MunaiHub

Kazakh Institute of Oil and Gas (KING)

Service companyAlmaty+1king.kz

What they do

Private design company in Almaty and the parent of an engineering group that includes NIPI Kaspiymunaigaz JSC (Atyrau), Kazgiproneftetrans Engineering Company LLP and the KazNIPIEnergoprom Institute JSC (both in Almaty). It was created by a Government resolution of 23 December 2002 as a state-owned closed joint-stock company formed from the state shareholdings in two institutes, and until 2015 was a subsidiary of KazMunayGas; two of its institutes — KazNIPImunaygas (Aktau) and NII Caspiymunaygas LLP (Atyrau) — moved to the KMG institute created in 2014 (now KMG Engineering LLP), and in 2015 100% of KING's shares were sold at an electronic auction, since when the company has been private.

KING itself acts as general designer of refining, petrochemical and gas-chemical facilities and trunk pipelines, provides author supervision, prepares environmental documentation and carries out geological studies for subsoil users.

Its clients in state registers for 2021–2026 include KMG PetroChem, MunaiTas, the Atyrau Refinery, the Pavlodar Petrochemical Plant, Kazakhstan Petrochemical Industries and QazaqGaz NTC; together with Fluor, WorleyParsons and Kazgiproneftetrans it founded the KPJV joint venture for the Tengiz Future Growth Project, which was completed in 2025.

Most of the group's staff work in the subsidiary institutes: according to filings in the state depository of financial statements, in 2025 KING itself had 64 employees on average and the group 1,070.

Key competencies

  • General designer of gas-chemical, refining and pipeline transport facilities (state expertise conclusions of 2022–2024)
  • Author supervision at refineries and petrochemical plants
  • Parent company of a design group: NIPI Kaspiymunaigaz, Kazgiproneftetrans, KazNIPIEnergoprom
  • Standardisation and R&D (according to the company)
Legal entity
АО «Казахский институт нефти и газа»
Company type
Service company
Founded
2002
Former names
ЗАО «Казахский институт нефти и газа»

Services

  • Feasibility studies, design-stage ("Project") and design-estimate documentation for refining, petrochemical and gas-chemical facilities
  • Design of trunk oil and gas pipelines
  • Design of external power supply for industrial facilities: substations and networks
  • Author supervision of its own designs
  • Environmental design documentation: emission limits, impact assessment
  • Geological studies and geological support for subsoil users
  • Substantiation and techno-economic assessment of structures for underground gas storage
  • Field facilities design (according to the company)
  • Regulatory and technical documentation: national and interstate standards, adaptation of international standards, consumption norms for materials and technical resources (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Upstream (E&P)Midstream (pipelines & storage)Downstream (refining)PetrochemicalsGas processingPower & utilities

Categories

Locations

Regions

Offices, bases and facilities

  • AlmatyHeadquarters
  • AstanaOffice

Projects and clients in Kazakhstan

As reported in public sources
  • KMG PetroChem – gas separation unit at Tengiz (9.1 billion m³/year), second phase of the integrated gas-chemical complex in Atyrau Region: general designer of the feasibility study (state expertise conclusion of 25.11.2022) and of the "Project" stage (23.06.2023)
  • MunaiTas North-West Pipeline Company – Kazakhstan–China oil pipeline, first stage of the reverse of the Kenkiyak–Atyrau section (up to 6 million t/year), adjustment 2: general designer, state expertise conclusion of 07.03.2024
  • Kazakhstan Petrochemical Industries Inc. – design-estimate documentation "Construction of the integrated gas-chemical complex in Atyrau Region. Adjustment 2" (contract of 01.04.2021, completed)
  • Atyrau Refinery – feasibility study for modernisation of the ELOU-AT-2 unit (contract of 10.10.2023, open tender; completed in 2025)
  • Pavlodar Petrochemical Plant – design-estimate documentation for technical re-equipment of the process control systems of the LK-6U and KT-1 units (contract of 01.10.2021, completed) and author supervision of the project (contract of 13.09.2025, valid to 31.12.2028)
  • Pavlodar Petrochemical Plant – feasibility study for an LPG treatment unit (adjustment): general designer, state expertise conclusion of 27.04.2023
  • QazaqGaz NTC – substantiation and techno-economic assessment of prospective structures for new underground gas storage facilities (contracts of 02.04.2025, completed)
  • Kazakhoil Aktobe – description of the main productive zones of the peripheral part of the northern Alibekmola field and a study of a method for determining reservoir quality at the Kozhasai field (contracts of November 2022, completed)
  • Atyrau Refinery – author supervision of the reconstruction of the treated-effluent canal and reclamation of the evaporation fields (contract of 04.11.2021)
  • Beineu–Shymkent Gas Pipeline – design "Construction of the Beineu–Bozoi–Shymkent gas pipeline. Adjustment 2", developed in 2015 (as stated in a state hearing notice of 22.09.2022)
  • Tengizchevroil – Future Growth Project / Wellhead Pressure Management Project: founder and shareholder of the KPJV joint venture with Fluor, WorleyParsons and Kazgiproneftetrans (2011–2025); in the group's accounts its main visible role was providing personnel to KPJV
  • According to the company: Caspian Pipeline Consortium system (new pump stations, expansion of the Tengiz and Atyrau pump stations, external power supply); integrated development of the Alibekmola field under an EPC contract; pump stations of the Kazakhstan–China oil pipeline

Data sources

Report an error

Similar companies

KMG Engineering

Service companyAstana +2

Research and design institute of the KazMunayGas group, with its head office in Astana and two branches — KazNIPImunaygas in Aktau and the Atyrau branch; the sole participant of the LLP is NC KazMunayGas JSC. The legal entity was created on 12 March 2014 as the KazMunayGas Research Institute of Production and Drilling Technologies LLP — according to the company, on the basis of the Kazakh Institute of Oil and Gas JSC (KING) and its subsidiary institutes — and was renamed KMG Engineering on 4 May 2019; KING itself did not become part of the institute and has been a separate private company since 2015. In May 2018 the subsidiary institutes became branches: KazNIPImunaygas (which traces its history to the KazNIPIneft institute, 1970) prepares project documents for the Mangystau assets — Ozenmunaigas, Mangistaumunaigaz, Karazhanbasmunai and the KazGPZ gas processing plant — and the Atyrau branch (the former NII Caspiymunaygas LLP) for Embamunaigas and assets in Aktobe, Kyzylorda and West Kazakhstan regions; the head office, according to the company, handles management, monitoring of exploration projects, conceptual design and design review. The branches prepare exploration work projects, reserves estimates, field development projects, technical designs for well construction, working designs of field facilities and environmental documentation; according to the company, they also run laboratory centres (core, PVT, oilfield chemistry, drilling fluids). The institute works almost exclusively for KMG group companies and their joint ventures; the private NIPI Kaspiymunaigaz JSC in Atyrau is a separate organisation and not part of the institute.

VerifiedLocal (KZ)Design institutes

Witteveen+Bos Caspian

EPC / EngineeringAlmaty +2

Kazakhstan company of the Dutch consulting and engineering firm Witteveen+Bos — Witteveen+Bos Caspian LLP, with offices in Almaty, Atyrau and Aktau; according to the company, its first office in Kazakhstan opened in Aktau in 2001, followed by Atyrau in 2003 and Almaty in 2007. By its own description, it designs civil and marine infrastructure for oil and gas projects rather than process plant: artificial islands and ice-protection structures, marine access channels, ports and cargo offloading facilities, access roads, industrial wastewater treatment. According to the company, its experts have worked in Kazakhstan since 1997 and have designed Kashagan's islands since 1998; for Tengizchevroil it carried out, from 2012, the feasibility study, environmental impact assessment, surveys, FEED and detailed design of the Cargo Transportation Route (CaTRo), and for NCOC the design of the Kashagan marine access channels from pre-FEED to detailed design (the first phase of the channels was then planned to be operational at the end of 2021). NCOC's mandate for the front-end engineering of the channels was also reported by Energy Intelligence in April 2021. Outside oil and gas the company works on water management, urban mobility and remediation.

VerifiedInternationalDesign institutes

Aksaigazproekt

Service companyAksai

A private design and survey company based in Aksai, West Kazakhstan Region (Aksaigasproject LLP), founded in 2001 according to the company; also according to the company, its design department has an office in Uralsk. According to the list of work on the company's site, most of its projects were done for the operating Karachaganak field: temporary pads for drilling and well workover, access roads, hook-up and connection of wells to manifold stations, in-field pipelines, and upgrades of process units and auxiliary facilities. The state public-hearings portal names the company as developer of environmental protection sections and reports on possible impacts for projects of Karachaganak Petroleum Operating (2025–2026) and as one of the developers of the operator's environmental-permit documentation (2022, 2024). According to the company, it also designs residential and industrial facilities, carries out engineering surveys, technical inspection of buildings and structures with expert opinions, and author and technical supervision, and provides industrial-safety training; its clients also include Zhaikmunai LLP (Chinarevskoye field) and Kondensat JSC. According to the company, it had 101 employees in 2024, 75 of them engineering and technical staff.

VerifiedLocal (KZ)Design institutes