How to become a supplier to Kazakhstan's oil and gas companies
Preparation, registration and taking part in procurement, set out separately for the Samruk-Kazyna group, subsoil users in Tizilim and the operators NCOC, TCO and KPO. Each step tells you what to do, which documents you need, the deadlines and which point of the rules it is based on.
Checked on 11 November 2026 Subsoil Code, Rules No. 196, Law No. 47‑VII 15 min read
Who buys and where
Oil and gas buyers use three procurement systems. The buyer determines where you register and which rules your bid must follow.
| Buyer | Rules | Where the tenders are | Route |
|---|---|---|---|
| KMGSamruk-Kazyna groupKMG and its subsidiaries, QazaqGaz, KazTransOil | Law No. 47‑VII and the Fund's Procurement Procedure | zakup.sk.kz | A |
| Other subsoil usersfield operators and their contractors | Subsoil Code, Art. 131, and Rules No. 196 | tizilim.gov.kz | B |
| NCNCOCKashagan, PSA | Own procedures | paks.ncoc.kz | C |
| TCOTengizchevroilTengiz | Own procedures | seoi.tengizchevroil.com | C |
| KPOKarachaganak PetroleumKarachaganak, FPSA | Own tender procedures | SAP Business Network | C |
Why NCOC, TCO and KPO have their own rules: under the Subsoil Code (Art. 278, p. 30), subsoil users under production sharing agreements approved by the Government and under contracts approved by the President buy under the procedures of those agreements. Such procedures must give all suppliers a full and fair opportunity to take part in tenders and must apply objective prequalification criteria.
Preparation
Three steps that every procurement system requires. Complete them before you register on the platforms.
- 1
Get an e-signature («ЭЦП») for your legal entity
1 working dayfreeResultAn e-signature certificate from the National Certification Centre (NCA RK) for the head of the company and, if needed, for the employee who will sign bids. Without an e-signature you cannot register in Tizilim or sign a bid.How to do it- Check that the head of the company has an IIN, a valid identity card and a phone number registered in the mobile citizens database: these are needed for remote identification (p. 2, 5).
- Install NCALayer from pki.gov.kz: you need it to get the e-signature and to sign documents with it.
- Apply for a certificate with the «Первый руководитель» (Chief executive) template on pki.gov.kz or in eGov, and pass remote identification: biometrics and an SMS code. If it fails, get the certificate at a Public Service Centre («ЦОН») instead (p. 5–6).
- If an employee will sign bids, get them a certificate with the «Сотрудник с правом подписи» (Employee with signing authority) template. The head of the company approves that certificate application with their own e-signature in their personal account on pki.gov.kz (p. 3, 5).
- Choose where to keep the certificate. On a chip ID card, in cloud storage or on a secure token it is valid for 3 years; in a file or in the eGov app, for 1 year (p. 15).
Non-residents. First you need a BIN: a branch or representative office gets one when it is registered, and a company without a branch gets one on tax registration in the cases listed in the law. Then apply in the «Нерезиденты» (Non-residents) section on pki.gov.kz and visit a Public Service Centre with a notarised translation of your documents.
Based on: Digital Code of Kazakhstan No. 255-VIII · Rules for issuing NCA RK e-signature certificates (Order No. 522/NK of 28.08.2026), p. 2–3, 5–6, 13, 15, Annex 1 p. 8 · Law on National Registers of Identification Numbers, Art. 9 p. 8
- 2
Assemble a standing set of documents and permits
15 minutes to 30 working daysResultThe documents every procurement system asks for: a registration certificate, constituent documents, and the licences and permits for your activity and equipment.How to do it- Download the certificate of state registration of your legal entity from eGov, using the «Справки/сведения по юридическим лицам» (Certificates/information on legal entities) service: free, about 15 minutes; the result arrives in the «Сообщения» (Messages) section.
- Make electronic copies of the charter (if you use the standard charter, of the registration application) and of the document on your founders; for a joint-stock company, of the extract from the register of shareholders.
- Check Annexes 1 and 2 of the Law on Permits and Notifications to see whether your activity needs a licence. In oil and gas this is above all the licence for works and services in the field of hydrocarbons, with 13 sub-types: seismic surveys, geophysics, drilling, workover, completion and abandonment of wells, cementing, enhanced oil recovery and others. Licences are issued on elicense.kz: up to 30 working days in the field of hydrocarbons, up to 15 for the others (Art. 30).
- Do you supply hazardous technical devices — boilers and pressure vessels above 0.07 MPa, cranes, rigs for drilling and repairing wells deeper than 200 m? Check whether the device is approved for use in Kazakhstan. The permit is issued once and is valid for everyone; the Industrial Safety Committee of the Ministry of Emergency Situations publishes the list of approved devices. Since 1 January 2026, devices that have passed certification do not need the permit (Art. 74).
- If the device is neither approved nor certified, order an industrial safety review from an accredited organisation and apply to the Industrial Safety Committee through egov.kz or elicense.kz: 3 working days, free.
Important. Do not order the tax and bank certificates in advance: for a subsoil user's tender they must be issued no earlier than one month before bid acceptance opens (Rules No. 196, p. 41). Get them for each specific procurement.
Based on: Law on State Registration of Legal Entities…, Art. 12 · Law on Permits and Notifications No. 202-V, Art. 30, Annexes 1–2 · Law on Civil Protection, Art. 1, 12‑2, 16, 73–74 · Rules No. 196, p. 38, 41
- 3
Add your goods to the KTP register
15 working daysfreeResultAn entry in the Register of Kazakhstani Producers and an extract from it, which has replaced the ST-KZ certificate since 1 January 2026. This step is only for producers of goods resident in Kazakhstan. Contractors and service companies skip it: their status is confirmed in the bid itself.How to do it- Check that the good qualifies: it is made entirely in Kazakhstan, or processed here with at least the minimum threshold of production and technological operations (the Law, Art. 1, 51‑3).
- Prepare the data for the application (p. 10): the product codes (TN VED, KP VED, ENS TRU), the operations you perform and a video of the process, the domestic value share of each good (the formula is in Annex 4), annual capacity, equipment (model, year, country), premises, permits, and the conformity document if one is mandatory.
- Submit the application in your personal account on e-ondiris.gov.kz and sign it with your e-signature. In the application you consent to data processing, access to your production site and video surveillance with remote access.
- Wait for the decision: the digital check takes 3 working days, the industry commission's assessment 10 (the clock stops during the visit to your production site), and the decision 2 working days (p. 14, 17, 23, 26).
- Install video surveillance within 30 calendar days of being included (p. 11).
- For each procurement, generate a fresh extract in your personal account: it shows the date it was generated (p. 6).
Producers-only tenderTwo or more producers of the good in the register: the subsoil user holds the tender among them only (p. 6‑1 of Rules No. 196)Direct purchaseYou are the only producer in the register: the subsoil user buys from you as a single source (p. 6‑1)Price minus 20 %When bids are compared, your price is conditionally reduced by 20 %; bid security is no more than 0.5 % (p. 45, 51)Important. The extract has no set validity period: your status holds while you are in the register. It is checked every quarter, and you can be removed on the grounds set out in the Law (Art. 51‑4, 51‑6).
Based on: Law on Industrial Policy, Art. 1, 51‑1–51‑7, 68 · Rules for keeping the KTP register (Ministry of Industry and Construction Order No. 327 of 27.08.2025, as amended by Order No. 456 of 14.09.2026), p. 6, 10–11, 14, 17, 23, 26 · Rules No. 196, p. 6‑1, 45, 51
Next steps depend on your buyer
Each route has its own steps 4–8. If you sell to several groups of buyers, follow several routes: the preparation in steps 1–3 is common to all of them.
Samruk-Kazyna group: procurement through zakup.sk.kz
For sales to KMG and its subsidiaries, QazaqGaz, KazTransOil and other organisations in which the Fund owns 50 % or more. They buy under Law No. 47-VII and the Fund's Procurement Procedure (as amended on 3 September 2026).
- 4
Register on zakup.sk.kz
chief executive's e-signatureResultA supplier account on the Fund's procurement portal with a signed user agreement. The portal uses the documents in your profile when you submit bids.How to do it- Open zakup.sk.kz, click «Зарегистрироваться» (Register), then «Получить данные ключа» (Get key data). Only the chief executive can register the company, with the e-signature from step 1.
- Fill in the sections «Данные компании» (Company details), «Контактная информация» (Contact information), «Учредители» (Founders), «Первый руководитель» (Chief executive) and the main user's details.
- Click «Подписать» (Sign), accept the user agreement and sign it with the e-signature of the head of the company. The agreement does not expire (p. 7.1).
- Confirm your email via the link in the message.
- In your profile, add your bank details, actual address and the registration certificate from eGov (an individual entrepreneur adds the notification from elicense.kz), then click «Отправить» (Send).
- Enter the ENS TRU codes of your goods, works and services with prices: you get procurement notifications for these codes. Update the prices every quarter, by the 5th of the following month (Portal Rules, p. 3).
Non-residents. The portal accepts e-signature certificates issued by Gamma Technologies LLP on a USB token; register through the «Для нерезидентов» (For non-residents) button (Portal Rules, p. 4–5). Portal support: support2@skc.kz, +7 7172 55 22 66, working days 09:00–18:30.
Based on: User agreement of zakup.sk.kz, p. 1.5, 7.1 · Rules for working with the procurement web portal (decision of the Fund's Management Board No. 23/22 of 28.04.2022), p. 3–5 · registration instructions of Samruk-Kazyna Contract LLP
- 5
Go through prequalification if your category is in the Nomenclature
paidvalid for 3 yearsResultA place in the register of qualified potential suppliers («Реестр КПП»). Procurement in the Nomenclature categories is first held among qualified suppliers only, if there are at least two of them (Art. 29, p. 10).How to do it- Find your category in the «Номенклатура ПКО» (prequalification Nomenclature) on the portal (version 2.0 of 7 September 2026). If your category is not there, go to step 6.
- Apply for prequalification («ПКО») in your category and receive the questionnaire (Art. 14, 17).
- Fill in the questionnaire, attach the documents and sign it with your e-signature no later than 20 working days after receiving it (Art. 17, p. 4). The documents must remain valid for another 6 months; a non-resident's documents need legalisation or an apostille and a notarised translation (Art. 20).
- The questionnaire is reviewed within 5 working days (Art. 18). Then sign the prequalification contract within 3 working days and confirm payment on the «Оплата» (Payment) tab (Art. 19).
- Go through the audit: a desk audit takes up to 6 working days; an on-site audit follows a plan that you agree within 1 working day (Art. 21). The decision on inclusion in the register of qualified suppliers is made within 5 working days of the report (Art. 22, p. 1).
- Keep your file up to date: enter changes within 20 working days, or your status will be suspended (Art. 24).
Important. In procurement among qualified suppliers only, no bid security is required and the lowest price wins (Art. 36, p. 6; Art. 42, p. 13). The register of qualified suppliers is publicly available (Art. 22, p. 5).
Based on: Fund's Procurement Procedure (as amended on 03.09.2026), Art. 14–24, 29 p. 10, 36 p. 6, 42 p. 13 · Law No. 47-VII, Art. 11 p. 3
- 6
Find a procurement and discuss the draft documents
comments: 3 working daysResultYou see the procurement while it is still a draft and have time to influence the terms before the documents are approved.How to do it- Watch the procurement plans and announcements in the open section of the portal (zakup.sk.kz/#/ext). Notifications for your ENS TRU codes arrive in your personal account (step 4).
- Follow the draft tender documents: the customer posts a draft no later than 5 working days before approval (Art. 35, p. 19).
- Send comments and questions on the draft no later than 3 working days after it is posted (Art. 35, p. 20). After approval, questions are asked in the way set out in the documents themselves.
- Note the deadlines: the tender announcement is published no later than 10 calendar days before bids are opened, or 5 for a repeat procurement (Art. 40, p. 1). Qualified suppliers receive the invitation automatically (Art. 40, p. 2).
- Check the procurement method. Request for price quotations: announced 5 working days ahead, the lowest price wins (Art. 49–52). The e-shop is for purchases of up to 20,000 MCI (Art. 58).
Based on: Law No. 47-VII, Art. 6 · Fund's Procurement Procedure, Art. 12, 35, 40, 49–52, 58
- 7
Submit a tender bid
security up to 1 %ResultA bid in the form of Annex 6 to the Procedure, signed with your e-signature and accepted by the portal before opening.How to do it- Assemble the bid under Annex 6: the signed bid form, licences, technical specification, the good's brand, model, manufacturer and country of origin, list of subcontractors, price offer, information on beneficial owners, and the signatory's power of attorney.
- The document on your registration, chief executive and founders must be issued no earlier than 30 calendar days before opening; this requirement does not apply to non-residents (Annex 6, p. 9).
- Attach evidence for the conditional price reduction (Annex 5, p. 15): 5 % if you produce the offered good (extract from the KTP register); for experience over the last 5 years, 1.5 % for 3 years and 0.5 % for each further year, up to 2.5 % (waybills, or completion certificates and invoices); 3/4/5 % if your employees' pay is 10/15/20 % above the threshold in the documents; 1 % for SME status.
- Provide bid security if the documents require it: no more than 1 % of the procurement amount, as an electronic bank guarantee or as money in the electronic wallet on the portal (Art. 36, p. 2–3). Producers, and qualified suppliers in procurement among qualified suppliers, do not provide security (Art. 36, p. 6).
- Sign the bid with your e-signature and submit it before the opening date and time; the portal immediately sends a confirmation of receipt (Art. 40, p. 4, 6).
The price is rejected as dumping if it is lower than (Art. 42, p. 10)- the average price of all bids by more than 15 %, for goods
- the average price by more than 20 %, for works and services
- the average price by more than 70 %, for consulting services
- the amount in the procurement plan by more than 5 %, for construction and installation works under design and estimate documents that have passed expert review
Based on: Fund's Procurement Procedure, Art. 36, 40, 42 p. 9–10; Annex 5 p. 15; Annex 6
- 8
Supplement your bid in response to remarks and sign the contract
contract within 5 working daysResultA contract signed on the portal and the performance security provided.How to do it- The commission reviews bids for up to 10 working days after opening, and up to 15 for complex procurement with experts (Art. 42, p. 2).
- If the commission finds discrepancies, supplement your bid within 2 working days of the notice, or 5 for samples of goods. A bid cannot be corrected if the security has not been provided (Art. 42, p. 4). Rejecting a bid on formal grounds is prohibited (Art. 42, p. 9).
- The lowest conditional price wins. In a tie, the producer wins, then an SME, then the earlier bid without discrepancies, then simply the earlier bid (Art. 42, p. 11).
- The customer sends the signed draft contract within 7 working days of the results protocol, but not sooner than 3. Sign it on the portal within 5 working days, or within 7 if you are a non-resident (Art. 61, p. 2).
- If the contract requires performance security, provide it within 20 working days of signing: no more than 5 % of the contract amount (Art. 64, p. 1; Annex 5, p. 27). Producers do not provide it (Art. 43, p. 7).
Important. If you evade signing the contract or fail to provide performance security, the company is put on the Fund's list of unreliable suppliers for 24 months and cannot take part in the Fund's procurement (Art. 26, 31). Complaints about the results are filed through the portal within 2 working days of the protocol (Law No. 47-VII, Art. 16).
Based on: Fund's Procurement Procedure, Art. 26, 31, 42–43, 61, 64; Annex 5 p. 27 · Law No. 47-VII, Art. 16
Subsoil users: procurement through Tizilim
For sales to hydrocarbon subsoil users that buy under Rules No. 196: all operators except the Samruk-Kazyna group, PSA operators and complex projects. Subsoil users' contractors buy under the same rules.
- 4
Register in Tizilim as a supplier
immediately after signingResultA supplier account in Tizilim. Without it you cannot download the tender documents, and without downloaded documents you are not admitted to the lot (p. 30).How to do it- Open tizilim.gov.kz and click «Зарегистрироваться» (Register).
- Choose the «Поставщик» (Supplier) role.
- Fill in the company details and upload electronic copies of the documents listed below.
- Read the user agreement and sign it with the legal entity's e-signature; registration is completed at once.
- From then on, log in with the e-signature, email and password you gave at registration.
Documents for registration (p. 38)- Legal entity: certificate of state registration (re-registration) and the document on the founders: the charter; with a standard charter, the registration application; for a joint-stock company, an extract from the register of shareholders
- Individual entrepreneur: the notification of starting business and/or the slip confirming its acceptance
- Consortium: the consortium agreement, and the members' registration certificates and charters
- Non-resident: the same documents, or documents with the same information, with a notarised translation into Kazakh and/or Russian
Important. If your charter or founders change, update the data in Tizilim (p. 38). Files: PDF, RAR or XLSX, up to 300 MB.
Based on: Rules No. 196, p. 30, 38 · Tizilim FAQ · support: tizilim@qazindustry.gov.kz, Telegram bot @iDos_prime_bot (replies within 1–3 days)
- 5
Find a tender and download the documents
announced 10–20 working days aheadResultThe tender documents and technical specification downloaded for each lot you bid for, and your questions on the terms cleared up.How to do it- Look for announcements in Tizilim. They are published no later than 10 working days before the bid deadline if the lot is worth no more than 20,000 MCI (86.5 million tenge in 2026), and 20 working days before if it is worth more (p. 35).
- Check the announcement for the lots, place and time of delivery, amount per lot excluding VAT, minimum in-country value in %, deadline for concluding the contract and bid validity period (p. 36).
- Download the tender documents and technical specification for each lot. The system records downloads; a bidder who has not downloaded them is not admitted to the lot (p. 29–30).
- If a term is unclear, send a request for clarification through Tizilim no later than 5 working days before the bid deadline. The customer replies within 3 working days. If you send no request, you are taken to agree with the documents (p. 32).
- Watch for changes: the customer may amend the documents no later than 1 working day before the bid deadline and posts the new version in the system (p. 33).
Important. The customer may not set requirements beyond the Rules: your staff's work experience, specific trademarks, a particular manufacturer (p. 27). Challenge such a requirement with a request for clarification.
Based on: Rules No. 196, p. 27, 29–30, 32–33, 35–36 · 2026 MCI: 4,325 tenge (Law No. 239-VIII, Art. 7)
- 6
Assemble your bid
certificates no older than 1 monthResultA complete set of documents for each lot in Kazakh and/or Russian, ready to be signed with your e-signature.How to do it- Order two certificates issued no earlier than one month before bid acceptance opens: a bank certificate of no overdue debt (from every bank where you have an account) and a tax certificate of no tax debt or of a debt below 1 tenge (p. 41).
- Prepare the technical specification: functional, technical, quality and performance characteristics, and conformity documents. For goods, state the country of origin, the manufacturing plant and the model (p. 41).
- State your in-country value commitment in % for each lot, no lower than the minimum in the announcement (p. 41, 65).
- If you are a Kazakhstani producer, attach proof, or the 20 % conditional price reduction will not be applied (p. 45, 66): for goods, an extract from the KTP register (step 3); for works and services, «Сведения о количестве работников» (Information on the number of employees) in the form of Annex 2 to the Rules.
- Add the documents that the tender documents require: licences; a letter from the manufacturing plant; proof of experience, that is, letters or references from customers with acceptance certificates for each year of experience (experience may be required only for works and services worth more than 20,000 MCI a year) (p. 26, 41).
- Draw up a price offer for each lot separately, excluding VAT and including the costs that the tender documents require (p. 36, 41).
- Translate documents in a foreign language into Kazakh or Russian and have the translation notarised; otherwise the document is treated as not submitted (p. 39).
The bid is rejected if (p. 65)- at least one document from p. 41 is missing
- the tax certificate shows a debt of 1 tenge or more
- the price is below 80 % of the amount allocated to the lot
- the in-country value is below the minimum in the tender documents
- the technical specification does not meet the tender documents
- the tender is for producers only and you are not in the KTP register
- you are an inactive taxpayer or have no tax returns for 3 years (except for lots up to 20,000 MCI and for producers)
- within 24 months after a court has ruled that you failed to perform a procurement contract, if the customer so decides
Based on: Rules No. 196, p. 26, 36, 39, 41, 45, 65–66 · Subsoil Code, Art. 131
- 7
Provide the security and submit your bid
security up to 1 %ResultThe bid is signed with your e-signature and registered in Tizilim before the deadline.How to do it- If the tender documents require bid security, provide it: no more than 1 % of the lot amount, and no more than 0.5 % in a tender among producers (p. 51). You choose the form: money paid to the customer's account or a guarantee from a Kazakhstani second-tier bank (p. 52).
- If you paid in money, attach the payment order with the procurement code and the lot number (p. 41).
- If you chose a guarantee, hand the original to the customer in a sealed envelope before the bid deadline. On the envelope: your name and address, the customer's name and address, and the names of the tender and the lot. A late envelope is not opened (p. 43).
- Sign the bid with your e-signature and post it in Tizilim before the deadline; the submission is registered automatically. One bid per lot (p. 39, 46, 48).
- Before the deadline you can change, supplement or withdraw the bid without losing the security. After it, you cannot (p. 47–48).
Important. After the deadline the system will not accept a bid (p. 40). Submit early: if price and in-country value are exactly equal, the earlier bid wins (p. 78).
Based on: Rules No. 196, p. 39–41, 43, 46–48, 51–52, 78
- 8
Wait for the results and sign the contract
contract within 5 working daysResultA signed contract for the purchase of goods, works and services, and the performance security provided.How to do it- Answer the commission's requests: it may ask for clarifications of your bid through the system, and you reply within 2 working days; you may not change the substance of the bid (p. 64). The admission decision is made no later than 5 working days after the bid deadline, unless the tender documents allow more (40 at most) (p. 62).
- The system picks the winner by the lowest price. When bids are compared, the prices of Kazakhstani producers of goods, works and services are conditionally reduced by 20 %. At equal prices the Kazakhstani producer wins, then the higher in-country value, then the earlier bid (p. 75–78; Subsoil Code, Art. 131).
- If you win, the notice arrives by email on the day the results are published. Within 5 working days (a non-resident, within 7) submit the signed contract, the originals or notarised copies of the documents listed in the notice, and the signatory's power of attorney or the order appointing the head of the company (p. 83).
- If the contract requires performance security, provide it within 10 working days of signing: no more than 3 % of the contract amount, or no more than 1 % in procurement among producers; in money or as a guarantee from a Kazakhstani second-tier bank (p. 104–106, 109).
Important. If you do not submit the contract on time or your documents fail the check, the bid security is not returned (p. 56). Bidders who did not come first or second get their security back within 10 working days of the protocol (p. 58). The results can be challenged only in court (p. 83‑1).
Based on: Rules No. 196, p. 56, 58, 62, 64, 75–78, 83, 83‑1, 104–106, 109 · Subsoil Code, Art. 131
NCOC, TCO and KPO: their own supplier systems
The operators of Kashagan, Tengiz and Karachaganak do not publish open tenders: they invite suppliers from their databases. Getting into the database is the main task. Do steps 5–7 for the operators you want to sell to.
- 4
Find your items in the procurement plans
open accessResultA list of the codes of your goods and services in the operators' classifications, and the dates by which you need to be registered.How to do it- Open the plans of the three operators; the addresses are in the table.
- Find the items for your goods and services and write down the codes: for NCOC, from the procurement plan; for KPO, the FPAL codes; for TCO, from the “TCO Product and Services List”.
- Note when procurement starts: only registered suppliers receive invitations, so register in advance.
NCOC TCO KPO Where ncoc.kz — procurement plan tengizchevroil.com — procurement plan kpo.kz — contract plan What is published Annual plan for 2026 and medium-term plan for 2026–2029, updated 5 November 2026 Contract and procurement plan for 2026, updated 2 February 2026 Annual plan for 2025 and medium-term plan for 2025–2029, dated 6 March 2025 What the plan shows Procurement volumes, methods and timing A forecast: items may be postponed or cancelled Subject, FPAL codes, start quarter, value in USD ranges, contract term WhereNCOC — ncoc.kz — procurement plan
TCO — tengizchevroil.com — procurement plan
KPO — kpo.kz — contract plan
What is publishedNCOC — Annual plan for 2026 and medium-term plan for 2026–2029, updated 5 November 2026
TCO — Contract and procurement plan for 2026, updated 2 February 2026
KPO — Annual plan for 2025 and medium-term plan for 2025–2029, dated 6 March 2025
What the plan showsNCOC — Procurement volumes, methods and timing
TCO — A forecast: items may be postponed or cancelled
KPO — Subject, FPAL codes, start quarter, value in USD ranges, contract term
Based on: NCOC, TCO and KPO websites, checked on 11.11.2026. Open the TCO site without “www”: www.tengizchevroil.com currently has a certificate error.
- 5
NCOC: complete your vendor cabinet to 100 %
in EnglishResultA profile in NCOC's supplier database. NCOC picks companies for prequalification from it and draws up tender lists. Registration is not yet qualification.How to do it- Open paks.ncoc.kz, click “Registration” and enter your email, a password and your BIN (a foreign company enters its registration number). The BIN can be set only once, so check it.
- Confirm your email via the link, log in and click “I accept and continue”.
- Fill in all profile sections in English: general information, personnel, certificates and licences, finance, bank details, resources, subcontractors, shareholders, work experience, HSSE, QA/QC, cost control. No field may be left blank; “N/A” is allowed but may lower your score.
- Add the codes of goods and services from the NCOC plan (step 4). A code can be added only through a work experience record, so without experience you cannot add it.
- Upload as PDF: the charter, registration certificate, organisation chart and CVs, certificates, financial statements for 3 years, and the signed undertaking for the supplier qualification assessment and statement of compliance with business ethics standards.
- If you supply goods, respond to “Open Demand” items with the “I can supply” button: delivery time in days, Incoterms, place. Companies registered in Kazakhstan offer DDP only.
Important. NCOC reviews only a profile that is 100 % complete, and does not send a notice of completion. Log in to the cabinet at least once every 6 months, or the profile will be deactivated. The threshold for audited statements (USD 4 or 10 million) and the file size limit (5 or 30 MB) differ between the language versions of the cabinet: upload PDFs of up to 5 MB and check the threshold at allvqmi@ncoc.kz.
Based on: ncoc.kz — Doing business with NCOC, Procurement process · Online Vendor Cabinet guide · Open Demand Guideline (rev. 0 of 27.04.2022) · questions: allvqmi@ncoc.kz
- 6
TCO: submit an SEOI form
freevalid for 1 yearResult“Registered” status and a TCO registration number. This is neither an invitation to tender nor prequalification: if TCO is interested, it will contact you.How to do it- Open seoi.tengizchevroil.com and click “Create SEOI Account”. Accept the user agreement and the confidentiality agreement (English law, London courts).
- Set a login and password; you cannot change them later. Use a corporate email address, not a personal one.
- Enter the legal entity's details, click “Register New Supplier” and confirm your email within 5 days.
- Fill in the web form in English: year founded, type and size of business, share of Kazakhstani ownership and staff, manufacturing, addresses, and up to 10 codes from the “TCO Product and Services List”.
- Upload the documents: Form 1, confirming your representative's authority, on letterhead, in English; the registration certificate (a foreign company uploads its constituent documents with an English translation); Form 2, your work over 3 years (Excel, in English); certificates and licences; reference letters from the clients listed in Form 2. Files: PDF, DOCX, XLSX or PPTX, up to 10 MB.
- Click “Submit”: a system email arrives within 24 hours, and the status and number also come by email. Registration is valid for a year after your last submission; a reminder comes 30 days before it expires.
Important. TCO's instructions (2017) ask producers for an ST-KZ certificate, which has not been issued since 2026: ask TCOSEOI@tengizchevroil.com which document to attach instead. Documents sent by email are not accepted. Do not call TCO staff: send questions only to this address, with your legal entity's name in the subject line.
Based on: SEOI Instructions for Supplier, v6.0 · Quick Guide to SEOI (July 2026) · SEOI FAQ
- 7
KPO: register in SAP Business Network
form in one sessionResultA place in KPO's supplier database and access to SAP Business Network linked to KPO. Without a preliminary assessment and an entry in the database, KPO does not admit you to its tenders.How to do it- Download KPO's supplier guide (June 2025) and prepare all data and files in advance: the form cannot be saved unfinished, and the session ends after 30 minutes of inactivity.
- Open the Ariba self-registration form via the link on the Registration in the KPO supplier database page. Companies that were already in KPO's database also register again, through supplier.ariba.com.
- Fill in the form: country of registration and origin, name in Latin letters (local companies also in Kazakh and Russian), BIN or tax number, VAT, head of the company, a shared corporate mailbox (for example, tender@), contact person, website and description.
- Choose FPAL categories at the last, 4th level only; extra codes can lead to rejection.
- Attach the registration certificate, organisation chart, licences and certificates, up to 3 client references and a list of work over 3 years in KPO's format. Each file up to 10 MB, up to 104 MB in total.
- Wait for KPO's decision by email (check your spam folder). If approved, follow the link, create or link an SAP Business Network account, confirm your email, add your goods and services and delivery locations, and submit.
Important. Requests to MIVQ@kpo.kz are no longer accepted: send registration questions to eprocsupport@kpo.kz. Forward suspicious letters, invoices and offers sent in KPO's name to informkpo@kpo.kz.
Based on: kpo.kz — Registration in the KPO supplier database · Supplier guide (June 2025)
- 8
Go through prequalification and submit an offer when invited
by invitation onlyResultA place on the tender list and a submitted offer. The operator tells you its deadlines and criteria itself; below is what the operators publish.How to do it- Answer the operator's requests on time and in full: NCOC may end prequalification if the requested information is not provided.
- Prepare your production site or office for an on-site assessment; NCOC has this stage.
- Once invited, ask questions in writing and only to the contact person named in the invitation. At NCOC, all bidders receive the answer.
- Prepare the technical and price parts separately. At NCOC, the price envelope is opened only if the technical offer is accepted; at KPO, you first submit the part without prices, then the part with prices.
- Calculate in-country value under the Unified Methodology (Order No. 260 of 20 April 2018); KPO's website has a presentation on the calculation.
NCOC TCO KPO Who starts NCOC itself, when it has a need; led by a supplier quality engineer TCO contacts you itself if interested Preliminary assessment is mandatory Stages Cabinet → detailed questionnaire → review of the questionnaire and finances → on-site assessment Not published Not published Result A 3-year certificate for each code Not published An entry in KPO's supplier database Tender Selective: at least 3 bidders where possible; two envelopes Procedure not published Competitive; two parts, without and with prices (2023 guide) Local content Local content memorandum in the contract A Kazakhstani content plan is agreed and included in the contract In-country value under the Unified Methodology Who startsNCOC — NCOC itself, when it has a need; led by a supplier quality engineer
TCO — TCO contacts you itself if interested
KPO — Preliminary assessment is mandatory
StagesNCOC — Cabinet → detailed questionnaire → review of the questionnaire and finances → on-site assessment
TCO — Not published
KPO — Not published
ResultNCOC — A 3-year certificate for each code
TCO — Not published
KPO — An entry in KPO's supplier database
TenderNCOC — Selective: at least 3 bidders where possible; two envelopes
TCO — Procedure not published
KPO — Competitive; two parts, without and with prices (2023 guide)
Local contentNCOC — Local content memorandum in the contract
TCO — A Kazakhstani content plan is agreed and included in the contract
KPO — In-country value under the Unified Methodology
Important. NCOC does not have to choose the lowest price: the most economically advantageous and technically acceptable offer wins. NCOC is moving new contracts to a new e-procurement system; bidders will be told about separate registration in it.
Based on: ncoc.kz — Procurement process · kpo.kz — “E-tendering system”, “In-country value calculation” · tengizchevroil.com — Kazakhstani content · Subsoil Code, Art. 278 p. 30
Scams and blacklists
Registration with TCO is free. Any request to pay for SEOI or for a place in a tender is fraud: report it to the TCO hotline (TCOhotline.com, 8 7273 57 44 75). Check letters, invoices and offers sent in KPO's name with informkpo@kpo.kz; NCOC has an anonymous hotline.
A failed contract shuts you out of procurement for 24 months: in the Samruk-Kazyna group, through the Fund's list of unreliable suppliers (Procedure, Art. 26) and the register of unfair procurement participants (Law No. 47‑VII, Art. 10); with subsoil users, your bid can be rejected within 24 months after a court rules that you failed to perform a contract (Rules No. 196, p. 65).
Frequently asked questions
What happened to NADLoC and reestr.nadloc.kz?
Since 1 July 2025, subsoil users announce procurement only in the new version of the register, Tizilim (tizilim.gov.kz). Suppliers must register again in the new system (step 4 of Route B). Since 4 May 2026 the old version has run at old.tizilim.gov.kz; the reestr.nadloc.kz address has been switched off.
Has the ST-KZ certificate been abolished, and what replaces it?
Yes. ST-KZ certificates and industrial certificates were valid until 1 January 2026 (Law on Industrial Policy, Art. 68). Now a free extract from the Register of Kazakhstani Producers on e-ondiris.gov.kz confirms the Kazakhstani origin of a good (step 3).
How do I become a TCO supplier?
Submit an SEOI form at seoi.tengizchevroil.com: it is free and in English, and registration is valid for a year. It is not an invitation to tender: if TCO is interested, it will contact you (step 6 of Route C).
Where can I find NCOC, KPO and KMG tenders?
NCOC and KPO do not publish open tenders: they invite suppliers from their databases and post their procurement plans on ncoc.kz and kpo.kz (step 4 of Route C). Procurement by KMG and other Samruk-Kazyna group companies is in the open section of zakup.sk.kz (step 6 of Route A).
How do I register on zakup.sk.kz?
With the chief executive's e-signature: «Зарегистрироваться» (Register) → «Получить данные ключа» (Get key data) → company details → signing the user agreement → email confirmation → bank details and documents → «Отправить» (Send). See step 4 of Route A.
Do buyers charge for registration?
Registration with TCO is free; the SEOI page says so. Tizilim, zakup.sk.kz, NCOC and KPO do not mention any registration fee. What you pay for is prequalification («ПКО») in the Samruk-Kazyna group (step 5 of Route A).
Does Kazakhstani origin give an advantage in a tender?
Yes. Subsoil users conditionally reduce the price of a Kazakhstani producer of goods, works and services by 20 % when comparing bids, and if the KTP register lists two or more producers of a good, the tender is held among them only. In the Samruk-Kazyna group, the producer of the offered good has its price reduced by 5 % and does not have to provide bid security or performance security.
Who counts as a Kazakhstani producer of works and services?
An individual entrepreneur or a legal entity set up under the laws of Kazakhstan and located in Kazakhstan, at least 95 % of whose employees are citizens of Kazakhstan. Foreigners on intra-company transfer are left out of the count, but there may be no more than 50 % of them in each category of executives, managers and specialists (Subsoil Code, Art. 131).
What is in-country value?
The share of Kazakhstani content in a good, work or service, as a percentage; formerly called “local content”. In a subsoil user's tender you state your commitment to it for each lot, and the commitment cannot be below the minimum in the announcement (Rules No. 196, p. 36, 41, 65). It is calculated under the Unified Methodology (Order No. 260 of 20 April 2018).
Do I need to register on goszakup.gov.kz?
Only to sell to government bodies and state enterprises: they buy under Law No. 106‑VIII. Subsoil users buy through Tizilim, the Samruk-Kazyna group through zakup.sk.kz, and NCOC, TCO and KPO through their own systems.
More help on MunaiHub
Are you a service company or supplier?
List your company so procurement teams of Kazakhstan operators can find you by service, equipment and region.