KITNG

Service companyAlmatykitng.kz

What they do

Private design institute in Almaty working mainly on gas supply and pipeline transport facilities; according to the company, it has a branch in Atyrau and more than 140 employees. According to the company, it traces its history to the KazGiproGaz state design institute (1973), privatised in 1998 and renamed the Kazakh Institute of Oil and Gas Transportation in 2006; the present legal entity, judging by its business identification number, was registered in 2002, and in early 2022 its name was shortened to KITNG LLP.

The State bank of construction projects shows it in 2022–2025 as general designer of automatic gas distribution stations, gas pipelines, the external gas supply of a power plant and gas distribution networks of settlements, as well as of a feasibility study for the Pavlodar Petrochemical Plant; it also prepares environmental documentation for a trunk gas pipeline operator.

The base designs of trunk pipelines that the institute cites (the Kazakhstan–China gas and oil pipelines) date from the 2000s and are given according to the company. A notable share of its recent work is outside oil and gas: dredging at the port of Aktau, facilities of a uranium mine, and gasification of villages for regional and district clients.

Key competencies

  • Gas distribution stations and gas pipelines
  • Feasibility studies for the Pavlodar Petrochemical Plant
  • Environmental documentation for a trunk gas pipeline operator
  • Transition to BIM design since 2015 (according to the company)
  • Licences for category I design activity and survey activity (GSL No. 000337) and for works and services in the hydrocarbons sphere (No. 22006387) — as stated by the organisation
Legal entity
ТОО «КИТНГ»
Company type
Service company
Founded
1973
Former names
ТОО «Казахский институт транспорта нефти и газа» (до 2022)

Services

  • Design of automatic gas distribution stations (AGRS)
  • Design of gas pipelines, feeder gas pipelines and gas distribution networks
  • External gas supply of power plants
  • Feasibility studies for refining facilities
  • Environmental design documentation: emission limits, environmental control and waste management programmes
  • Author supervision
  • Design of port facilities and facilities of mining companies
  • Base designs and working documentation for trunk oil and gas pipelines (according to the company)
  • Design of tank farms and terminals (according to the company)
  • Engineering surveys: geodesy, geology, laboratory soil testing (according to the company)
  • Industrial safety declarations, technical supervision, survey of buildings and structures (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Midstream (pipelines & storage)Downstream (refining)Power & utilitiesMining

Categories

Locations

Regions

Offices, bases and facilities

  • AlmatyHeadquarters

Projects and clients in Kazakhstan

As reported in public sources
  • Pavlodar Petrochemical Plant – feasibility study for a new system for loading light petroleum products into rail tank cars: general designer, state expertise conclusion of 13.05.2025 (contract of 25.12.2023, open tender)
  • Pavlodar Petrochemical Plant – adjustment of the feasibility study for reconstruction of the diesel hydrotreating unit with an integrated dewaxing block (contract of 26.12.2023, completed in 2024)
  • PGU Turkestan – external gas supply (27.2 km gas pipeline) of the 1,000 MW combined-cycle power plant in Turkistan Region: general designer, state expertise conclusion of 27.05.2024; author supervision (contract of 25.07.2024)
  • ShalkiyaZinc – expansion of the Zhanakorgan automatic gas distribution station from 20,000 to 40,000 Nm³/h, Kyzylorda Region: general designer, state expertise conclusion of 16.02.2023
  • Almaty Region Energy and Water Supply Department – automatic gas distribution station (50,000 m³/h) for the Kazybek Bek industrial zone: general designer, state expertise conclusion of 14.07.2025
  • Regional energy departments and district construction departments in Akmola, Almaty, Jetisu and Mangystau regions – working designs of feeder gas pipelines and gas distribution networks of settlements: general designer, 13 state expertise conclusions in 2022–2025
  • Beineu–Shymkent Gas Pipeline – emission limits, environmental control and waste management programmes for the environmental permit for a section of the trunk gas pipeline in Mangystau Region (hearing on 23.11.2023)
  • Aktau International Sea Commercial Port – feasibility studies and design documentation (2023–2024), working design for dredging of the port water area (state expertise conclusion of 27.12.2024) and author supervision (contract of 30.04.2026, valid to 30.06.2027)
  • KATCO – secondary lines and acid pipelines at a uranium mine: the design passed expertise in 2021 (as stated in a hearing notice of 18.08.2025)
  • According to the company: base design and working documentation of the Kazakhstan–China gas pipeline for Asian Gas Pipeline and KazStroyService (2007–2009) and base design of the Kenkiyak–Kumkol section of the Kazakhstan–China oil pipeline for Kazakhstan-China Pipeline

Data sources

Report an error

Profile compiled from public sources and checked on October 2, 2026. Something out of date? Let us know.

Similar companies

Kazgiproneftetrans (KGNT)

EPC / EngineeringAlmaty

Private engineering company in Almaty — a multi-sector design institute; it has been part of the private group of the Kazakh Institute of Oil and Gas JSC (KING) since 2017 and, according to KING's audited consolidated statements, is wholly owned by it. According to the company, it traces its history to 1974, to a special design bureau under Kazglavneftesnab, and from 1986 was the KazGiproNefteTrans state design institute; the present LLP was registered on 7 September 2004. It designs refining, petrochemical and chemical facilities and heat and power facilities and prepares environmental design documentation; according to the company, it also designs trunk oil and gas pipelines, field facilities, terminals and tank farms. State registers show it as general designer of the hydrogen production unit at the Pavlodar Petrochemical Plant site (2025) and as compiler of the environmental documentation for the second line of the Beineu–Bozoi–Shymkent gas pipeline (2026); together with Fluor, WorleyParsons and KING it founded the KPJV joint venture, the general contractor of the Tengiz Future Growth Project. According to the company, it has 500 employees.

VerifiedLocal (KZ)Design institutes

Kazakh Institute of Oil and Gas (KING)

Service companyAlmaty +1

Private design company in Almaty and the parent of an engineering group that includes NIPI Kaspiymunaigaz JSC (Atyrau), Kazgiproneftetrans Engineering Company LLP and the KazNIPIEnergoprom Institute JSC (both in Almaty). It was created by a Government resolution of 23 December 2002 as a state-owned closed joint-stock company formed from the state shareholdings in two institutes, and until 2015 was a subsidiary of KazMunayGas; two of its institutes — KazNIPImunaygas (Aktau) and NII Caspiymunaygas LLP (Atyrau) — moved to the KMG institute created in 2014 (now KMG Engineering LLP), and in 2015 100% of KING's shares were sold at an electronic auction, since when the company has been private. KING itself acts as general designer of refining, petrochemical and gas-chemical facilities and trunk pipelines, provides author supervision, prepares environmental documentation and carries out geological studies for subsoil users. Its clients in state registers for 2021–2026 include KMG PetroChem, MunaiTas, the Atyrau Refinery, the Pavlodar Petrochemical Plant, Kazakhstan Petrochemical Industries and QazaqGaz NTC; together with Fluor, WorleyParsons and Kazgiproneftetrans it founded the KPJV joint venture for the Tengiz Future Growth Project, which was completed in 2025. Most of the group's staff work in the subsidiary institutes: according to filings in the state depository of financial statements, in 2025 KING itself had 64 employees on average and the group 1,070.

VerifiedLocal (KZ)Design institutes

NIPIneftegaz

Service companyAktau +5

A privately owned oil and gas research and design institute headquartered in Aktau, set up in 1997 and given its present name in 2025; according to the company, it was founded as NIPIneftegaz CJSC and has offices in Almaty, Astana, Oral (Uralsk), Kyzylorda and Atyrau. In 2007 the institute described itself as created on the basis of the KazNIPIneft institute; it is not that institute's legal successor: according to the history published by KMG Engineering LLP, the legal succession of KazNIPIneft leads to that company. According to the company, the institute prepares reserves estimates, exploration, trial production and field development projects, technical projects for well construction, designs of field facilities and industrial plants and environmental documents, and studies core and reservoir fluids in its own laboratory centre. State portals confirm that in 2022–2026 it was named as developer of the development projects for the Karaturun Morskoe, Munaibay, Karamandybas North and Tuzkol fields and of facilities projects at the Dunga field, and a subsoil user's filing names it as the author of the Karabulak North reserves estimate approved by the State Commission on Reserves in 2022; work for Tengizchevroil, KPO and NCOC is listed only on the institute's own site. As stated by the organisation, it holds state licences for the design of mining production in the oil and gas sector (class 1), environmental design and standard-setting, category I design and engineering surveys; its testing laboratory is accredited until 6 October 2030 (register of the National Accreditation Centre), and its average headcount in 2025 was 311 (annual statements filed with the state depository).

VerifiedLocal (KZ)Design institutes