanketken fields and of the Asanketken reserves re-estimate for Jasyl Energy (2024–2025), of group technical projects for well construction at the Karaturun fields for Buzachi Neft (2025–2026), and of the reserves estimate and trial production project for the Shalva field (2011–2016).

As stated by the organisation, it holds licences for the design of mining production and for environmental protection works.

Key competencies

  • Field development projects and their addenda
  • Reserves estimation and re-estimation
  • Group technical projects for well construction
  • Environmental sections for subsoil-use projects
Legal entity
ТОО «Научно-производственный центр» (ТОО «НПЦ»)
Company type
Service company
Founded
2000

Services

  • Estimates and re-estimates of oil, gas and associated component reserves
  • Trial production projects, field development projects and their addenda
  • Group and individual technical projects for well construction
  • Projects for liquidating the consequences of subsoil use
  • Environmental documents: reports on possible impacts, environmental protection sections, emission standards, industrial environmental monitoring programmes
  • Prospecting and exploration projects, mining and geological allotment projects (according to the company)
  • Geological and reservoir simulation models, development analysis and author supervision (according to the company)
  • Process-loss norms, associated gas processing development programmes, produced water disposal projects (according to the company)
  • Industrial safety expertise (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Locations

Regions

Offices, bases and facilities

  • AktauHeadquarters

Projects and clients in Kazakhstan

As reported in public sources
  • Jasyl Energy – addendum to the West Sagiz field development project (2025)
  • Jasyl Energy – Asanketken reserves re-estimate (2024); addendum to the Asanketken field development project with report on possible impacts (2025)
  • Buzachi Neft – group technical project for wells KM-11 to KM-16 at the Karaturun Morskoe block (2025)
  • Buzachi Neft – group technical project for wells KZ-7 to KZ-12 at the Karaturun West field (2025)
  • Buzachi Neft – group technical project for 33 production wells at Karaturun North-East (2025) and addendum to it (2026)
  • Buzachi Neft – addendum to the group technical project for 16 production wells at Karaturun East (2026)
  • ARK Petroleum – liquidation project for the Shalva field (2026); technical project for production well SH-P13 at Shalva (2025)
  • Munai-Service and ARK Petroleum – Shalva field: operational reserves estimate (2011), trial production project (2012) and addendum to it (2016)
  • SK Petroleum – Karamandybas North package: addendum to the well project, facilities working project correction and draft emission standards, with Ecoline Company (2025)
  • CaspianMunaiGas – report on possible impacts for the exploration project on the KDL Company contract territory (2023)
  • Mangistaumunaigaz – project and research documents for all 15 fields of the company, 2001–2009 (according to the company)
  • KazMunayGas Exploration Production – work on the Iskine, Bek-Beke and Sagiz fields, undated (according to the company)

Data sources

Report an error

Profile compiled from public sources and checked on October 2, 2026. Something out of date? Let us know.

Similar companies

KMG Engineering

Service companyAstana +2

Research and design institute of the KazMunayGas group, with its head office in Astana and two branches — KazNIPImunaygas in Aktau and the Atyrau branch; the sole participant of the LLP is NC KazMunayGas JSC. The legal entity was created on 12 March 2014 as the KazMunayGas Research Institute of Production and Drilling Technologies LLP — according to the company, on the basis of the Kazakh Institute of Oil and Gas JSC (KING) and its subsidiary institutes — and was renamed KMG Engineering on 4 May 2019; KING itself did not become part of the institute and has been a separate private company since 2015. In May 2018 the subsidiary institutes became branches: KazNIPImunaygas (which traces its history to the KazNIPIneft institute, 1970) prepares project documents for the Mangystau assets — Ozenmunaigas, Mangistaumunaigaz, Karazhanbasmunai and the KazGPZ gas processing plant — and the Atyrau branch (the former NII Caspiymunaygas LLP) for Embamunaigas and assets in Aktobe, Kyzylorda and West Kazakhstan regions; the head office, according to the company, handles management, monitoring of exploration projects, conceptual design and design review. The branches prepare exploration work projects, reserves estimates, field development projects, technical designs for well construction, working designs of field facilities and environmental documentation; according to the company, they also run laboratory centres (core, PVT, oilfield chemistry, drilling fluids). The institute works almost exclusively for KMG group companies and their joint ventures; the private NIPI Kaspiymunaigaz JSC in Atyrau is a separate organisation and not part of the institute.

VerifiedLocal (KZ)Design institutes

NIPIneftegaz

Service companyAktau +5

A privately owned oil and gas research and design institute headquartered in Aktau, set up in 1997 and given its present name in 2025; according to the company, it was founded as NIPIneftegaz CJSC and has offices in Almaty, Astana, Oral (Uralsk), Kyzylorda and Atyrau. In 2007 the institute described itself as created on the basis of the KazNIPIneft institute; it is not that institute's legal successor: according to the history published by KMG Engineering LLP, the legal succession of KazNIPIneft leads to that company. According to the company, the institute prepares reserves estimates, exploration, trial production and field development projects, technical projects for well construction, designs of field facilities and industrial plants and environmental documents, and studies core and reservoir fluids in its own laboratory centre. State portals confirm that in 2022–2026 it was named as developer of the development projects for the Karaturun Morskoe, Munaibay, Karamandybas North and Tuzkol fields and of facilities projects at the Dunga field, and a subsoil user's filing names it as the author of the Karabulak North reserves estimate approved by the State Commission on Reserves in 2022; work for Tengizchevroil, KPO and NCOC is listed only on the institute's own site. As stated by the organisation, it holds state licences for the design of mining production in the oil and gas sector (class 1), environmental design and standard-setting, category I design and engineering surveys; its testing laboratory is accredited until 6 October 2030 (register of the National Accreditation Centre), and its average headcount in 2025 was 311 (annual statements filed with the state depository).

VerifiedLocal (KZ)Design institutes

OPTIMUM Design Institute

Service companyAktau

A privately owned design institute in Aktau, founded in 2000, according to the company, as an independent expert and consulting firm in geology and subsoil use and renamed OPTIMUM Design Institute LLP in 2009. According to the company, the institute prepares reserves estimates and re-estimates (including PRMS assessments), exploration, trial production and field development projects, technical projects for well construction, field facilities designs and environmental documents, and also designs gas-chemical plants. State documents confirm reserves re-estimates approved by the State Commission on Reserves for the Airakty (2021), Sarybulak (2023) and Kamenskoe (2024) fields, development projects for the Matin, Kamenskoe, Sarybulak and Bukharsai fields, and two reserves and resources reports published on KASE in 2018 by the issuers KazAzot and Maten Petroleum. Public-hearing notices of 2022–2026 name the institute as project developer for QazaqGaz Exploration and Production, Kuatamlonmunai, Ken-Sary, Kom-Munai, Taiqonyr Energy, KazAzot, Kazpetrol Group and a Sinopec branch. As stated by the organisation, it holds a Ministry of Energy licence for works and services in the hydrocarbons sector (class 1) and licences for category I design, engineering surveys and environmental protection works.

VerifiedLocal (KZ)Design institutes