Skip to content
Brent$104.61Gas TTF$906USD446.56 ₸
MunaiHub

Well productivity index

Productivity index from a stabilized rate and flowing bottomhole pressure, the drawdown, and the rate at another bottomhole pressure (straight-line IPR).

Formula
J = q / (P_res − P_wf)q₂ = J · (P_res − P_wf2)

The straight-line IPR holds for single-phase inflow — while the bottomhole pressure is above the bubble point; below it the productivity falls (see Vogel's IPR). Both pressures at the same depth and on the same scale (absolute or gauge).

Source: Economides M.J. et al., Petroleum Production Systems, ch. 2 (undersaturated oil inflow)

Inputs

You can change a field's unit: the value is converted to the formula's units automatically.

q

The liquid rate gives J for liquid, the oil rate J for oil. Measure after the well has stabilized.

P_res

From the latest shut-in survey (build-up), referred to the mid-perforation depth.

P_wf
Calculate

A downhole gauge, or calculated from the fluid level — at the same depth as the reservoir pressure.

P_wf2

E.g. after a pump or choke change; for a straight line it should not fall below the bubble point.

Unit converter for this formulaLiquid rate · Pressure · Productivity index
Metric
  • m³/d1
  • m³/h0.0416667
  • L/s0.0115741
  • L/min0.694444
  • m³/min0.000694444
US field units
  • bbl/d6.28981
  • Mbbl/d0.00628981
  • ft³/d35.3147
  • US gpm0.183453
  • bbl/min0.00436792

A day is 24 hours.

All units
Result
JProductivity index
Fill in all fields
  • ΔPDrawdown
  • q₂Rate at the new bottomhole pressure

More in Inflow and productivity

Results are engineering estimates from standard formulas; for design decisions check them against the codes, project documents and specialists' calculations. The formulas carried over from the original set are unchanged, and their errors are described in the notes.