Skip to content
Brent$117.6Gas TTF$1,192USD453.87 ₸
MunaiHub
Subsoil auction · 25 December 2026

The auction of 56 oil and gas blocks on 25 December 2026

Applications are open

12 days left to apply

Applications
until 18 November 2026 inclusive
Bidding
25 December 2026, 10:00–17:00 Astana time
Platform
e-qazyna.kz

The Ministry of Energy is auctioning hydrocarbon subsoil rights to 56 areas in eight regions: 52 for exploration and production and 4 fields for production. Everything from the notice is here: every block with its bonus, area and mandatory work, what it costs to take part, how to apply and how the bidding goes.

From the Ministry of Energy's notice (September 2026); tenge amounts at the 2026 MCI of 4,325 ₸. Checked on October 17, 2026.

areas: 52 for exploration and production, 4 for production
56
areas: 52 for exploration and production, 4 for production
total area of the blocks
78,129 km²
total area of the blocks
regions, from Mangystau to East Kazakhstan
8
regions, from Mangystau to East Kazakhstan
starting signature bonuses in total
2.09 billion ₸
starting signature bonuses in total
the least it takes to bid for one block
26.38 million ₸
the least it takes to bid for one block
estimate of the minimum exploration programmes: 16,100 line km of 2D and 56 wells
$141.5 million
estimate of the minimum exploration programmes: 16,100 line km of 2D and 56 wells

Dates: from the notice to the first well

The auction dates come from the notice; the later deadlines from the auction rules and the contract terms. The “now” mark shows where the auction stands today.

  1. September 2026

    Notice published

    The Ministry of Energy posted the notice on e-Qazyna; applications open for two months.

    now · November 6, 2026

  2. 18 November 2026

    Last day for applications

    Each application is reviewed within 10 working days; if something is wrong, the applicant has 3 working days to fix it.

  3. 25 December 2026, 10:00–17:00

    Bidding on e-Qazyna

    Bidders enter the auction room up to an hour before the start; a protocol records each block's result the same day.

  4. ≈ by late January 2027

    Bonus paid, contract signed

    Within 20 working days of the results the winner pays the signature bonus and submits the signed contract.

  5. Contract year 1

    Exploration project

    Prepare the exploration project — an obligation of the winners of the 52 exploration-and-production blocks.

  6. Within 3 years

    2D seismic

    Shoot the minimum 2D set for the block: 300 to 1,000 line km.

  7. Within 4 years

    At least one well

    Drill the wells the block's terms require — one or two.

  8. Up to 6 and 25 years

    Exploration, then production

    The exploration period is up to 6 years; the production period up to 25 years, including a preparatory period of up to 3 years.

All 56 blocks

Click a column heading to sort, or a region on the map to keep only its blocks. Tick blocks to see the sum you would have to pay to bid for all of them.

The figure is how many blocks touch the region; a block on a border counts in each.

Operations
Region

Showing 56 of 56

  • No. 1 · Mangystau

    Tyubedzhik (Karakum)
    Bonus
    118.92 million ₸
    To take part
    238.28 million ₸
    Area, km²
    58.95

    1 well(s) · $1 million

  • No. 2 · Aktobe

    Begimbet-1
    Bonus
    36.85 million ₸
    To take part
    74.13 million ₸
    Area, km²
    2,010.92

    2D reprocessing · 300 km 2D · 1 well(s) · $2 million

  • No. 3 · Kostanay, Ulytau

    West Ulytau
    Bonus
    43.21 million ₸
    To take part
    86.85 million ₸
    Area, km²
    2,278.86

    300 km 2D · 1 well(s) · $2 million

  • No. 4 · West Kazakhstan, Aktobe

    Sholaksay
    Bonus
    27.12 million ₸
    To take part
    54.67 million ₸
    Area, km²
    1,376.4

    300 km 2D · 1 well(s) · $2 million

  • No. 5 · Mangystau

    Baskumak
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    106.73

    1 well(s) · $2 million

  • No. 6 · Aktobe

    Shilisatay
    Bonus
    38.67 million ₸
    To take part
    77.76 million ₸
    Area, km²
    2,018.16

    300 km 2D · 1 well(s) · $2 million

  • No. 7 · Atyrau, Aktobe

    Karasu
    Bonus
    44.68 million ₸
    To take part
    89.79 million ₸
    Area, km²
    2,339.49

    300 km 2D · 1 well(s) · $3 million

  • No. 8 · Atyrau, West Kazakhstan

    Zhaskayrat
    Bonus
    36.68 million ₸
    To take part
    73.78 million ₸
    Area, km²
    1,922.5

    300 km 2D · 1 well(s) · $3 million

  • No. 9 · Mangystau

    Ustyurt-4
    Bonus
    71.67 million ₸
    To take part
    143.76 million ₸
    Area, km²
    4,058.53

    1,000 km 2D · 2 well(s) · $8.5 million

  • No. 10 · Mangystau

    Ustyurt-1
    Bonus
    33.26 million ₸
    To take part
    66.95 million ₸
    Area, km²
    1,862.09

    400 km 2D · 2 well(s) · $4 million

  • No. 11 · Mangystau

    Ustyurt-11
    Bonus
    19.07 million ₸
    To take part
    38.58 million ₸
    Area, km²
    1,068.61

    300 km 2D · 1 well(s) · $3 million

  • No. 12 · Mangystau

    Ustyurt-6
    Bonus
    44.03 million ₸
    To take part
    88.49 million ₸
    Area, km²
    2,533.02

    300 km 2D · 2 well(s) · $3 million

  • No. 13 · Mangystau

    Ustyurt-7
    Bonus
    42.73 million ₸
    To take part
    85.89 million ₸
    Area, km²
    2,378.58

    300 km 2D · 2 well(s) · $3 million

  • No. 14 · Mangystau

    Ustyurt-5
    Bonus
    29.63 million ₸
    To take part
    59.69 million ₸
    Area, km²
    1,691.2

    300 km 2D · 1 well(s) · $2 million

  • No. 15 · West Kazakhstan

    Kosaral
    Bonus
    61.46 million ₸
    To take part
    123.35 million ₸
    Area, km²
    3,161.9

    300 km 2D · 1 well(s) · $2 million

  • No. 16 · West Kazakhstan

    Maylykol
    Bonus
    62.58 million ₸
    To take part
    125.6 million ₸
    Area, km²
    3,220.9

    300 km 2D · 1 well(s) · $2 million

  • No. 17 · West Kazakhstan, Aktobe, Atyrau

    Karakamys
    Bonus
    54.24 million ₸
    To take part
    108.9 million ₸
    Area, km²
    2,814.31

    300 km 2D · 1 well(s) · $2 million

  • No. 18 · West Kazakhstan, Aktobe, Atyrau

    Karakol
    Bonus
    45.11 million ₸
    To take part
    90.65 million ₸
    Area, km²
    2,341.31

    300 km 2D · 1 well(s) · $2 million

  • No. 19 · Ulytau

    Saigachya
    Bonus
    24.65 million ₸
    To take part
    49.74 million ₸
    Area, km²
    1,334.77

    300 km 2D · 1 well(s) · $3 million

  • No. 20 · Mangystau

    North Kosbulak
    Bonus
    47.32 million ₸
    To take part
    95.06 million ₸
    Area, km²
    2,749.46

    300 km 2D · 1 well(s) · $2 million

  • No. 21 · Mangystau

    South Kosbulak
    Bonus
    39.92 million ₸
    To take part
    80.27 million ₸
    Area, km²
    2,341.02

    300 km 2D · 1 well(s) · $2 million

  • No. 22 · Aktobe

    Yuzhny (Aktobe)
    Bonus
    65.05 million ₸
    To take part
    130.53 million ₸
    Area, km²
    3,620.04

    300 km 2D · 1 well(s) · $2 million

  • No. 23 · Ulytau

    Syrlyzher
    Bonus
    34.47 million ₸
    To take part
    69.37 million ₸
    Area, km²
    1,857.67

    300 km 2D · 1 well(s) · $2 million

  • No. 24 · Mangystau

    Block E (West Munaibay)
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    540.37

    300 km 2D · 1 well(s) · $2 million

  • No. 25 · Mangystau

    Zhangurshi
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    154.84

    300 km 2D · 1 well(s) · $2 million

  • No. 26 · Atyrau

    Akshiy Production
    Bonus
    43.25 million ₸
    To take part
    43.68 million ₸
    Area, km²
    0.14

    — (production)

  • No. 27 · Atyrau

    Ashyksor
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    174.51

    300 km 2D · 1 well(s) · $2 million

  • No. 28 · Kyzylorda

    Zhosaly
    Bonus
    16.13 million ₸
    To take part
    32.7 million ₸
    Area, km²
    900.83

    300 km 2D · 1 well(s) · $3 million

  • No. 29 · Aktobe

    East Zharkamys II
    Bonus
    20.5 million ₸
    To take part
    41.43 million ₸
    Area, km²
    1,099.59

    300 km 2D · 1 well(s) · $3 million

  • No. 30 · Kyzylorda

    Telikol
    Bonus
    58.39 million ₸
    To take part
    117.21 million ₸
    Area, km²
    3,286.15

    300 km 2D · 1 well(s) · $3 million

  • No. 31 · West Kazakhstan

    South Karpovsky-1
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    248.27

    300 km 2D · 1 well(s) · $3 million

  • No. 32 · West Kazakhstan

    South Karpovsky-2
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    477.92

    300 km 2D · 1 well(s) · $3 million

  • No. 33 · West Kazakhstan

    South Karpovsky-3
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    221.67

    300 km 2D · 1 well(s) · $3 million

  • No. 34 · West Kazakhstan

    South Karpovsky-4
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    49.46

    300 km 2D · 1 well(s) · $3 million

  • No. 35 · Mangystau

    West Aksaz
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    553.3

    400 km 2D · 1 well(s) · $3 million

  • No. 36 · Mangystau

    East Aksaz
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    72.01

    300 km 2D · 1 well(s) · $3 million

  • No. 37 · Atyrau, Mangystau, Aktobe

    Aktumsyk
    Bonus
    37.97 million ₸
    To take part
    76.38 million ₸
    Area, km²
    2,080.74

    300 km 2D · 1 well(s) · $3 million

  • No. 38 · Mangystau

    Karzhau
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    10.83

    300 km 2D · 1 well(s) · $3 million

  • No. 39 · Mangystau

    Emir Production
    Bonus
    43.25 million ₸
    To take part
    43.68 million ₸
    Area, km²
    3.52

    — (production)

  • No. 40 · Mangystau

    Murynsor
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    405.41

    300 km 2D · 1 well(s) · $3 million

  • No. 41 · Atyrau

    Tobearal-1
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    92.07

    400 km 2D · 1 well(s) · $3 million

  • No. 42 · Ulytau

    East Kumkol Production
    Bonus
    65.79 million ₸
    To take part
    66.22 million ₸
    Area, km²
    15.15

    — (production)

  • No. 43 · Atyrau

    Liman
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    93.55

    300 km 2D · 1 well(s) · $3 million

  • No. 44 · Mangystau

    Alatobe
    Bonus
    26.9 million ₸
    To take part
    54.24 million ₸
    Area, km²
    1,519.03

    300 km 2D · 1 well(s) · $3 million

  • No. 45 · Kyzylorda

    North Bektas
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    51.96

    300 km 2D · 1 well(s) · $3 million

  • No. 46 · Aktobe

    Vostochny
    Bonus
    63.84 million ₸
    To take part
    128.11 million ₸
    Area, km²
    3,364.16

    300 km 2D · 1 well(s) · $3 million

  • No. 47 · East Kazakhstan

    Karabas
    Bonus
    75.38 million ₸
    To take part
    151.2 million ₸
    Area, km²
    4,045.47

    300 km 2D · 1 well(s) · $3 million

  • No. 48 · Mangystau

    Konyr
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    124.37

    300 km 2D · 1 well(s) · $3 million

  • No. 49 · Atyrau, Mangystau

    Akkuduk
    Bonus
    20.72 million ₸
    To take part
    41.87 million ₸
    Area, km²
    1,138.29

    300 km 2D · 1 well(s) · $3 million

  • No. 50 · Atyrau, Mangystau

    Yuzhny (Atyrau)
    Bonus
    61.33 million ₸
    To take part
    123.09 million ₸
    Area, km²
    3,386.55

    300 km 2D · 1 well(s) · $3 million

  • No. 51 · Mangystau

    Karazhanbas
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    252.01

    400 km 2D · 1 well(s) · $3 million

  • No. 52 · Mangystau

    Zhangurshi Production
    Bonus
    220.27 million ₸
    To take part
    220.71 million ₸
    Area, km²
    8.61

    — (production)

  • No. 53 · West Kazakhstan

    Kamysty
    Bonus
    49.69 million ₸
    To take part
    99.82 million ₸
    Area, km²
    2,931.71

    300 km 2D · 1 well(s) · $2 million

  • No. 54 · Aktobe

    Bulak
    Bonus
    17.78 million ₸
    To take part
    35.98 million ₸
    Area, km²
    981.17

    300 km 2D · 1 well(s) · $3 million

  • No. 55 · Aktobe

    Zhetykol
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    414.64

    300 km 2D · 1 well(s) · $3 million

  • No. 56 · Aktobe, Atyrau

    Tamdykol
    Bonus
    12.98 million ₸
    To take part
    26.38 million ₸
    Area, km²
    285.52

    300 km 2D · 1 well(s) · $2 million

Largest blocks

  1. 1.Ustyurt block 44,058.53 km²
  2. 2.Karabas block4,045.47 km²
  3. 3.Yuzhny block (Aktobe Region)3,620.04 km²
  4. 4.Yuzhny block (Atyrau Region)3,386.55 km²
  5. 5.Vostochny block3,364.16 km²

Highest starting bonuses

  1. 1.Zhangurshi field220.27 million ₸
  2. 2.Tyubedzhik (Karakum) block118.92 million ₸
  3. 3.Karabas block75.38 million ₸
  4. 4.Ustyurt block 471.67 million ₸
  5. 5.East Kumkol field65.79 million ₸

Four fields offered for production

These lots carry no exploration programme: the winner signs a production contract straight away, and the guarantee equals one starting bonus rather than two. Their starting bonuses are at least 10,000 MCI (43.25 million ₸), the Tax Code minimum for areas with approved reserves.

Blocks by region

Mangystau has the most blocks. The table counts every block once, under the first region the notice names, so the sums add up to the total.

RegionBlocksArea, km²Starting bonuses, totalLowest bonusHighest bonus
Mangystau Region2122,492853.74 million ₸12.98 million ₸220.27 million ₸
West Kazakhstan Region1016,844352.1 million ₸12.98 million ₸62.58 million ₸
Atyrau Region911,228283.55 million ₸12.98 million ₸61.33 million ₸
Aktobe Region813,794268.63 million ₸12.98 million ₸65.05 million ₸
Kyzylorda Region34,23987.49 million ₸12.98 million ₸58.39 million ₸
Ulytau Region33,208124.91 million ₸24.65 million ₸65.79 million ₸
East Kazakhstan Region14,04575.38 million ₸75.38 million ₸75.38 million ₸
Kostanay Region12,27943.21 million ₸43.21 million ₸43.21 million ₸
Total5678,1292.09 billion ₸12.98 million ₸220.27 million ₸

What it costs to take part

To apply for a block you pay the auction operator two amounts — separately for every block.

Participation fee — 100 MCI (432,500 ₸)

It is never refunded: the operator transfers it to the budget within 3 working days of the platform accepting the application.

Guarantee — two starting bonuses, or one

Twice the starting bonus for exploration-and-production blocks, once for production fields. It secures the winner's payment of the bonus.

Getting the guarantee back

Applicants who were not admitted and bidders below second place get it back within 3 working days of asking. The winner and the runner-up get theirs once the winner has met its obligations; on request the winner's guarantee goes towards the bonus. If the winner does not pay the bonus or sign the contract, its guarantee goes to the budget.

Where to pay

Both go to the electronic auction operator, Information and Accounting Centre JSC, as separate payments for each block. Take the bank details only from the notice on e-Qazyna: we deliberately do not reprint them, so that no money goes to forged details.

Example: a block with a starting bonus of 12,975,000 ₸ — guarantee 25,950,000 ₸ + participation fee 432,500 ₸ = 26,382,500 ₸. The winner then pays the final signature bonus — the one reached in the bidding — within 20 working days of the results.

How to apply

The procedure follows Arts. 95–97 of the Code on Subsoil and the hydrocarbon e-auction rules.

  1. 1

    Get a digital signature and an e-Qazyna account

    Applications are filed only electronically, through the operator's platform, and signed with an electronic digital signature.

    e-qazyna.kz
  2. 2

    Study the block

    Available geological information comes from the National Geological Service JSC and the unified subsoil-use platform. After winning, the subsoil user signs an agreement with the Geology Committee on confidentiality and on repaying the state's historical costs of studying the area.

  3. 3

    Pay both amounts for every block

    The participation fee and the guarantee — separate payments for every block, to the details in the notice.

  4. 4

    File the application by 18 November inclusive

    The application gives the applicant's details, those who control it or hold its shares (with a chart of the ownership structure) and proof that both amounts are paid. It comes with an undertaking to meet the terms of the notice and documents showing the applicant meets the Code's requirements. Documents are in Kazakh and Russian; a foreign applicant attaches notarised translations.

  5. 5

    Wait for admission

    The review takes 10 working days. If something is wrong, the applicant has 3 working days to fix it and file again, even after the deadline; the second review takes 5 working days. Admission is refused if the application is late, if in the last three years the state terminated a contract with the applicant or its group early, if there are unremedied breaches under another contract, if the applicant once won an auction and did not pay the bonus, or if the right would threaten national security.

  6. 6

    On the day

    Registration closes 5 minutes before the start, after which the application cannot be withdrawn. Bidders enter the auction room up to an hour before the start with their digital signature and the auction number the platform assigns.

How the bidding works

The highest signature bonus wins. The procedure is set by the hydrocarbon e-auction rules.

  • Before the start every bidder enters an offer of at least the starting bonus plus one step and at most five times the starting bonus.
  • Bidding opens at the highest of the offers; from then on any bidder can raise the current bid by one step.
  • If nobody raises within 10 minutes of the last raise, the block goes to whoever raised last. If nobody raises the opening bid within 10 minutes of the start, the auction for that block fails.
  • Bidding runs from 10:00 to 17:00 Astana time. If there is no winner by 17:00, the bidder who confirmed the last bid wins.
  • If fewer than two bidders are registered for a block on the day, its auction does not take place; if the only one is the applicant who initiated the auction, the contract is signed with it at the starting bonus.
  • A register the platform builds automatically and a protocol the same day record the results; the winner gets a copy of the protocol by email. Results can be checked, without bidders' personal data, on qazchain.kz.

Auction step

Current bonusStep
below 20,000 MCIbelow 86.5 million ₸25 %
20,000 MCI to 50,000 MCI86.5 million ₸ to 216.25 million ₸20 %
50,000 MCI to 100,000 MCI216.25 million ₸ to 432.5 million ₸15 %
100,000 MCI to 250,000 MCI432.5 million ₸ to 1.08 billion ₸10 %
250,000 MCI and above1.08 billion ₸ and above5 %

Every block's page gives the range of the opening offer and the step for its bonus.

Contract terms

The terms are the same for every block except the work volumes, which the notice sets block by block.

Contract periods

Exploration: up to 6 years. Production: up to 25 years, including a preparatory period of up to 3 years.

Exploration obligations

A project of exploration works within a year of the contract, the block's 2D seismic within three years and at least one well within four, where the block's terms require it.

Spending during production

1% of the previous year's production costs on training Kazakh staff; another 1% on research, scientific and design work in Kazakhstan; 1% of the contract investment on the region's social and economic development and its infrastructure.

Local content and staff

At least 70% in works, 70% in services and 30% in goods. Kazakh citizens must be at least 80% of managers and their deputies, 90% of heads of departments and 100% of specialists and skilled workers.

If the discovery is large

With initial geological reserves above 100 million tonnes of oil or 50 billion m³ of gas, the contract must carry one of three obligations: build or upgrade a processing plant, supply the output for processing in Kazakhstan, or carry out another investment or social project.

Special conditions

Take over the wells drilled on the block earlier and monitor them. On blocks in the Pre-Caspian basin the work goes down to −5,000 m.

Code on Subsoil and Subsoil Use, Arts. 19 and 94–102Hydrocarbon e-auction rules (Order No. 269)Tax Code: the signature bonus

After the auction

  1. 1Within 20 working days of the results the winner pays the final signature bonus and submits to the Ministry of Energy the contract signed on its side.
  2. 2A winner who misses the deadline loses the contract and the guarantee. Within 3 working days the contract is offered to the runner-up, who also gets 20 working days. If it does not sign either, the block goes back to auction.
  3. 3The Ministry of Energy registers the contract; the exploration period and the deadlines run from the date of registration.
  4. 4The results can be challenged in court within three months of publication if a breach of the rules affected the choice of the winner.

What follows year by year — projects, reviews and the authorities' deadlines — is on a Gantt chart: Field development stages

Questions

Who can take part?

Individuals and companies, foreign ones included, that applied on time and were admitted. Foreign applicants attach notarised translations of their documents into Kazakh and Russian.

Can I bid for several blocks?

Yes. Each block needs its own application, participation fee and guarantee. Tick the blocks in the table and the estimate adds up the sums.

How much money does it take to bid?

The guarantee plus the 432,500 ₸ participation fee. The least is 26,382,500 ₸ (blocks with a 3,000 MCI starting bonus), the most 238,279,188 ₸ (Tyubedzhik block).

Do I get the money back if I lose?

The guarantee, yes — within 3 working days of a refund request. The participation fee is not refunded.

What do “blocks” and “by contour” mean?

A block is a cell of the state grid one geographical minute on each side (Art. 19 of the Code); at these latitudes that is about 2.3–2.5 km². “By contour” means the area is drawn along the outline of a field or plot rather than made of blocks.

Why do four lots have no exploration programme?

They are fields offered for production: the winner signs a production contract, not an exploration-and-production one. Their guarantee equals one starting bonus.

What is the MCI and why are the amounts in tenge?

The MCI is the monthly calculation index. The Tax Code sets starting bonuses in MCI, and the notice converts them into tenge at the 2026 MCI of 4,325 ₸. The participation fee is 100 MCI.

Where do I get geological data?

From the National Geological Service JSC (contacts below) and the unified subsoil-use platform. The winner later repays the state's costs of studying the area under an agreement with the Geology Committee.

Where are the results published?

Each block's protocol appears on e-Qazyna on the day of the auction; the results can be checked on qazchain.kz. We will add them to this page once they are published.

What if a block's auction fails?

If fewer than two bidders are registered for a block on the day, or nobody raises the opening bid, its auction is declared failed; the notice of that appears on the unified subsoil-use platform within one working day.

Sources and contacts

MunaiHub is an independent industry portal, not the organiser or the operator of the auction. We carried the data over from the notice and checked the sums; where anything differs, the notice on e-Qazyna prevails.

The auction in our weekly digest