Skip to content
Brent$104.61Gas TTF$906USD446.56 ₸
MunaiHub
For operators

Legal library

The codes, laws and rules in force today. For each act: what it regulates, its key points and a link to the official text on Adilet.

acts
66
codes and laws
27
rules and methodologies
39
What has changed since 2019

The law at each stage of a project

  1. 01
    Getting the right

    Auction, contract or licence, signature bonus

  2. 02
    Exploration

    Exploration project, geological data, environment

  3. 03
    Development and production

    Development plan, procurement, staff, taxes, exports

  4. 04
    Closing down

    Liquidation security, abandonment and suspension

What has changed since 2019

The main new codes, laws and rules for an oil & gas company.

  1. In force from · 8 September 2026
    Land Code

    Holders of hydrocarbon contracts may sublease plots to another subsoil user working on a shared territory.

  2. In force from · 1 July 2026
    Construction Code

    The Construction Code replaced the 2001 Law on Architectural, Urban Planning and Construction Activities: project expertise, contractor licences, acceptance of facilities through a digital system.

  3. Adopted · 28 April 2026
    Reserves and resources classification instruction

    A new instruction on classifying reserves and resources (Order No. 208) and new reserves estimation methodologies (Order No. 207). For oil and gas the national categories A, B, C1, C2 remain.

  4. In force from · 1 January 2026
    Tax Code (2025)

    The new Tax Code replaced the 2017 Code: VAT 16% instead of 12%; MET on oil 5–18% by output, with a 0.5 factor for domestic sales; from 2027 MET also depends on the world price, and MET payers are exempt from the export rent tax.

  5. In force from · 1 January 2026
    Low-profitability hydrocarbon fields rules (MET)

    New rules on low-profitability fields (Government Resolution No. 1024) replaced the 2018 resolution: a reduced MET rate only for fields with sales profitability of 0% or less. High-viscosity, watered, low-yield and depleted fields are no longer separate categories.

  6. In force from · 10 June 2025
    Water Code (2025)

    The new Water Code replaced the 2003 Code. Reinjection of formation water to maintain reservoir pressure needs neither an environmental nor a special water use permit.

  7. In force from · 1 July 2023
    Social Code

    The Social Code replaced ten laws on pensions, employment and social insurance. Employer pension contributions: 3.5% in 2026, 4.5% in 2027, 5% from 2028.

  8. Adopted · 30 June 2023
    Foreign labour permit rules

    New rules on foreign labour quotas (Order No. 274) and work permits (Order No. 279): four categories of workers; permits of one to three years for operators.

  9. Adopted · 22 July 2021
    Liquidation security rules (hydrocarbons, uranium)

    The liquidation fund was replaced by liquidation security: a pledged bank deposit or, for certain contracts, a guarantee. It is provided before operations begin.

  10. In force from · 1 July 2021
    Environmental Code

    The new Environmental Code replaced the 2007 Code: four facility categories (oil and gas production is Category I), a comprehensive BAT-based permit for Category I since 2025, greenhouse-gas quotas.

  11. In force from · 1 July 2021
    Technical Regulation Law

    The new Technical Regulation Law replaced the 2004 law: products reach the market only after conformity assessment (certificate or declaration).

  12. In force from · 1 July 2019
    Currency Law

    The Currency Law replaced the 2005 law: repatriation of export proceeds, registration numbers for capital-movement contracts.

  13. In force from · 15 January 2019
    Natural Monopolies Law

    The Natural Monopolies Law replaced the 1998 law: tariffs for oil and gas transport by main pipelines are approved by the authorised body.

Hierarchy of acts

Constitution → codes and laws → Government resolutions → ministerial orders (rules, methodologies, instructions). A lower act cannot contradict a higher one.

Subsoil-user taxes 2026

Rates of CIT, MET, export rent tax, export duty and bonuses under the new Tax Code.

The summaries are for orientation and are not legal advice. Only the official text is legally binding. Checked in September 2026.