Construction permit procedures rules

On approval of the Rules for organising development and completing permit procedures in construction

The English title is an unofficial translation.

2026 rules under the Construction Code (replacing the 2015 rules; in force from 3 August 2026) on the procedure and terms for issuing design inputs — the architectural planning brief (APZ) with technical conditions for connection to utilities and the full package of source materials — for approving the sketch design, for accepting buildings into operation and for developing territories.

What matters for an oil & gas company

  • Source materials are issued by the local executive body (public service 1) on an application filed through the digital government portal or the state urban planning cadastre's digital system: the APZ with technical conditions within 9 working days (15 for technically complex objects), source materials for new construction within 15 (17), and materials for reconstruction that changes load-bearing or enclosing structures, engineering systems or equipment within 15 working days; a reasoned refusal within 5 working days (para 29).
  • The basis is Art. 120(8) of the Construction Code: on the basis of the land right, the local executive body issues the customer an architectural planning brief with technical conditions for connection to utility and communal services, after checking, including through digital systems, that the requirements of Art. 146 of the Code are not breached.
  • Approval of the sketch (sketch design) — public service 2 — takes 10 working days (para 45); the service provider checks that documents are complete within 2 working days (paras 24, 41).
  • The customer accepts a facility into operation when it is fully complete under the approved project and has a declaration of conformity and opinions on the quality of construction works, compliance with the project and fire safety; the date the acceptance act is signed is the commissioning date (paras 51, 54).

The summaries are for orientation and are not legal advice. Only the official text is legally binding. Checked in November 2026.