Skip to content
Brent$117.6Gas TTF$1,192USD453.87 ₸
MunaiHub

KJS Project & Consulting

Service companyAktau+2kjs.kz

What they do

A private design company based in Aktau (KJS Project & Consulting LLP); according to the company, it has a branch in Astana and its first design and survey licences were issued in 2008.

It prepares working designs for field facilities in Mangystau — well pads and hook-ups, access roads, oil and gas gathering and transport systems, reservoir-pressure maintenance systems, connection of field pipelines to trunk oil pipelines — together with their environmental protection sections and, according to the company, engineering and geodetic works.

Documents on the state public-hearings portal for 2025–2026 name the company as design organisation or project developer for Emir-Oil LLP (Kariman field), Ken-Sary LLP (Arystanovskoye), Meerbusch LLP (Kulzhan), JV Arman LLP, Kom-Munai LLP, Karakudukmunai LLP and Buzachi Neft LLP, and for an early-production project at the Mortuk Vostochny field in Aktobe Region.

According to the company, its partners also include Ozenmunaigas JSC, Embamunaigas JSC, Mangistaumunaigas JSC and Karazhanbasmunai JSC — with no work or dates given.

Key competencies

  • Oil-field facilities in Mangystau
  • Connection of fields to the trunk oil pipeline system
  • Working designs together with their environmental protection sections
  • Category I design licence No. 18017712 of 25.09.2018 (as stated by the organisation)
  • Survey licence MKL No. 0000452 of 27.06.2008 (as stated by the organisation)
  • Licence for works and services in environmental protection No. 01590P of 15.08.2013 (as stated by the organisation)
Legal entity
ТОО «KJS Project & Consulting»
Company type
Service company
Founded
2008

Services

  • Working designs for oil and gas field facilities
  • Well pads, hook-ups and upgrades, access roads
  • Oil and gas gathering and transport systems, expansion of group units
  • Reservoir-pressure maintenance systems, conversion of wells to injection
  • Connection of field pipelines to trunk oil pipelines, oil delivery and acceptance points
  • Environmental protection sections for working designs
  • Permissible emission limit projects
  • Engineering and geodetic works: topographic surveys, routing of linear structures (according to the company)
  • Cost estimates, construction organisation plans, technological regulations (according to the company)
  • Design of utilities, roads, industrial and civil buildings (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Upstream (E&P)Midstream (pipelines & storage)

Categories

Locations

Regions

Offices, bases and facilities

  • AktauHeadquarters
  • AstanaBranch

Projects and clients in Kazakhstan

As reported in public sources
  • Emir-Oil LLP – working design 'Expansion of the Kariman field. Facilities of well K-127' (contract of 30.12.2025): design organisation on the title page (2026)
  • JV Arman LLP – working design for connecting the company's pipeline to the KazTransOil trunk oil pipeline system (contract of 23.04.2025): design organisation on the title page (2025)
  • Astana Expo Trade ltd – working design for modernisation of the oil and gas gathering system from wells No. 2 and No. 7 at the Mortuk Vostochny field, early-production stage, Aktobe Region: design organisation (2026)
  • Kom-Munai LLP – modernisation of the facilities of an oil delivery and acceptance point of the Komsomolskoye field: developer (2025)
  • Ken-Sary LLP – Arystanovskoye field: expansion of the reservoir-pressure maintenance system (stage I), well facilities and upgrades, automatic fire-extinguishing at the oil-heating furnaces of the oil treatment unit (2025–2026)
  • Meerbusch LLP – Kulzhan field: well upgrades, expansion of the gas gathering and transport system, pad with access road and facilities of well No. 126 (2025)
  • Buzachi Neft LLP – modernisation at the Karaturun Vostochny field within the oil gathering and transport system design: developer together with another firm (2026)
  • Karakudukmunai LLP – connection of the company's pipeline to the KazTransOil trunk oil pipeline system and conversion of wells between production and injection at the Karakuduk field: co-developer (2024–2025)
  • Tepke LLP – environmental protection section for the corrected working design of well-test metering units at the Tepke Zapadny structure (2025)
  • KAZPETROL GROUP LLP – permissible emission limit projects for the Khairkeldy fields and environmental sections for field-facility working designs: developer together with two other firms (2023–2024)
  • Emir-Oil LLP – working design for expansion of the group unit at the Kariman field (2021)

Data sources

Report an error

Similar companies

KMG Engineering

Service companyAstana +2

Research and design institute of the KazMunayGas group, with its head office in Astana and two branches — KazNIPImunaygas in Aktau and the Atyrau branch; the sole participant of the LLP is NC KazMunayGas JSC. The legal entity was created on 12 March 2014 as the KazMunayGas Research Institute of Production and Drilling Technologies LLP — according to the company, on the basis of the Kazakh Institute of Oil and Gas JSC (KING) and its subsidiary institutes — and was renamed KMG Engineering on 4 May 2019; KING itself did not become part of the institute and has been a separate private company since 2015. In May 2018 the subsidiary institutes became branches: KazNIPImunaygas (which traces its history to the KazNIPIneft institute, 1970) prepares project documents for the Mangystau assets — Ozenmunaigas, Mangistaumunaigaz, Karazhanbasmunai and the KazGPZ gas processing plant — and the Atyrau branch (the former NII Caspiymunaygas LLP) for Embamunaigas and assets in Aktobe, Kyzylorda and West Kazakhstan regions; the head office, according to the company, handles management, monitoring of exploration projects, conceptual design and design review. The branches prepare exploration work projects, reserves estimates, field development projects, technical designs for well construction, working designs of field facilities and environmental documentation; according to the company, they also run laboratory centres (core, PVT, oilfield chemistry, drilling fluids). The institute works almost exclusively for KMG group companies and their joint ventures; the private NIPI Kaspiymunaigaz JSC in Atyrau is a separate organisation and not part of the institute.

VerifiedLocal (KZ)Design institutes

KazTransOil Research and Development Centre (CIR)

Service companyAstana +2

In-house research and design centre of KazTransOil JSC — a branch of the company, not a separate legal entity; it is based in Astana, with design-estimate bureaus also in Aktau and Pavlodar. According to the company, it was created on 3 September 2000 as the Science and Technology Centre branch and renamed the Research and Development Centre in May 2020; since 25 December 2023 it has been located at M. Gabdullin Street 2 in Astana. It prepares design-estimate documentation for the investment programme and overhaul of KazTransOil's own facilities — trunk oil pipelines, oil pumping stations, tanks and tank farms — together with the environmental sections and emission-limit projects for them. According to the company, the centre runs laboratories for oil and petroleum products, physical and chemical methods, and corrosion; at the end of 2025 the branch had 127 employees (KazTransOil annual report). It designs only for KazTransOil itself: no work for outside clients was found in public sources, and all licences are held by KazTransOil JSC.

VerifiedLocal (KZ)Design institutes

NIPIneftegaz

Service companyAktau +5

A privately owned oil and gas research and design institute headquartered in Aktau, set up in 1997 and given its present name in 2025; according to the company, it was founded as NIPIneftegaz CJSC and has offices in Almaty, Astana, Oral (Uralsk), Kyzylorda and Atyrau. In 2007 the institute described itself as created on the basis of the KazNIPIneft institute; it is not that institute's legal successor: according to the history published by KMG Engineering LLP, the legal succession of KazNIPIneft leads to that company. According to the company, the institute prepares reserves estimates, exploration, trial production and field development projects, technical projects for well construction, designs of field facilities and industrial plants and environmental documents, and studies core and reservoir fluids in its own laboratory centre. State portals confirm that in 2022–2026 it was named as developer of the development projects for the Karaturun Morskoe, Munaibay, Karamandybas North and Tuzkol fields and of facilities projects at the Dunga field, and a subsoil user's filing names it as the author of the Karabulak North reserves estimate approved by the State Commission on Reserves in 2022; work for Tengizchevroil, KPO and NCOC is listed only on the institute's own site. As stated by the organisation, it holds state licences for the design of mining production in the oil and gas sector (class 1), environmental design and standard-setting, category I design and engineering surveys; its testing laboratory is accredited until 6 October 2030 (register of the National Accreditation Centre), and its average headcount in 2025 was 311 (annual statements filed with the state depository).

VerifiedLocal (KZ)Design institutes