In-house research and design centre of KazTransOil JSC — a branch of the company, not a separate legal entity; it is based in Astana, with design-estimate bureaus also in Aktau and Pavlodar. According to the company, it was created on 3 September 2000 as the Science and Technology Centre branch and renamed the Research and Development Centre in May 2020; since 25 December 2023 it has been located at M. Gabdullin Street 2 in Astana.

It prepares design-estimate documentation for the investment programme and overhaul of KazTransOil's own facilities — trunk oil pipelines, oil pumping stations, tanks and tank farms — together with the environmental sections and emission-limit projects for them.

According to the company, the centre runs laboratories for oil and petroleum products, physical and chemical methods, and corrosion; at the end of 2025 the branch had 127 employees (KazTransOil annual report). It designs only for KazTransOil itself: no work for outside clients was found in public sources, and all licences are held by KazTransOil JSC.

Key competencies

  • Design of trunk oil transportation facilities
  • Environmental design and environmental limit-setting for KazTransOil facilities
  • In-house design centre: works only for KazTransOil JSC
  • Oil rheology and additive selection (according to the company)
  • KazTransOil JSC's category I design licence No. 18012402 of 22 June 2018 — as stated by the organisation
Legal entity
Филиал «Центр исследований и разработок» АО «КазТрансОйл»
Company type
Service company
Founded
2000
Former names
Филиал «Научно-технический центр» АО «КазТрансОйл»

Services

  • Design-estimate documentation for replacement, reconstruction and overhaul of trunk oil pipeline sections
  • Design of oil pumping stations, 20,000 m³ vertical steel tanks and tank farms
  • Design of crossings, feeder pipelines, and launcher and receiver chambers for cleaning and inspection tools
  • Design of oil heaters, boiler houses, power supply, line telemetry and wastewater treatment facilities
  • Engineering surveys (according to the company)
  • Environmental protection sections and impact reports for its own designs
  • Emission and discharge limit projects, waste management and industrial environmental control programmes
  • Laboratory studies of oil and petroleum products: rheology of oil blends, selection of pour-point depressants and drag-reducing additives (according to the company)
  • Corrosion monitoring of oil pipelines (according to the company)
  • R&D and development of company standards (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Locations

Regions

Offices, bases and facilities

  • AstanaHeadquarters
  • AktauOffice
  • PavlodarOffice

Projects and clients in Kazakhstan

As reported in public sources
  • KazTransOil – Uzen head pumping station: dismantling and re-erection of 20,000 m³ tank No. 15 (working design by the Astana design-estimate bureau, 2025) and construction of 20,000 m³ tank No. 12 (hearing on 02.06.2026)
  • KazTransOil – feeder pipeline from the Tengiz pumping station to the Prorva–Kulsary trunk pipeline (hearings on 24.02.2026 and 14.05.2026)
  • KazTransOil – Pavlodar–Shymkent trunk pipeline (820 mm): overhaul of pipeline sections in Turkistan Region (hearings scheduled for October–November 2026) and a similar project in Ulytau Region
  • KazTransOil – reconstruction of the Pavlodar–Shymkent pipeline crossing of the K. Satpayev canal at km 148 near Ekibastuz: impact report (hearings on 19.12.2025 and 14.08.2026)
  • KazTransOil – Kalamkas–Karazhanbas–Aktau trunk pipeline (530 mm): reconstruction of the 0–23 km section (hearings in August 2025)
  • KazTransOil – Uzen–Atyrau–Samara trunk pipeline (1,020 mm): replacement of 76.5 km of pipeline, Aktau design-estimate bureau (hearing on 25.05.2022; adjustment in April–May 2025)
  • KazTransOil – reconstruction of the tank farms at the Zhetybai pumping station and the Kumkol head pumping station (hearings in April–May 2025)
  • KazTransOil – launcher and receiver chambers for cleaning and inspection tools on the Uzen–Atyrau–Samara trunk pipeline at the Inder pumping station and the Sai-Utes oil heating station (2025)
  • KazTransOil – emission and discharge limit projects, waste management and environmental control programmes for the environmental permit of the Ekibastuz pumping station (hearing scheduled for 16.10.2026) and of the Pavlodar head pumping station
  • KazTransOil – reconstruction of wastewater treatment facilities at the T. Kasymov pumping station: environmental protection volume of the working design (2021, under the branch's former name)
  • According to the company, rheology data obtained at the centre formed the basis for the design of the Kazakhstan–China export oil pipeline

Data sources

Report an error

Similar companies

KMG Engineering

Service companyAstana +2

Research and design institute of the KazMunayGas group, with its head office in Astana and two branches — KazNIPImunaygas in Aktau and the Atyrau branch; the sole participant of the LLP is NC KazMunayGas JSC. The legal entity was created on 12 March 2014 as the KazMunayGas Research Institute of Production and Drilling Technologies LLP — according to the company, on the basis of the Kazakh Institute of Oil and Gas JSC (KING) and its subsidiary institutes — and was renamed KMG Engineering on 4 May 2019; KING itself did not become part of the institute and has been a separate private company since 2015. In May 2018 the subsidiary institutes became branches: KazNIPImunaygas (which traces its history to the KazNIPIneft institute, 1970) prepares project documents for the Mangystau assets — Ozenmunaigas, Mangistaumunaigaz, Karazhanbasmunai and the KazGPZ gas processing plant — and the Atyrau branch (the former NII Caspiymunaygas LLP) for Embamunaigas and assets in Aktobe, Kyzylorda and West Kazakhstan regions; the head office, according to the company, handles management, monitoring of exploration projects, conceptual design and design review. The branches prepare exploration work projects, reserves estimates, field development projects, technical designs for well construction, working designs of field facilities and environmental documentation; according to the company, they also run laboratory centres (core, PVT, oilfield chemistry, drilling fluids). The institute works almost exclusively for KMG group companies and their joint ventures; the private NIPI Kaspiymunaigaz JSC in Atyrau is a separate organisation and not part of the institute.

VerifiedLocal (KZ)Design institutes

NIPIneftegaz

Service companyAktau +5

A privately owned oil and gas research and design institute headquartered in Aktau, set up in 1997 and given its present name in 2025; according to the company, it was founded as NIPIneftegaz CJSC and has offices in Almaty, Astana, Oral (Uralsk), Kyzylorda and Atyrau. In 2007 the institute described itself as created on the basis of the KazNIPIneft institute; it is not that institute's legal successor: according to the history published by KMG Engineering LLP, the legal succession of KazNIPIneft leads to that company. According to the company, the institute prepares reserves estimates, exploration, trial production and field development projects, technical projects for well construction, designs of field facilities and industrial plants and environmental documents, and studies core and reservoir fluids in its own laboratory centre. State portals confirm that in 2022–2026 it was named as developer of the development projects for the Karaturun Morskoe, Munaibay, Karamandybas North and Tuzkol fields and of facilities projects at the Dunga field, and a subsoil user's filing names it as the author of the Karabulak North reserves estimate approved by the State Commission on Reserves in 2022; work for Tengizchevroil, KPO and NCOC is listed only on the institute's own site. As stated by the organisation, it holds state licences for the design of mining production in the oil and gas sector (class 1), environmental design and standard-setting, category I design and engineering surveys; its testing laboratory is accredited until 6 October 2030 (register of the National Accreditation Centre), and its average headcount in 2025 was 311 (annual statements filed with the state depository).

VerifiedLocal (KZ)Design institutes

KJS Project & Consulting

Service companyAktau +2

A private design company based in Aktau (KJS Project & Consulting LLP); according to the company, it has a branch in Astana and its first design and survey licences were issued in 2008. It prepares working designs for field facilities in Mangystau — well pads and hook-ups, access roads, oil and gas gathering and transport systems, reservoir-pressure maintenance systems, connection of field pipelines to trunk oil pipelines — together with their environmental protection sections and, according to the company, engineering and geodetic works. Documents on the state public-hearings portal for 2025–2026 name the company as design organisation or project developer for Emir-Oil LLP (Kariman field), Ken-Sary LLP (Arystanovskoye), Meerbusch LLP (Kulzhan), JV Arman LLP, Kom-Munai LLP, Karakudukmunai LLP and Buzachi Neft LLP, and for an early-production project at the Mortuk Vostochny field in Aktobe Region. According to the company, its partners also include Ozenmunaigas JSC, Embamunaigas JSC, Mangistaumunaigas JSC and Karazhanbasmunai JSC — with no work or dates given.

VerifiedLocal (KZ)Design institutes