Skip to content
Brent$104.61Gas TTF$906USD446.56 ₸
MunaiHub
RulesIn force

Geological study licence application rules

On approval of the Rules for filing and considering applications for licences for geological study of subsoil

The English title is an unofficial translation.

Set how applications for a licence for geological study of subsoil (geological survey and geophysical work, groundwater prospecting and evaluation) are filed and considered.

What matters for an oil & gas company

  • An application on the approved form with the documents required by Article 86 of the Code is logged with a unique number and the date and time of receipt.
  • The authorised body for subsoil study decides within 10 working days, issuing the licence or a reasoned refusal; a refusal may be appealed within 10 working days and the applicant may re-apply.
  • Drilling on a geological study area is allowed only for geophysical surveys and groundwater prospecting (Art. 89 of the Code).

The summaries are for orientation and are not legal advice. Only the official text is legally binding. Checked in September 2026.