Skip to content
Brent$104.61Gas TTF$906USD446.56 ₸
MunaiHub

Overtime, night hours, work on days off and holidays

Extra pay on top of the monthly salary for a five- or six-day week: the hourly rate is the salary divided by the month's norm hours by the balance; overtime and work on days off and holidays at least time and a half, night hours (22:00 to 06:00) topped up to time and a half.

Formula
r = S / NOT = h_ot · r · k_otHOL = h_hol · r · k_holNIGHT = h_n · r · (k_n − 1)Σ = OT + HOL + NIGHT

Overtime and work on days off and holidays are outside the salary and are paid in full at the higher rate; night hours within the schedule are already paid by the salary, so only the premium (k − 1) · r is added. If the month is not worked in full, the salary is paid in proportion to the time worked. Under piece rates the overtime premium is at least 50 % of the rate (Labour Code Art. 108). For summarized working time use the rotation calculator.

Source: Labour Code of Kazakhstan, Arts. 76–78, 85, 106, 108–110; 2026 working-time balance

Inputs

SKZT
Nh

2026, 40-hour week: pick the month in the presets; the average month is 164.67 h.

h_oth

Beyond the norm on working days. At most 2 h a day (1 h in heavy or harmful work) and 12 h a month (Labour Code Art. 78).

h_holh

At the employee's wish another day off is given instead of pay (Labour Code Art. 85(2)).

h_nh

All night hours, including overtime and holiday hours: the night premium is paid separately (Labour Code Art. 110).

k_ot

At least 1.5 (Labour Code Art. 108); more under the employment or collective agreement.

k_hol

At least 1.5 (Labour Code Art. 109).

k_n

At least 1.5 (Labour Code Art. 110); night is 22:00 to 06:00 (Art. 76).

Result
ΣExtra pay for the month
Fill in all fields
  • rHourly rate
    KZT/h
  • OTOvertime pay
    KZT
  • HOLPay for days off and holidays
    KZT
  • NIGHTNight premium
    KZT
  • S + ΣTotal for the month with the salary
    KZT
  • Δ12Overtime beyond the 12 h monthly limit
    h

More in Working time and rotations

Results are engineering estimates from standard formulas; for design decisions check them against the codes, project documents and specialists' calculations. The formulas carried over from the original set are unchanged, and their errors are described in the notes.