Skip to content
Brent$117.6Gas TTF$1,192USD453.87 ₸
MunaiHub

KAZHADA PROJECTS

Service companyKyzylordakazhada-projects.kz

What they do

A private design and consulting company based in Kyzylorda (KAZHADA PROJECTS LLP); the company does not publish its founding date or any licences of its own on its site.

It prepares working designs for oil-field facilities in Kyzylorda Region — pads and hook-ups of production and water-source wells, flowlines, access roads, power supply and automation, inter-field pipelines and gas pipelines — and environmental documentation: environmental protection sections, permissible emission and discharge limit projects, waste-management programmes.

According to documents on the state public-hearings portal, in 2025 the company was the general design organisation of the working designs for the Khairkeldy group and Taur fields and for the South-West Khairkeldy field for KAZPETROL GROUP LLP; earlier it issued a working design for an inter-field gas pipeline for the same client (2023) and a correction of an inter-field pipeline design for Galaz and Company LLP (2024). It also prepares environmental protection sections for uranium producers — JV KATCO LLP and RU-6 LLP.

According to the company, its clients also include Turgai-Petroleum JSC, CNPC-Ai Dan Munai JSC, JV Kazgermunai LLP and PetroKazakhstan Kumkol Resources JSC — without descriptions of the work or dates.

Key competencies

  • Oil-field facilities in Kyzylorda Region
  • Inter-field pipelines and gas pipelines
  • Environmental documentation and emission limits for subsoil users
  • Environmental protection sections for uranium producers
Legal entity
ТОО «KAZHADA PROJECTS»
Company type
Service company

Services

  • Working designs for oil-field facilities (as general design organisation)
  • Pads and hook-ups of production and water-source wells, flowlines
  • Inter-field pipelines and gas pipelines
  • Access roads, power supply and automation of field facilities
  • Environmental protection sections for working designs
  • Permissible emission and discharge limit projects
  • Waste-management and industrial environmental monitoring programmes
  • Design for industrial, civil and road construction (according to the company)
  • Engineering services during construction (according to the company)

Products & equipment

The company focuses on services — no products listed.

Industries

Locations

Regions

Offices, bases and facilities

  • KyzylordaHeadquarters

Projects and clients in Kazakhstan

As reported in public sources
  • KAZPETROL GROUP LLP – working design 'Field facilities of the Khairkeldy group and Taur fields, 2025' (pads of seven production wells and one water-source well): general design organisation (2025)
  • KAZPETROL GROUP LLP – working design 'Field facilities of the South-West Khairkeldy field, 2025': general design organisation (2025)
  • KAZPETROL GROUP LLP – working design of the inter-field gas pipeline from the Khairkeldy Yuzhny field to the oil treatment unit of the Nuraly field (2023, amended in 2024)
  • Galaz and Company LLP – correction of the design of the inter-field pipeline from the multiphase pump station at the North-West Konys field to booster station DNS-4 at the South-West Khairkeldy field (2024)
  • KAZPETROL GROUP LLP – permissible emission and discharge limit projects, environmental protection sections and waste-management programmes for the Khairkeldy group and Taur fields: developer together with two other firms (2025)
  • JV KATCO LLP (uranium producer) – environmental documents for a petroleum-products depot with a fuelling point at the Tortkuduk site of the Moinkum deposit (2026)
  • RU-6 LLP (uranium producer) – environmental protection sections for two working designs at the Yuzhny Karamurun deposit (undated)

Data sources

Report an error

Similar companies

NIPIneftegaz

Service companyAktau +5

A privately owned oil and gas research and design institute headquartered in Aktau, set up in 1997 and given its present name in 2025; according to the company, it was founded as NIPIneftegaz CJSC and has offices in Almaty, Astana, Oral (Uralsk), Kyzylorda and Atyrau. In 2007 the institute described itself as created on the basis of the KazNIPIneft institute; it is not that institute's legal successor: according to the history published by KMG Engineering LLP, the legal succession of KazNIPIneft leads to that company. According to the company, the institute prepares reserves estimates, exploration, trial production and field development projects, technical projects for well construction, designs of field facilities and industrial plants and environmental documents, and studies core and reservoir fluids in its own laboratory centre. State portals confirm that in 2022–2026 it was named as developer of the development projects for the Karaturun Morskoe, Munaibay, Karamandybas North and Tuzkol fields and of facilities projects at the Dunga field, and a subsoil user's filing names it as the author of the Karabulak North reserves estimate approved by the State Commission on Reserves in 2022; work for Tengizchevroil, KPO and NCOC is listed only on the institute's own site. As stated by the organisation, it holds state licences for the design of mining production in the oil and gas sector (class 1), environmental design and standard-setting, category I design and engineering surveys; its testing laboratory is accredited until 6 October 2030 (register of the National Accreditation Centre), and its average headcount in 2025 was 311 (annual statements filed with the state depository).

VerifiedLocal (KZ)Design institutes

KMG Engineering

Service companyAstana +2

Research and design institute of the KazMunayGas group, with its head office in Astana and two branches — KazNIPImunaygas in Aktau and the Atyrau branch; the sole participant of the LLP is NC KazMunayGas JSC. The legal entity was created on 12 March 2014 as the KazMunayGas Research Institute of Production and Drilling Technologies LLP — according to the company, on the basis of the Kazakh Institute of Oil and Gas JSC (KING) and its subsidiary institutes — and was renamed KMG Engineering on 4 May 2019; KING itself did not become part of the institute and has been a separate private company since 2015. In May 2018 the subsidiary institutes became branches: KazNIPImunaygas (which traces its history to the KazNIPIneft institute, 1970) prepares project documents for the Mangystau assets — Ozenmunaigas, Mangistaumunaigaz, Karazhanbasmunai and the KazGPZ gas processing plant — and the Atyrau branch (the former NII Caspiymunaygas LLP) for Embamunaigas and assets in Aktobe, Kyzylorda and West Kazakhstan regions; the head office, according to the company, handles management, monitoring of exploration projects, conceptual design and design review. The branches prepare exploration work projects, reserves estimates, field development projects, technical designs for well construction, working designs of field facilities and environmental documentation; according to the company, they also run laboratory centres (core, PVT, oilfield chemistry, drilling fluids). The institute works almost exclusively for KMG group companies and their joint ventures; the private NIPI Kaspiymunaigaz JSC in Atyrau is a separate organisation and not part of the institute.

VerifiedLocal (KZ)Design institutes

Aksaigazproekt

Service companyAksai

A private design and survey company based in Aksai, West Kazakhstan Region (Aksaigasproject LLP), founded in 2001 according to the company; also according to the company, its design department has an office in Uralsk. According to the list of work on the company's site, most of its projects were done for the operating Karachaganak field: temporary pads for drilling and well workover, access roads, hook-up and connection of wells to manifold stations, in-field pipelines, and upgrades of process units and auxiliary facilities. The state public-hearings portal names the company as developer of environmental protection sections and reports on possible impacts for projects of Karachaganak Petroleum Operating (2025–2026) and as one of the developers of the operator's environmental-permit documentation (2022, 2024). According to the company, it also designs residential and industrial facilities, carries out engineering surveys, technical inspection of buildings and structures with expert opinions, and author and technical supervision, and provides industrial-safety training; its clients also include Zhaikmunai LLP (Chinarevskoye field) and Kondensat JSC. According to the company, it had 101 employees in 2024, 75 of them engineering and technical staff.

VerifiedLocal (KZ)Design institutes