The auction of 56 oil and gas blocks on 25 December 2026
12 days left to apply
- Applications
- until 18 November 2026 inclusive
- Bidding
- 25 December 2026, 10:00–17:00 Astana time
- Platform
- e-qazyna.kz
The Ministry of Energy is auctioning hydrocarbon subsoil rights to 56 areas in eight regions: 52 for exploration and production and 4 fields for production. Everything from the notice is here: every block with its bonus, area and mandatory work, what it costs to take part, how to apply and how the bidding goes.
From the Ministry of Energy's notice (September 2026); tenge amounts at the 2026 MCI of 4,325 ₸. Checked on October 17, 2026.
12 days left to apply
- Applications
- until 18 November 2026 inclusive
- Bidding
- 25 December 2026, 10:00–17:00 Astana time
- Platform
- e-qazyna.kz
- areas: 52 for exploration and production, 4 for production
- 56
- areas: 52 for exploration and production, 4 for production
- total area of the blocks
- 78,129 km²
- total area of the blocks
- regions, from Mangystau to East Kazakhstan
- 8
- regions, from Mangystau to East Kazakhstan
- starting signature bonuses in total
- 2.09 billion ₸
- starting signature bonuses in total
- the least it takes to bid for one block
- 26.38 million ₸
- the least it takes to bid for one block
- estimate of the minimum exploration programmes: 16,100 line km of 2D and 56 wells
- $141.5 million
- estimate of the minimum exploration programmes: 16,100 line km of 2D and 56 wells
Dates: from the notice to the first well
The auction dates come from the notice; the later deadlines from the auction rules and the contract terms. The “now” mark shows where the auction stands today.
September 2026
Notice published
The Ministry of Energy posted the notice on e-Qazyna; applications open for two months.
now · November 6, 2026
18 November 2026
Last day for applications
Each application is reviewed within 10 working days; if something is wrong, the applicant has 3 working days to fix it.
25 December 2026, 10:00–17:00
Bidding on e-Qazyna
Bidders enter the auction room up to an hour before the start; a protocol records each block's result the same day.
≈ by late January 2027
Bonus paid, contract signed
Within 20 working days of the results the winner pays the signature bonus and submits the signed contract.
Contract year 1
Exploration project
Prepare the exploration project — an obligation of the winners of the 52 exploration-and-production blocks.
Within 3 years
2D seismic
Shoot the minimum 2D set for the block: 300 to 1,000 line km.
Within 4 years
At least one well
Drill the wells the block's terms require — one or two.
Up to 6 and 25 years
Exploration, then production
The exploration period is up to 6 years; the production period up to 25 years, including a preparatory period of up to 3 years.
All 56 blocks
Click a column heading to sort, or a region on the map to keep only its blocks. Tick blocks to see the sum you would have to pay to bid for all of them.
The figure is how many blocks touch the region; a block on a border counts in each.
Showing 56 of 56
No. 1 · Mangystau
Tyubedzhik (Karakum)- Bonus
- 118.92 million ₸
- To take part
- 238.28 million ₸
- Area, km²
- 58.95
1 well(s) · $1 million
No. 2 · Aktobe
Begimbet-1- Bonus
- 36.85 million ₸
- To take part
- 74.13 million ₸
- Area, km²
- 2,010.92
2D reprocessing · 300 km 2D · 1 well(s) · $2 million
No. 3 · Kostanay, Ulytau
West Ulytau- Bonus
- 43.21 million ₸
- To take part
- 86.85 million ₸
- Area, km²
- 2,278.86
300 km 2D · 1 well(s) · $2 million
No. 4 · West Kazakhstan, Aktobe
Sholaksay- Bonus
- 27.12 million ₸
- To take part
- 54.67 million ₸
- Area, km²
- 1,376.4
300 km 2D · 1 well(s) · $2 million
No. 5 · Mangystau
Baskumak- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 106.73
1 well(s) · $2 million
No. 6 · Aktobe
Shilisatay- Bonus
- 38.67 million ₸
- To take part
- 77.76 million ₸
- Area, km²
- 2,018.16
300 km 2D · 1 well(s) · $2 million
No. 7 · Atyrau, Aktobe
Karasu- Bonus
- 44.68 million ₸
- To take part
- 89.79 million ₸
- Area, km²
- 2,339.49
300 km 2D · 1 well(s) · $3 million
No. 8 · Atyrau, West Kazakhstan
Zhaskayrat- Bonus
- 36.68 million ₸
- To take part
- 73.78 million ₸
- Area, km²
- 1,922.5
300 km 2D · 1 well(s) · $3 million
No. 9 · Mangystau
Ustyurt-4- Bonus
- 71.67 million ₸
- To take part
- 143.76 million ₸
- Area, km²
- 4,058.53
1,000 km 2D · 2 well(s) · $8.5 million
No. 10 · Mangystau
Ustyurt-1- Bonus
- 33.26 million ₸
- To take part
- 66.95 million ₸
- Area, km²
- 1,862.09
400 km 2D · 2 well(s) · $4 million
No. 11 · Mangystau
Ustyurt-11- Bonus
- 19.07 million ₸
- To take part
- 38.58 million ₸
- Area, km²
- 1,068.61
300 km 2D · 1 well(s) · $3 million
No. 12 · Mangystau
Ustyurt-6- Bonus
- 44.03 million ₸
- To take part
- 88.49 million ₸
- Area, km²
- 2,533.02
300 km 2D · 2 well(s) · $3 million
No. 13 · Mangystau
Ustyurt-7- Bonus
- 42.73 million ₸
- To take part
- 85.89 million ₸
- Area, km²
- 2,378.58
300 km 2D · 2 well(s) · $3 million
No. 14 · Mangystau
Ustyurt-5- Bonus
- 29.63 million ₸
- To take part
- 59.69 million ₸
- Area, km²
- 1,691.2
300 km 2D · 1 well(s) · $2 million
No. 15 · West Kazakhstan
Kosaral- Bonus
- 61.46 million ₸
- To take part
- 123.35 million ₸
- Area, km²
- 3,161.9
300 km 2D · 1 well(s) · $2 million
No. 16 · West Kazakhstan
Maylykol- Bonus
- 62.58 million ₸
- To take part
- 125.6 million ₸
- Area, km²
- 3,220.9
300 km 2D · 1 well(s) · $2 million
No. 17 · West Kazakhstan, Aktobe, Atyrau
Karakamys- Bonus
- 54.24 million ₸
- To take part
- 108.9 million ₸
- Area, km²
- 2,814.31
300 km 2D · 1 well(s) · $2 million
No. 18 · West Kazakhstan, Aktobe, Atyrau
Karakol- Bonus
- 45.11 million ₸
- To take part
- 90.65 million ₸
- Area, km²
- 2,341.31
300 km 2D · 1 well(s) · $2 million
No. 19 · Ulytau
Saigachya- Bonus
- 24.65 million ₸
- To take part
- 49.74 million ₸
- Area, km²
- 1,334.77
300 km 2D · 1 well(s) · $3 million
No. 20 · Mangystau
North Kosbulak- Bonus
- 47.32 million ₸
- To take part
- 95.06 million ₸
- Area, km²
- 2,749.46
300 km 2D · 1 well(s) · $2 million
No. 21 · Mangystau
South Kosbulak- Bonus
- 39.92 million ₸
- To take part
- 80.27 million ₸
- Area, km²
- 2,341.02
300 km 2D · 1 well(s) · $2 million
No. 22 · Aktobe
Yuzhny (Aktobe)- Bonus
- 65.05 million ₸
- To take part
- 130.53 million ₸
- Area, km²
- 3,620.04
300 km 2D · 1 well(s) · $2 million
No. 23 · Ulytau
Syrlyzher- Bonus
- 34.47 million ₸
- To take part
- 69.37 million ₸
- Area, km²
- 1,857.67
300 km 2D · 1 well(s) · $2 million
No. 24 · Mangystau
Block E (West Munaibay)- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 540.37
300 km 2D · 1 well(s) · $2 million
No. 25 · Mangystau
Zhangurshi- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 154.84
300 km 2D · 1 well(s) · $2 million
- Bonus
- 43.25 million ₸
- To take part
- 43.68 million ₸
- Area, km²
- 0.14
— (production)
No. 27 · Atyrau
Ashyksor- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 174.51
300 km 2D · 1 well(s) · $2 million
No. 28 · Kyzylorda
Zhosaly- Bonus
- 16.13 million ₸
- To take part
- 32.7 million ₸
- Area, km²
- 900.83
300 km 2D · 1 well(s) · $3 million
No. 29 · Aktobe
East Zharkamys II- Bonus
- 20.5 million ₸
- To take part
- 41.43 million ₸
- Area, km²
- 1,099.59
300 km 2D · 1 well(s) · $3 million
No. 30 · Kyzylorda
Telikol- Bonus
- 58.39 million ₸
- To take part
- 117.21 million ₸
- Area, km²
- 3,286.15
300 km 2D · 1 well(s) · $3 million
No. 31 · West Kazakhstan
South Karpovsky-1- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 248.27
300 km 2D · 1 well(s) · $3 million
No. 32 · West Kazakhstan
South Karpovsky-2- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 477.92
300 km 2D · 1 well(s) · $3 million
No. 33 · West Kazakhstan
South Karpovsky-3- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 221.67
300 km 2D · 1 well(s) · $3 million
No. 34 · West Kazakhstan
South Karpovsky-4- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 49.46
300 km 2D · 1 well(s) · $3 million
No. 35 · Mangystau
West Aksaz- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 553.3
400 km 2D · 1 well(s) · $3 million
No. 36 · Mangystau
East Aksaz- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 72.01
300 km 2D · 1 well(s) · $3 million
No. 37 · Atyrau, Mangystau, Aktobe
Aktumsyk- Bonus
- 37.97 million ₸
- To take part
- 76.38 million ₸
- Area, km²
- 2,080.74
300 km 2D · 1 well(s) · $3 million
No. 38 · Mangystau
Karzhau- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 10.83
300 km 2D · 1 well(s) · $3 million
- Bonus
- 43.25 million ₸
- To take part
- 43.68 million ₸
- Area, km²
- 3.52
— (production)
No. 40 · Mangystau
Murynsor- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 405.41
300 km 2D · 1 well(s) · $3 million
No. 41 · Atyrau
Tobearal-1- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 92.07
400 km 2D · 1 well(s) · $3 million
- Bonus
- 65.79 million ₸
- To take part
- 66.22 million ₸
- Area, km²
- 15.15
— (production)
No. 43 · Atyrau
Liman- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 93.55
300 km 2D · 1 well(s) · $3 million
No. 44 · Mangystau
Alatobe- Bonus
- 26.9 million ₸
- To take part
- 54.24 million ₸
- Area, km²
- 1,519.03
300 km 2D · 1 well(s) · $3 million
No. 45 · Kyzylorda
North Bektas- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 51.96
300 km 2D · 1 well(s) · $3 million
No. 46 · Aktobe
Vostochny- Bonus
- 63.84 million ₸
- To take part
- 128.11 million ₸
- Area, km²
- 3,364.16
300 km 2D · 1 well(s) · $3 million
No. 47 · East Kazakhstan
Karabas- Bonus
- 75.38 million ₸
- To take part
- 151.2 million ₸
- Area, km²
- 4,045.47
300 km 2D · 1 well(s) · $3 million
No. 48 · Mangystau
Konyr- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 124.37
300 km 2D · 1 well(s) · $3 million
No. 49 · Atyrau, Mangystau
Akkuduk- Bonus
- 20.72 million ₸
- To take part
- 41.87 million ₸
- Area, km²
- 1,138.29
300 km 2D · 1 well(s) · $3 million
No. 50 · Atyrau, Mangystau
Yuzhny (Atyrau)- Bonus
- 61.33 million ₸
- To take part
- 123.09 million ₸
- Area, km²
- 3,386.55
300 km 2D · 1 well(s) · $3 million
No. 51 · Mangystau
Karazhanbas- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 252.01
400 km 2D · 1 well(s) · $3 million
- Bonus
- 220.27 million ₸
- To take part
- 220.71 million ₸
- Area, km²
- 8.61
— (production)
No. 53 · West Kazakhstan
Kamysty- Bonus
- 49.69 million ₸
- To take part
- 99.82 million ₸
- Area, km²
- 2,931.71
300 km 2D · 1 well(s) · $2 million
No. 54 · Aktobe
Bulak- Bonus
- 17.78 million ₸
- To take part
- 35.98 million ₸
- Area, km²
- 981.17
300 km 2D · 1 well(s) · $3 million
No. 55 · Aktobe
Zhetykol- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 414.64
300 km 2D · 1 well(s) · $3 million
No. 56 · Aktobe, Atyrau
Tamdykol- Bonus
- 12.98 million ₸
- To take part
- 26.38 million ₸
- Area, km²
- 285.52
300 km 2D · 1 well(s) · $2 million
Largest blocks
- 1.Ustyurt block 44,058.53 km²
- 2.Karabas block4,045.47 km²
- 3.Yuzhny block (Aktobe Region)3,620.04 km²
- 4.Yuzhny block (Atyrau Region)3,386.55 km²
- 5.Vostochny block3,364.16 km²
Highest starting bonuses
- 1.Zhangurshi field220.27 million ₸
- 2.Tyubedzhik (Karakum) block118.92 million ₸
- 3.Karabas block75.38 million ₸
- 4.Ustyurt block 471.67 million ₸
- 5.East Kumkol field65.79 million ₸
Cheapest to enter
19 blocks start at the minimum bonus of 3,000 MCI (12.98 million ₸). To bid for any of them you pay in 26,382,500 ₸.
Four fields offered for production
These lots carry no exploration programme: the winner signs a production contract straight away, and the guarantee equals one starting bonus rather than two. Their starting bonuses are at least 10,000 MCI (43.25 million ₸), the Tax Code minimum for areas with approved reserves.
Lot 52 of 56
Zhangurshi fieldMangystau Region
- Area
- 8.61 km²
- Depth
- to the base of the Neocomian
- Starting bonus
- 220.27 million ₸
- To take part
- 220.71 million ₸
Lot 42 of 56
East Kumkol fieldUlytau Region
- Area
- 15.15 km²
- Depth
- −2,000 m
- Starting bonus
- 65.79 million ₸
- To take part
- 66.22 million ₸
Lot 26 of 56
Akshiy fieldAtyrau Region
- Area
- 0.137 km²
- Depth
- —
- Starting bonus
- 43.25 million ₸
- To take part
- 43.68 million ₸
Lot 39 of 56
Emir fieldMangystau Region
- Area
- 3.52 km²
- Depth
- −3,100 m
- Starting bonus
- 43.25 million ₸
- To take part
- 43.68 million ₸
Blocks by region
Mangystau has the most blocks. The table counts every block once, under the first region the notice names, so the sums add up to the total.
| Region | Blocks | Area, km² | Starting bonuses, total | Lowest bonus | Highest bonus |
|---|---|---|---|---|---|
| Mangystau Region | 21 | 22,492 | 853.74 million ₸ | 12.98 million ₸ | 220.27 million ₸ |
| West Kazakhstan Region | 10 | 16,844 | 352.1 million ₸ | 12.98 million ₸ | 62.58 million ₸ |
| Atyrau Region | 9 | 11,228 | 283.55 million ₸ | 12.98 million ₸ | 61.33 million ₸ |
| Aktobe Region | 8 | 13,794 | 268.63 million ₸ | 12.98 million ₸ | 65.05 million ₸ |
| Kyzylorda Region | 3 | 4,239 | 87.49 million ₸ | 12.98 million ₸ | 58.39 million ₸ |
| Ulytau Region | 3 | 3,208 | 124.91 million ₸ | 24.65 million ₸ | 65.79 million ₸ |
| East Kazakhstan Region | 1 | 4,045 | 75.38 million ₸ | 75.38 million ₸ | 75.38 million ₸ |
| Kostanay Region | 1 | 2,279 | 43.21 million ₸ | 43.21 million ₸ | 43.21 million ₸ |
| Total | 56 | 78,129 | 2.09 billion ₸ | 12.98 million ₸ | 220.27 million ₸ |
What it costs to take part
To apply for a block you pay the auction operator two amounts — separately for every block.
Participation fee — 100 MCI (432,500 ₸)
It is never refunded: the operator transfers it to the budget within 3 working days of the platform accepting the application.
Guarantee — two starting bonuses, or one
Twice the starting bonus for exploration-and-production blocks, once for production fields. It secures the winner's payment of the bonus.
Getting the guarantee back
Applicants who were not admitted and bidders below second place get it back within 3 working days of asking. The winner and the runner-up get theirs once the winner has met its obligations; on request the winner's guarantee goes towards the bonus. If the winner does not pay the bonus or sign the contract, its guarantee goes to the budget.
Where to pay
Both go to the electronic auction operator, Information and Accounting Centre JSC, as separate payments for each block. Take the bank details only from the notice on e-Qazyna: we deliberately do not reprint them, so that no money goes to forged details.
Example: a block with a starting bonus of 12,975,000 ₸ — guarantee 25,950,000 ₸ + participation fee 432,500 ₸ = 26,382,500 ₸. The winner then pays the final signature bonus — the one reached in the bidding — within 20 working days of the results.
How to apply
The procedure follows Arts. 95–97 of the Code on Subsoil and the hydrocarbon e-auction rules.
- 1
Get a digital signature and an e-Qazyna account
Applications are filed only electronically, through the operator's platform, and signed with an electronic digital signature.
e-qazyna.kz - 2
Study the block
Available geological information comes from the National Geological Service JSC and the unified subsoil-use platform. After winning, the subsoil user signs an agreement with the Geology Committee on confidentiality and on repaying the state's historical costs of studying the area.
- 3
Pay both amounts for every block
The participation fee and the guarantee — separate payments for every block, to the details in the notice.
- 4
File the application by 18 November inclusive
The application gives the applicant's details, those who control it or hold its shares (with a chart of the ownership structure) and proof that both amounts are paid. It comes with an undertaking to meet the terms of the notice and documents showing the applicant meets the Code's requirements. Documents are in Kazakh and Russian; a foreign applicant attaches notarised translations.
- 5
Wait for admission
The review takes 10 working days. If something is wrong, the applicant has 3 working days to fix it and file again, even after the deadline; the second review takes 5 working days. Admission is refused if the application is late, if in the last three years the state terminated a contract with the applicant or its group early, if there are unremedied breaches under another contract, if the applicant once won an auction and did not pay the bonus, or if the right would threaten national security.
- 6
On the day
Registration closes 5 minutes before the start, after which the application cannot be withdrawn. Bidders enter the auction room up to an hour before the start with their digital signature and the auction number the platform assigns.
How the bidding works
The highest signature bonus wins. The procedure is set by the hydrocarbon e-auction rules.
- Before the start every bidder enters an offer of at least the starting bonus plus one step and at most five times the starting bonus.
- Bidding opens at the highest of the offers; from then on any bidder can raise the current bid by one step.
- If nobody raises within 10 minutes of the last raise, the block goes to whoever raised last. If nobody raises the opening bid within 10 minutes of the start, the auction for that block fails.
- Bidding runs from 10:00 to 17:00 Astana time. If there is no winner by 17:00, the bidder who confirmed the last bid wins.
- If fewer than two bidders are registered for a block on the day, its auction does not take place; if the only one is the applicant who initiated the auction, the contract is signed with it at the starting bonus.
- A register the platform builds automatically and a protocol the same day record the results; the winner gets a copy of the protocol by email. Results can be checked, without bidders' personal data, on qazchain.kz.
Auction step
| Current bonus | Step |
|---|---|
| below 20,000 MCIbelow 86.5 million ₸ | 25 % |
| 20,000 MCI to 50,000 MCI86.5 million ₸ to 216.25 million ₸ | 20 % |
| 50,000 MCI to 100,000 MCI216.25 million ₸ to 432.5 million ₸ | 15 % |
| 100,000 MCI to 250,000 MCI432.5 million ₸ to 1.08 billion ₸ | 10 % |
| 250,000 MCI and above1.08 billion ₸ and above | 5 % |
Every block's page gives the range of the opening offer and the step for its bonus.
Contract terms
The terms are the same for every block except the work volumes, which the notice sets block by block.
Contract periods
Exploration: up to 6 years. Production: up to 25 years, including a preparatory period of up to 3 years.
Exploration obligations
A project of exploration works within a year of the contract, the block's 2D seismic within three years and at least one well within four, where the block's terms require it.
Spending during production
1% of the previous year's production costs on training Kazakh staff; another 1% on research, scientific and design work in Kazakhstan; 1% of the contract investment on the region's social and economic development and its infrastructure.
Local content and staff
At least 70% in works, 70% in services and 30% in goods. Kazakh citizens must be at least 80% of managers and their deputies, 90% of heads of departments and 100% of specialists and skilled workers.
If the discovery is large
With initial geological reserves above 100 million tonnes of oil or 50 billion m³ of gas, the contract must carry one of three obligations: build or upgrade a processing plant, supply the output for processing in Kazakhstan, or carry out another investment or social project.
Special conditions
Take over the wells drilled on the block earlier and monitor them. On blocks in the Pre-Caspian basin the work goes down to −5,000 m.
Code on Subsoil and Subsoil Use, Arts. 19 and 94–102Hydrocarbon e-auction rules (Order No. 269)Tax Code: the signature bonus
After the auction
- 1Within 20 working days of the results the winner pays the final signature bonus and submits to the Ministry of Energy the contract signed on its side.
- 2A winner who misses the deadline loses the contract and the guarantee. Within 3 working days the contract is offered to the runner-up, who also gets 20 working days. If it does not sign either, the block goes back to auction.
- 3The Ministry of Energy registers the contract; the exploration period and the deadlines run from the date of registration.
- 4The results can be challenged in court within three months of publication if a breach of the rules affected the choice of the winner.
What follows year by year — projects, reviews and the authorities' deadlines — is on a Gantt chart: Field development stages
Questions
Who can take part?
Individuals and companies, foreign ones included, that applied on time and were admitted. Foreign applicants attach notarised translations of their documents into Kazakh and Russian.
Can I bid for several blocks?
Yes. Each block needs its own application, participation fee and guarantee. Tick the blocks in the table and the estimate adds up the sums.
How much money does it take to bid?
The guarantee plus the 432,500 ₸ participation fee. The least is 26,382,500 ₸ (blocks with a 3,000 MCI starting bonus), the most 238,279,188 ₸ (Tyubedzhik block).
Do I get the money back if I lose?
The guarantee, yes — within 3 working days of a refund request. The participation fee is not refunded.
What do “blocks” and “by contour” mean?
A block is a cell of the state grid one geographical minute on each side (Art. 19 of the Code); at these latitudes that is about 2.3–2.5 km². “By contour” means the area is drawn along the outline of a field or plot rather than made of blocks.
Why do four lots have no exploration programme?
They are fields offered for production: the winner signs a production contract, not an exploration-and-production one. Their guarantee equals one starting bonus.
What is the MCI and why are the amounts in tenge?
The MCI is the monthly calculation index. The Tax Code sets starting bonuses in MCI, and the notice converts them into tenge at the 2026 MCI of 4,325 ₸. The participation fee is 100 MCI.
Where do I get geological data?
From the National Geological Service JSC (contacts below) and the unified subsoil-use platform. The winner later repays the state's costs of studying the area under an agreement with the Geology Committee.
Where are the results published?
Each block's protocol appears on e-Qazyna on the day of the auction; the results can be checked on qazchain.kz. We will add them to this page once they are published.
What if a block's auction fails?
If fewer than two bidders are registered for a block on the day, or nobody raises the opening bid, its auction is declared failed; the notice of that appears on the unified subsoil-use platform within one working day.
Sources and contacts
Where the data come from
Whom to ask (as given in the notice)
Ministry of Energy — questions about the auction
National Geological Service JSC — geological information
32 A. Mambetov St., Astana
MunaiHub is an independent industry portal, not the organiser or the operator of the auction. We carried the data over from the notice and checked the sums; where anything differs, the notice on e-Qazyna prevails.
More on MunaiHub
- Field development stagesWhat comes after the contract: projects, reviews, permits and deadlines
- Economic modelA project's NPV and IRR with the bonus and the 2026 taxes
- Hydrocarbon auction rulesThe full procedure of bidding and results
- Code on SubsoilContracts, periods, local content
- Tax guideSignature bonus, MET, rent tax and the rest
- Oil & gas mapFields, pipelines and refineries near the blocks
- Oil & gas operatorsOperators of neighbouring fields and their contacts
- Design institutesWho can prepare the exploration project