Skip to content
Brent$117.6Gas TTF$1,192USD453.87 ₸
MunaiHub

SMART Engineering

Service companyAlmaty+1smartengineering.kz

What they do

A privately owned design company in Almaty; according to the company, it was created in 2006 and has an office in Atyrau.

It prepares exploration and appraisal projects, field development projects and their addenda, technical projects for well construction and projects for liquidating the consequences of subsoil use, with its own environmental sections; according to the company, it also produces reserves estimates for the State Commission on Reserves, trial production projects, development analyses, author supervision reports and raw gas processing programmes.

Public-hearing notices of 2022–2026 name the company as developer of the development projects for the Zhamansu, Alimbay, Karataykyz and Mynteke South fields, of an addendum to the Kemerkol field development project and of exploration projects for the Zharkent, Maksat, Elek, Kargaly, Tastobe, Tepke and Karaturun East areas; the state procurement register shows two executed contracts with the West Kazakhstan Interregional Department of Geology (2020 and 2021). According to the company, it has completed 498 projects for 98 clients, 276 of them defended at the Central Commission for Exploration and Development, and 47 of its reserves reports have been approved by the State Commission on Reserves.

As stated by the organisation, it holds state licences for the design of mining production in the oil and gas industry, for environmental protection works (class 1) and for design and survey activity.

Key competencies

  • Exploration and appraisal projects
  • Field development projects
  • Well construction design
  • Projects for liquidating the consequences of subsoil use
  • Reserves estimates for the State Commission on Reserves (according to the company)
Legal entity
ТОО «СМАРТ Инжиниринг»
Company type
Service company
Founded
2006

Services

  • Exploration (prospecting) projects and their addenda
  • Appraisal projects
  • Field development projects and their addenda
  • Individual and group technical projects for well construction
  • Projects for liquidating the consequences of subsoil use
  • Environmental sections for projects: reports on possible impacts, environmental protection sections, emission standards
  • Design and estimate documentation for seismic surveys
  • Oil and gas reserves estimates with recovery-factor feasibility studies (according to the company)
  • Trial production projects (according to the company)
  • Development analysis and author supervision (according to the company)
  • Raw gas processing development programmes (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Locations

Regions

Offices, bases and facilities

  • AlmatyHeadquarters
  • AtyrauOffice

Projects and clients in Kazakhstan

As reported in public sources
  • Almaty Oil Ventures – exploration project for the Zharkent block, Zhetysu and Almaty regions (2025)
  • Almex Plus – exploration (appraisal) project for the Maksat structure (2026)
  • KazNefteGazProekt – exploration projects for the Elek and Kargaly blocks with environmental reports (2025)
  • Petrocraft – group technical project for drilling wells R-15, R-16 and R-17 at the Kaskyrbulak South field, with environmental section (2025)
  • Turan-Barlau – liquidation projects for the Kumdala and Maikyz fields; group well project and well facilities working project at Kumdala, with BM Production (2025)
  • BRP Oil – Zhamansu field development project (2024)
  • Nomad West Oil – exploration project for the Tastobe area, Mangystau Region (2024)
  • Altius Petroleum International – Alimbay field development project (2023) and Karataykyz field development project (2022)
  • AP-Nafta Operating – addendum to the Kemerkol field development project (2023)
  • Prikaspian Petroleum Company – Mynteke South field development project (2022)
  • Tepke – appraisal-stage exploration projects for the Tepke and Tepke West structures and technical projects for appraisal wells (2022–2023)
  • West Kazakhstan Interregional Department of Geology – design and estimate documentation for 2D seismic on Block No. 4, North Turgay basin (2021)
  • Mangistau Neftedobycha – reserves estimates for the Sarsenbai and Uilyuk fields, contracts of 2023 (according to the company)
  • Maersk Oil Kazakhstan – operational reserves estimate and trial production project for the Valanginian horizon of the Dunga field, 2008 (according to the company)

Data sources

Report an error

Profile compiled from public sources and checked on October 2, 2026. Something out of date? Let us know.

Similar companies

NIPIneftegaz

Service companyAktau +5

A privately owned oil and gas research and design institute headquartered in Aktau, set up in 1997 and given its present name in 2025; according to the company, it was founded as NIPIneftegaz CJSC and has offices in Almaty, Astana, Oral (Uralsk), Kyzylorda and Atyrau. In 2007 the institute described itself as created on the basis of the KazNIPIneft institute; it is not that institute's legal successor: according to the history published by KMG Engineering LLP, the legal succession of KazNIPIneft leads to that company. According to the company, the institute prepares reserves estimates, exploration, trial production and field development projects, technical projects for well construction, designs of field facilities and industrial plants and environmental documents, and studies core and reservoir fluids in its own laboratory centre. State portals confirm that in 2022–2026 it was named as developer of the development projects for the Karaturun Morskoe, Munaibay, Karamandybas North and Tuzkol fields and of facilities projects at the Dunga field, and a subsoil user's filing names it as the author of the Karabulak North reserves estimate approved by the State Commission on Reserves in 2022; work for Tengizchevroil, KPO and NCOC is listed only on the institute's own site. As stated by the organisation, it holds state licences for the design of mining production in the oil and gas sector (class 1), environmental design and standard-setting, category I design and engineering surveys; its testing laboratory is accredited until 6 October 2030 (register of the National Accreditation Centre), and its average headcount in 2025 was 311 (annual statements filed with the state depository).

VerifiedLocal (KZ)Design institutes

Timal Consulting Group

Service companyAtyrau +1

A privately owned design company with its head office in Atyrau; according to the company, it was formed in April 2008 in Almaty, where it keeps an office, and opened an office in Atyrau in 2016, to which its legal address was later moved. It prepares field development projects and their addenda, trial production and exploration projects, with its own environmental sections and emission-standard packages; according to the company, it also produces reserves estimates and geological and reservoir simulation models and develops software for the oil and gas industry. Public-hearing notices of 2022–2026 name the company as developer of the development projects for the Zhanazhol (for CNPC-Aktobemunaigas), Ketekazgan West, Akzhol, Saigak, Kokzhide, Lebyazhye, Shubarkuduk and Zhengeldy fields; its clients also include CNPC-AiDan Munai, Caspi Neft, Kazpetrol Group and Tumar Petrol. The employer card on the state Electronic Labour Exchange shows 54 employees (October 2026). As stated by the organisation, it holds a state licence for works and services in environmental protection.

VerifiedLocal (KZ)Design institutes

KMG Engineering

Service companyAstana +2

Research and design institute of the KazMunayGas group, with its head office in Astana and two branches — KazNIPImunaygas in Aktau and the Atyrau branch; the sole participant of the LLP is NC KazMunayGas JSC. The legal entity was created on 12 March 2014 as the KazMunayGas Research Institute of Production and Drilling Technologies LLP — according to the company, on the basis of the Kazakh Institute of Oil and Gas JSC (KING) and its subsidiary institutes — and was renamed KMG Engineering on 4 May 2019; KING itself did not become part of the institute and has been a separate private company since 2015. In May 2018 the subsidiary institutes became branches: KazNIPImunaygas (which traces its history to the KazNIPIneft institute, 1970) prepares project documents for the Mangystau assets — Ozenmunaigas, Mangistaumunaigaz, Karazhanbasmunai and the KazGPZ gas processing plant — and the Atyrau branch (the former NII Caspiymunaygas LLP) for Embamunaigas and assets in Aktobe, Kyzylorda and West Kazakhstan regions; the head office, according to the company, handles management, monitoring of exploration projects, conceptual design and design review. The branches prepare exploration work projects, reserves estimates, field development projects, technical designs for well construction, working designs of field facilities and environmental documentation; according to the company, they also run laboratory centres (core, PVT, oilfield chemistry, drilling fluids). The institute works almost exclusively for KMG group companies and their joint ventures; the private NIPI Kaspiymunaigaz JSC in Atyrau is a separate organisation and not part of the institute.

VerifiedLocal (KZ)Design institutes