Skip to content
Brent$117.6Gas TTF$1,192USD453.87 ₸
MunaiHub

KPSP (Karaganda Promstroyproekt Institute)

Service companyAstana+3kpsp.kz
VerifiedKazakhstan companyDesign institutesEPC / Engineering

What they do

Private multi-sector design institute, part of the private KPSP group: its legal address is in Karaganda, while its head office, according to the company, is in Astana, with production offices in Karaganda, Atyrau and Aksai. According to the company, the institute has worked since 1959 and has 200 engineers (the present legal entity, judging by its business identification number, was registered in 2005); oil, gas and petrochemicals became one of its main lines in the 2020s, alongside mining and metallurgy, power and infrastructure.

It carries out the design ("Project") stage and author supervision and, according to the company, also pre-design work, working documentation in all disciplines, adaptation of foreign designs to Kazakhstan's norms and support through expertise.

The State bank of construction projects shows it as general designer of the adjustment of the "Project" stage for the gas separation unit at Tengiz for KMG PetroChem LLP (2025), and the Samruk-Kazyna procurement portal as provider of author supervision for the same client until the end of 2028; the project's non-technical summary names it as designer of the Silleno LLP polyethylene plant, while the hearing notice for the same facility names another design organisation as project developer.

According to Technip Energies, in 2019 the institute set up the TKJV joint venture with it, which signed a frame agreement with NCOC (announced in July 2021) and a five-year engineering services agreement with Karachaganak Petroleum Operating (June 2024).

Key competencies

  • Gas processing and petrochemicals: the "Project" stage and author supervision
  • TKJV joint venture with Technip Energies for Karachaganak and Kashagan facilities (according to Technip Energies)
  • Multi-sector design: mining and metallurgy, power, infrastructure
  • Category I design licence No. 12013928 of 24 July 2012 — as stated by the organisation
Legal entity
ТОО «Институт Карагандинский Промстройпроект»
Company type
Service company
Founded
1959

Services

  • Design documentation (the "Project" stage) for gas processing and petrochemical facilities
  • Author supervision
  • Design of mining and metallurgical facilities: concentrators
  • Working designs of boiler houses, gas supply networks and heat networks
  • Pre-design work: techno-economic calculations and feasibility studies, main technical solutions, site selection (according to the company)
  • Design-estimate documentation in all disciplines: general plan, architecture, structures, process, automation, utilities (according to the company)
  • Adaptation of foreign (licensed) designs to the norms of the Republic of Kazakhstan (according to the company)
  • BIM design (according to the company)
  • Support through expertise and approvals, services during construction (according to the company)
  • Engineering surveys and survey of buildings and structures (according to the company)
  • Design of power facilities: CHP plants, gas-turbine and combined-cycle units (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Upstream (E&P)Gas processingPetrochemicalsMiningPower & utilities

Categories

Locations

Regions

Offices, bases and facilities

  • AstanaHeadquarters
  • KaragandaOffice
  • AtyrauOffice
  • AksaiOffice

Projects and clients in Kazakhstan

As reported in public sources
  • KMG PetroChem – gas separation unit at Tengiz (9.1 billion m³/year), second phase of the integrated gas-chemical complex in Atyrau Region: general designer of the adjustment of the "Project" stage, positive state expertise conclusion of 05.05.2025
  • KMG PetroChem – author supervision services (single-source contract of 20.11.2025, valid to 31.12.2028; the public contract card does not name the facility)
  • Silleno – polyethylene plant (1,250 thousand t/year), second phase of the integrated gas-chemical complex in Atyrau Region: named designer in the project's non-technical summary (2025); a hearing notice of 12.03.2025 names another design organisation as project developer
  • Kazakhstan Petrochemical Industries Inc. – author supervision of construction of off-site roads and landscaping of the integrated gas-chemical complex (contract of 13.04.2022, completed)
  • Karachaganak Petroleum Operating – five-year long-term engineering services agreement signed on 18.06.2024 by Technip Energies through the TKJV joint venture with KPSP (reported by Oil & Gas Journal)
  • NCOC – five-year frame agreement for the Aktote, Kairan and Kashagan fields through the TKJV joint venture (according to Technip Energies and the company)
  • ShalkiyaZinc – adjustment of the "Project" stage for the 4 million t/year concentrator at the Shalkiya deposit (state expertise conclusion of 09.06.2023) and working design of modular gas boiler houses, gas supply and heat networks (27.08.2022); not oil and gas
  • Lubricants plant (100 thousand t/year) in Almaty for Lukoil – engineering surveys, "Project" and working documentation stages, author supervision (according to the company; Forbes Kazakhstan lists the plant among the institute's 2015 orders)
  • According to the company: FEED and detailed design of gas plant Unit 4 at the Karachaganak field for Hyundai Engineering; feasibility study of an LNG plant in Taraz; a gas-turbine power plant at the Tengiz field

Data sources

Report an error

Similar companies

KMG Engineering

Service companyAstana +2

Research and design institute of the KazMunayGas group, with its head office in Astana and two branches — KazNIPImunaygas in Aktau and the Atyrau branch; the sole participant of the LLP is NC KazMunayGas JSC. The legal entity was created on 12 March 2014 as the KazMunayGas Research Institute of Production and Drilling Technologies LLP — according to the company, on the basis of the Kazakh Institute of Oil and Gas JSC (KING) and its subsidiary institutes — and was renamed KMG Engineering on 4 May 2019; KING itself did not become part of the institute and has been a separate private company since 2015. In May 2018 the subsidiary institutes became branches: KazNIPImunaygas (which traces its history to the KazNIPIneft institute, 1970) prepares project documents for the Mangystau assets — Ozenmunaigas, Mangistaumunaigaz, Karazhanbasmunai and the KazGPZ gas processing plant — and the Atyrau branch (the former NII Caspiymunaygas LLP) for Embamunaigas and assets in Aktobe, Kyzylorda and West Kazakhstan regions; the head office, according to the company, handles management, monitoring of exploration projects, conceptual design and design review. The branches prepare exploration work projects, reserves estimates, field development projects, technical designs for well construction, working designs of field facilities and environmental documentation; according to the company, they also run laboratory centres (core, PVT, oilfield chemistry, drilling fluids). The institute works almost exclusively for KMG group companies and their joint ventures; the private NIPI Kaspiymunaigaz JSC in Atyrau is a separate organisation and not part of the institute.

VerifiedLocal (KZ)Design institutes

NIPIneftegaz

Service companyAktau +5

A privately owned oil and gas research and design institute headquartered in Aktau, set up in 1997 and given its present name in 2025; according to the company, it was founded as NIPIneftegaz CJSC and has offices in Almaty, Astana, Oral (Uralsk), Kyzylorda and Atyrau. In 2007 the institute described itself as created on the basis of the KazNIPIneft institute; it is not that institute's legal successor: according to the history published by KMG Engineering LLP, the legal succession of KazNIPIneft leads to that company. According to the company, the institute prepares reserves estimates, exploration, trial production and field development projects, technical projects for well construction, designs of field facilities and industrial plants and environmental documents, and studies core and reservoir fluids in its own laboratory centre. State portals confirm that in 2022–2026 it was named as developer of the development projects for the Karaturun Morskoe, Munaibay, Karamandybas North and Tuzkol fields and of facilities projects at the Dunga field, and a subsoil user's filing names it as the author of the Karabulak North reserves estimate approved by the State Commission on Reserves in 2022; work for Tengizchevroil, KPO and NCOC is listed only on the institute's own site. As stated by the organisation, it holds state licences for the design of mining production in the oil and gas sector (class 1), environmental design and standard-setting, category I design and engineering surveys; its testing laboratory is accredited until 6 October 2030 (register of the National Accreditation Centre), and its average headcount in 2025 was 311 (annual statements filed with the state depository).

VerifiedLocal (KZ)Design institutes

Caspian Engineering & Research (CER)

Service companyAktau +2

A private design organisation based in Aktau (Caspian Engineering & Research LLP, abbreviated CER), registered in 2003 according to the company. It designs facilities for oil, gas and gas-condensate fields — oil and gas treatment units, gathering systems, reservoir-pressure maintenance and gas re-injection — and storage and transshipment facilities for liquefied gases and petroleum products; according to the company, also trunk pipelines and pump stations. Environmental design is a separate line of work: environmental impact assessments, reports on possible impacts, environmental protection sections and emission limits. Documents on the state public-hearings portal for 2022–2025 show the company as the design organisation of the Eskene LPG LLP liquefied petroleum gas separation plant in Atyrau Region, of the NDF KAZAKHSTAN LLP tank farm in West Kazakhstan Region and of a working design for Tepke LLP, and as one of the developers of projects for Tasbulat Oil Corporation LLP and Kom-Munai LLP and of environmental documentation for Karachaganak Petroleum Operating. According to the company, its portfolio also includes work for the Tengiz, Kashagan and Karachaganak projects and for the CPC expansion in 2004–2025.

VerifiedLocal (KZ)Design institutes