Skip to content
Brent$117.6Gas TTF$1,192USD453.87 ₸
MunaiHub

K Caspian Engineering

Service companyAtyraukcaspian.kz

What they do

A private engineering and design company based in Atyrau (K Caspian Engineering LLP, abbreviated KCE), founded in 2007 according to the company; by its own description, it offers engineering and design solutions for the oil and gas, energy and infrastructure sectors in West Kazakhstan.

It carries out working (detailed) design for the operating Tengiz facilities under a contract with Tengizchevroil LLP: preparation and facilities of well sites, expansion of group metering units, flowlines and water lines, and upgrade of the equipment of the wastewater injection system.

All of its projects confirmed by documents on the state public-hearings portal (2024–2025) were done for Tengizchevroil under a single contract; the company's site also shows Caspian Offshore Construction and ISKER Group among its clients.

The design covers the process, piping, civil, electrical and instrumentation disciplines; pre-design and concept studies, FEED and project management are offered on the company's site without project examples.

Key competencies

  • Working design for the operating Tengiz facilities
  • Multi-discipline design: process, piping, civil, electrical, instrumentation
  • Well sites and group metering units
  • Small and medium project engineering
  • West Kazakhstan oil and gas focus
  • Category I design licence (as stated by the organisation in its design documents)
Legal entity
ТОО «K Caspian Engineering» («К Каспиан Инжиниринг»)
Company type
Service company
Founded
2007

Services

  • Working (detailed) design for operating production facilities
  • Preparation and facilities of well sites and cluster pads
  • Expansion of group metering units, flowlines and water lines
  • Upgrades of wastewater injection system equipment, pump-house buildings
  • Process, piping and mechanical design (according to the company)
  • Civil, electrical, instrumentation and automation design (according to the company)
  • Pre-design and concept studies, basis of design, FEED (according to the company)
  • Hydraulic and process simulation, flare-network analysis (according to the company)
  • Project and risk management (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Locations

Regions

Offices, bases and facilities

  • AtyrauHeadquarters

Projects and clients in Kazakhstan

As reported in public sources
  • Tengizchevroil – working design for modernisation of the above-ground equipment of the wastewater injection system, pump-house building (TCO project CP-23-3094): design contractor (2024–2025)
  • Tengizchevroil – preparation and completion of the BATCH-2 well group site, stages 1 and 2 (CP-24-3037), and of the T-0108 well site for workover: design contractor (2024–2025)
  • Tengizchevroil – construction of residual-materials management pads at cluster pads PKS 45-1 and PKS 100 (CP-24-3041, CP-24-3042): design contractor (2024)
  • Tengizchevroil – facilities of wells T-6646, T-6545, T-6547 and T-6551 at cluster pad PKS 14-2 and expansion of group metering unit GZU-55 (CP-23-3002, CP-23-3003): design contractor (2024)
  • Tengizchevroil – well-site preparation for coiled tubing unit operation; preparation and completion of the T-0108 well site, stages 1 and 2 (2024)
  • Tengizchevroil – site preparation for T-15NT and T-16NT and a water line (CP-24-3050, CP-24-3051): design contractor (2024–2025)
  • Tengizchevroil – listed among the developers of documentation in environmental-permit hearing notices (2022–2024)

Data sources

Report an error

Similar companies

KMG Engineering

Service companyAstana +2

Research and design institute of the KazMunayGas group, with its head office in Astana and two branches — KazNIPImunaygas in Aktau and the Atyrau branch; the sole participant of the LLP is NC KazMunayGas JSC. The legal entity was created on 12 March 2014 as the KazMunayGas Research Institute of Production and Drilling Technologies LLP — according to the company, on the basis of the Kazakh Institute of Oil and Gas JSC (KING) and its subsidiary institutes — and was renamed KMG Engineering on 4 May 2019; KING itself did not become part of the institute and has been a separate private company since 2015. In May 2018 the subsidiary institutes became branches: KazNIPImunaygas (which traces its history to the KazNIPIneft institute, 1970) prepares project documents for the Mangystau assets — Ozenmunaigas, Mangistaumunaigaz, Karazhanbasmunai and the KazGPZ gas processing plant — and the Atyrau branch (the former NII Caspiymunaygas LLP) for Embamunaigas and assets in Aktobe, Kyzylorda and West Kazakhstan regions; the head office, according to the company, handles management, monitoring of exploration projects, conceptual design and design review. The branches prepare exploration work projects, reserves estimates, field development projects, technical designs for well construction, working designs of field facilities and environmental documentation; according to the company, they also run laboratory centres (core, PVT, oilfield chemistry, drilling fluids). The institute works almost exclusively for KMG group companies and their joint ventures; the private NIPI Kaspiymunaigaz JSC in Atyrau is a separate organisation and not part of the institute.

VerifiedLocal (KZ)Design institutes

ILF Kazakhstan

EPC / EngineeringAlmaty +1

Kazakhstan company of the international engineering group ILF Consulting Engineers (Austria and Germany) — ILF Kazakhstan LLC, with offices in Almaty (head office) and Atyrau. According to the company, ILF in Kazakhstan was established in 1994; the group's timeline lists a new Almaty office under 2004–2005 and the Atyrau office under 2019. According to the company, it provides design engineering, technical audits and project management consultancy (PMC) and holds a category I state design licence. The company reports that it is carrying out the FEED and detailed design for the next phase of the Beineu–Bozoy–Shymkent gas pipeline (1,600 km of pipeline and six compressor stations; 2025) and that in 2021 a joint venture it belongs to won a five-year NCOC framework contract for conceptual studies, pre-FEED and FEED. The Samruk-Kazyna procurement portal confirms consultancy contracts: project management for the Kenderli seawater desalination plant for Ak Su KMG (2022) and a technical audit for Intergas Central Asia (2021–2022).

VerifiedInternationalDesign institutes

Witteveen+Bos Caspian

EPC / EngineeringAlmaty +2

Kazakhstan company of the Dutch consulting and engineering firm Witteveen+Bos — Witteveen+Bos Caspian LLP, with offices in Almaty, Atyrau and Aktau; according to the company, its first office in Kazakhstan opened in Aktau in 2001, followed by Atyrau in 2003 and Almaty in 2007. By its own description, it designs civil and marine infrastructure for oil and gas projects rather than process plant: artificial islands and ice-protection structures, marine access channels, ports and cargo offloading facilities, access roads, industrial wastewater treatment. According to the company, its experts have worked in Kazakhstan since 1997 and have designed Kashagan's islands since 1998; for Tengizchevroil it carried out, from 2012, the feasibility study, environmental impact assessment, surveys, FEED and detailed design of the Cargo Transportation Route (CaTRo), and for NCOC the design of the Kashagan marine access channels from pre-FEED to detailed design (the first phase of the channels was then planned to be operational at the end of 2021). NCOC's mandate for the front-end engineering of the channels was also reported by Energy Intelligence in April 2021. Outside oil and gas the company works on water management, urban mobility and remediation.

VerifiedInternationalDesign institutes