- Logging measures physical quantities: natural radioactivity, electrical resistivity (how strongly the rock resists an electric current), density, hydrogen content and the speed of sound. We calculate porosity, shale volume and saturation from these quantities, using models that have been checked against core.
- We record a wireline log after an interval has been drilled, usually while the tool is pulled up. Logging while drilling (LWD) uses sensors in the drill string. It records earlier, before the mud filtrate (the liquid that leaks from the mud into the rock) has gone deep into the formation.
- Every tool has its own depth of investigation and its own vertical resolution. A tool shows a bed that is thinner than its resolution smoothed out: thicker and “paler” than it really is.
- Depth on a log is depth along the borehole. We match the records of different runs (separate recordings of the same interval), the LWD data and the core in depth, usually by the gamma ray curve, which is recorded in every run.
- We design the logging programme for the objectives of the well: the full suite of methods in the pay (productive) intervals of exploration wells, and a reduced suite in well-studied areas. Data that we do not acquire before the casing is run can hardly be made up later.
the reading in the middle of a bed of thickness , when the tool averages evenly over a window of length
sampling interval (the depth between two samples) of real-time LWD curves: in m/h, in bits, in bit/s
- Taking a porosity or saturation curve for a direct measurement: it is the result of a calculation that rests on assumptions.
- Reading a bed thinner than the vertical resolution from its extreme value, as if the tool saw only that bed.
- Comparing LWD and wireline logs without allowing for the hours or days between the recordings: in that time invasion (mud filtrate entering the rock) has changed the zone around the borehole.
- Not checking the depth match of the records: a shift of half a metre mixes the readings of neighbouring beds.
- Confusing measured depth (the length along the hole) with true vertical depth in a deviated well.
After this lesson you can
- explain what logging measures, and how we get from physical quantities to porosity, shale volume and saturation
- describe how wireline logging works: preparing the hole, running the tools in, recording on the way out, controlling depth, and the offsets of the sensors along the tool string (the tools joined into one assembly)
- compare wireline logging with logging while drilling (LWD) and choose a method for a vertical, deviated (slanted) and horizontal well
- explain depth of investigation (how far from the borehole a tool sees) and vertical resolution (the thinnest bed it shows correctly), and estimate how a tool will show a thin bed (a thin layer of rock)
- read a log: the tracks (the columns that hold the curves), the scales, the depth track, the heading and the repeat section
- justify a logging programme (the plan of what to record): which methods to record, and in which intervals, at different stages of drilling
What a log measures
A well is the only direct way to reach a formation that lies several kilometres deep. Core gives us the rock itself, but taking it is expensive and slow, and it is done in only a few intervals. Logging works differently. It measures only a few properties, but it measures them continuously, over the whole section and in almost every well.
A tool cannot see porosity or oil. It records physical quantities: how many gamma rays (a penetrating radiation) the rock gives off, how well it conducts electric current, how strongly it scatters the gamma rays of a source, how quickly it slows down neutrons, and how fast sound travels through it. Passive methods record what the rock gives off or produces by itself: natural radioactivity and its own electrical potentials (voltages). Active methods send current, sound, gamma rays or neutrons into the rock and measure the response.
To get from physical quantities to the properties of the formation, we use petrophysical models: relationships that are fitted to core data and checked against core. We convert density into porosity (Porosity), resistivity together with porosity into water saturation (Archie's equation and saturation of clean reservoirs), and radioactivity into shale volume (Determining shale volume). So the porosity and saturation curves on the final interpretation plots are the result of a calculation that rests on assumptions. They are not a direct measurement.
- Task
- Lithology (rock type), shale volume, bed boundaries
- Main methods
- gamma ray log (GR), spontaneous potential (SP), photoelectric factor
- What they measure
- natural radioactivity, electrochemical potentials, absorption of gamma rays
- Task
- Porosity
- Main methods
- density, neutron and sonic logs, nuclear magnetic resonance (NMR) logging
- What they measure
- density, hydrogen content, travel time of sound, the signal of hydrogen nuclei in the pores
- Task
- Saturation
- Main methods
- resistivity tools of different depths of investigation together with the porosity methods
- What they measure
- electrical resistivity
- Task
- Permeable intervals
- Main methods
- separation of the resistivity curves, microresistivity tools, mudcake (a layer of mud solids on the borehole wall) on the caliper log (a record of the hole diameter), SP
- What they measure
- signs that mud filtrate has entered the rock (invasion)
- Task
- Pressure and fluid samples
- Main methods
- wireline formation tester (tests the formation through the borehole wall)
- What they measure
- formation pressure, fluid mobility and composition
- Task
- Borehole and trajectory
- Main methods
- caliper log, directional survey (measures the slope and direction of the hole)
- What they measure
- borehole diameter, inclination (the angle from the vertical), azimuth (the compass direction)
| Task | Main methods | What they measure |
|---|---|---|
| Lithology (rock type), shale volume, bed boundaries | gamma ray log (GR), spontaneous potential (SP), photoelectric factor | natural radioactivity, electrochemical potentials, absorption of gamma rays |
| Porosity | density, neutron and sonic logs, nuclear magnetic resonance (NMR) logging | density, hydrogen content, travel time of sound, the signal of hydrogen nuclei in the pores |
| Saturation | resistivity tools of different depths of investigation together with the porosity methods | electrical resistivity |
| Permeable intervals | separation of the resistivity curves, microresistivity tools, mudcake (a layer of mud solids on the borehole wall) on the caliper log (a record of the hole diameter), SP | signs that mud filtrate has entered the rock (invasion) |
| Pressure and fluid samples | wireline formation tester (tests the formation through the borehole wall) | formation pressure, fluid mobility and composition |
| Borehole and trajectory | caliper log, directional survey (measures the slope and direction of the hole) | borehole diameter, inclination (the angle from the vertical), azimuth (the compass direction) |
The design of the tools is in the topic Overview of logging tools. How drilling changes the formation around the borehole, and which zone each sonde (the measuring part of a tool) sees, is in the topic Borehole environment: invaded zone and mudcake.
Wireline logging
In wireline logging, a service that is separate from the drilling rig makes the measurements. On land it uses a logging unit: a truck with a winch (a drum that winds the cable), the cable and a recording computer. On an offshore platform it uses a permanent module of the same kind. The tools go down the well on a logging cable. The cable has steel armour on the outside and insulated conductors inside. Power goes to the tool along the conductors, and data come back from the tool. The cable both holds the tool and carries the signals.
- 1Preparing the hole
After an interval has been drilled, the crew circulates the hole clean (pumps mud through it to carry out the cuttings), adjusts the mud properties and pulls the drill string out. The well stays full of mud, and the mud column is still the only thing that holds the formations back.
- 2Assembling the tools
To save rig time, the crew joins several tools into one tool string. A string can be up to 25–30 m long and is about 75–100 mm in diameter. Before running in and after pulling out, the crew checks the tools against reference standards (known values).
- 3Running in and recording
The crew lowers the string to the bottom and records the main log while pulling out. A taut cable gives depth more accurately, and the tool moves steadily. The logging speed is from 300 to 1800 m/h. Nuclear methods (those that count radiation) need more time than electrical ones to collect enough counts for a reliable reading.
- 4Quality control
The crew records a short interval twice. If the repeat section agrees with the main log, the readings are repeatable: the same tool gives the same answer. This is the simplest quality check. The calibrations, the repeat section and the mud parameters go into the heading and the end of the log.
- 5Further runs
The full suite does not fit into one tool string, so there are often several runs, that is, several trips into the hole. Logging a shallow well takes a few hours. The full suite in a deep exploration well takes two to three days.
A measuring wheel, which the cable passes over, measures the depth. The depth is checked against magnetic marks that were put on the cable at equal distances under a set tension. The cable stretches under the weight of the tool and its own weight. So in the well the marks are spaced wider than when they were put on, and the depth read from the marks is corrected for the stretch. The wheel already allows for this stretch, but it goes wrong when the cable tension changes after the wheel: when the tool sticks, when it moves in jerks, and when running in changes to pulling out (depth errors on wireline). We count depth along the hole from a zero mark, usually the rotary table (the turning table on the rig floor). The heading of the log states this mark.
The sensors sit metres apart along the tool string, so they pass the same point of the hole at different times. While recording, the system shifts the readings of each sensor by its depth offset, so that all the curves on the log refer to the same depth. The same offset brings a practical limit. A sensor that sits high in the string cannot reach the bottom of the hole. The deepest point it records is as far above the bottom as the sensor is above the bottom of the string.
- Bottom of the well (measured depth)
- 2950 m
- Base of the productive bed
- 2935 m
- Height of the GR sensor above the bottom of the tool string
- 21 m
- Height of the density sensor above the bottom of the tool string
- 6 m
- The deepest point a sensor can record is the bottom of the hole minus its height above the bottom of the string. GR: m; density sensor: m.
- The density log covers the whole bed. The GR does not record the interval from 2929 to 2935 m, that is, the lowest 6 m of the bed.
- For the GR to reach the base of the bed, the hole must be at least m deep. So we must drill the well 6 m deeper, or place the GR sensor lower in the tool string.
What it means. This is why we leave a rathole below a productive bed: extra hole depth into which the lower part of the tool string can go down. The highest-mounted sensor sets the length of the rathole, because it has to pass the whole bed. The same applies to LWD. The sensors sit metres or tens of metres above the bit, so they see the last metres of the hole only if drilling goes on. The data in this example are assumed for illustration.
Logging while drilling
In logging while drilling (LWD) the sensors are built into the drill collars (heavy, thick-walled pipes) above the bit. They measure the rock minutes or hours after the bit has cut it. The delay equals the distance from the bit to the sensor, divided by the rate of penetration (the drilling speed). The related system MWD (measurement while drilling) measures the trajectory of the well: the inclination and the azimuth, from accelerometers and magnetometers. It also measures drilling parameters: weight on bit, torque and vibration. Both systems usually work in the same assembly (Measurement while drilling).
Data reach the surface through mud-pulse telemetry. A valve in the assembly makes pressure pulses in the flow of mud, and a sensor on the standpipe (the vertical pipe that feeds mud to the drill string) decodes them. Such a link carries a few bits per second, and up to about twenty in the fastest systems. This is several orders of magnitude lower than over a logging cable (each order of magnitude is a factor of ten). So only the main curves go up in real time, and only at a coarse sampling interval. The full data are written into the tool memory and read out after the assembly has been pulled out. There are other channels too: an electromagnetic one, which does not need the mud to circulate, and wired drill pipe, which has a built-in cable and sends data thousands of times faster. But they are used less often.
- depth interval between samples transmitted in real time, m
- rate of penetration, m/h
- size of one data frame: all the transmitted curves of one sample, bit
- telemetry rate, bit/s
Units: in m/h, in bits, in bit/s, in m; 3600 is the number of seconds in an hour
- The whole channel carries the logging curves. In practice the directional survey and service data take part of it, and the interval is then larger.
- The rate of penetration and the telemetry rate are constant.
- We ignore data compression.
Drilling one metre takes seconds. In that time the channel can transmit bits, that is frames. The interval is one divided by the number of frames per metre. It grows with the rate of penetration and with the frame size, and it gets smaller as the channel rate grows. Data in the memory are recorded every seconds. Their interval is , and it does not depend on the communication channel.
- Mud-pulse telemetry rate
- 4 bit/s
- Data frame
- 8 curves × 12 bits = 96 bits
- Rate of penetration
- 30 m/h and 120 m/h
- Memory sampling interval
- 5 seconds
- Time to drill one metre: seconds and seconds.
- In that time the channel transmits and bits, that is 5 and 1.25 frames per metre.
- Real-time sampling interval: m at 30 m/h and m at 120 m/h.
- Sampling interval of the data in memory: m and m.
What it means. When drilling is fast, the real-time curves are coarser than the resolution of the sensors themselves. They are enough for steering the well and for quick operational decisions. But thin beds and exact boundaries show up only in the data from memory. That is why only the most necessary curves are sent in real time. In the pay interval the drilling speed is sometimes limited to protect the data quality. The data in this example are assumed for illustration.
The main advantages of LWD:
- The formation before invasion. The filtrate has not yet gone deep, the hole is not yet washed out (widened by erosion), and the measured resistivity is closer to the true resistivity of the formation (Borehole environment: invaded zone and mudcake).
- Steering the well (geosteering). We use the GR and the resistivity measured near the bit to keep a horizontal hole inside the bed.
- Difficult wells. LWD gives data in deviated and horizontal holes, where a wireline tool will not go down by itself.
- Insurance. If the hole runs into trouble and wireline logging becomes impossible, the data have already been recorded.
The limits come from the same conditions. LWD tools must withstand shock, vibration and rotation. So for a long time LWD offered fewer methods than wireline. Today it includes, besides the GR, the resistivity, density and neutron logs, and also shear-wave sonic logging, nuclear magnetic resonance logging, imagers (tools that make pictures of the borehole wall) and formation pressure measurement. But wireline still does the taking of sidewall cores (small rock samples cut from the borehole wall) and many special surveys. We measure LWD depth from the length of the drill string, not by the logging cable, so the two depth systems have to be matched.
- Feature
- Time of recording
- Wireline logging
- after the interval has been drilled, hours or days later
- LWD
- while drilling, minutes or hours after the formation is penetrated
- Feature
- State of the formation
- Wireline logging
- invasion has developed, washouts are possible
- LWD
- invasion is shallow, the hole is not yet washed out
- Feature
- Data transmission
- Wireline logging
- over the cable, fast and complete
- LWD
- in real time, only a few samples; the full data from memory after the tool is pulled out
- Feature
- Deviated and horizontal holes
- Wireline logging
- at inclinations above 60–70° the tool will not go down by itself: it has to be carried down on pipe or pulled by a tractor
- LWD
- works at any inclination; the data are used to steer the well
- Feature
- Range of methods
- Wireline logging
- the widest, including formation testing and sidewall cores
- LWD
- the main methods and many special ones, without sidewall cores
| Feature | Wireline logging | LWD |
|---|---|---|
| Time of recording | after the interval has been drilled, hours or days later | while drilling, minutes or hours after the formation is penetrated |
| State of the formation | invasion has developed, washouts are possible | invasion is shallow, the hole is not yet washed out |
| Data transmission | over the cable, fast and complete | in real time, only a few samples; the full data from memory after the tool is pulled out |
| Deviated and horizontal holes | at inclinations above 60–70° the tool will not go down by itself: it has to be carried down on pipe or pulled by a tractor | works at any inclination; the data are used to steer the well |
| Range of methods | the widest, including formation testing and sidewall cores | the main methods and many special ones, without sidewall cores |
The two methods do not rule each other out. In the pay interval both LWD and wireline logs are often recorded, and the difference between records made at different times itself points to permeable beds.
Depth of investigation and vertical resolution
A tool reading is not the value at a single point. It is an average over some volume of rock. Two characteristics describe the size of this volume. Depth of investigation is the distance from the borehole wall from which most of the signal comes. Vertical resolution is the smallest bed thickness that the tool shows with its true value.
The design of the tool sets both characteristics: the spacing between the source and the receiver (or between electrodes or coils), the size of the detectors, and how the current is focused. The larger the spacing, the deeper the tool sees, but the coarser its vertical resolution. That is why a suite includes sondes of different lengths. Short ones are for the zone near the borehole and for thin beds. Long ones are for the uninvaded formation (the rock that the filtrate has not reached).
- Method
- Microresistivity tools
- Vertical resolution
- 5–10 cm
- Depth of investigation
- the first few centimetres
- Method
- GR, density and neutron logs
- Vertical resolution
- 0.3–0.6 m
- Depth of investigation
- 10–30 cm
- Method
- Sonic log
- Vertical resolution
- about 0.6 m
- Depth of investigation
- from centimetres to tens of centimetres
- Method
- Laterolog, deep sonde
- Vertical resolution
- 0.6–1.2 m
- Depth of investigation
- of the order of a metre or more
- Method
- Induction log, deep sonde
- Vertical resolution
- 1–2 m
- Depth of investigation
- 1–2 m from the borehole axis
| Method | Vertical resolution | Depth of investigation |
|---|---|---|
| Microresistivity tools | 5–10 cm | the first few centimetres |
| GR, density and neutron logs | 0.3–0.6 m | 10–30 cm |
| Sonic log | about 0.6 m | from centimetres to tens of centimetres |
| Laterolog, deep sonde | 0.6–1.2 m | of the order of a metre or more |
| Induction log, deep sonde | 1–2 m | 1–2 m from the borehole axis |
These values are for tools of standard design. With modern multi-sonde tools, processing makes curves with different resolutions and different depths of investigation from the same measurements.
If a bed is thinner than the resolution, the tool sees the bed and the surrounding rocks at the same time, so the reading never reaches the true value. This is the shoulder-bed effect. A thin sand bed in shales looks more shaly on the log than it really is. A thin tight bed (a bed with very little pore space) in a porous sandstone looks more porous. The simplest model is that the tool averages the property evenly over a window of length , about equal to its resolution.
- tool reading in the middle of the bed, units of the method (for example, API)
- true value in the bed, same
- value in the enclosing rocks, same
- bed thickness, m
- length of the averaging window, about equal to the vertical resolution of the tool, m
Units: any units of the measured quantity, the same for all; and in metres
- The tool averages the property evenly over a window of length . The real response is smoother: the middle of the window counts for more than the edges.
- The bed lies between thick enclosing rocks that are identical.
- The quantity mixes linearly. This is reasonable for GR and density, but not for resistivity, where the mixing depends on the type of sonde.
- For the reading in the middle of the bed is .
The share of the window that the bed fills, , is the weight with which the tool sees a thin bed. The rest goes to the enclosing rocks. This gives a rule: we can read the value in a bed as it stands only if the bed is thicker than the vertical resolution of the tool.
A vertical gamma ray track from 0 to 150 API over a depth from 0 to 8 metres. The true GR is a series of steps: 120 API in shales and 30 API in three sand beds. The tool curve is smoothed: opposite the 0.3 m bed it falls only to 75 API, opposite the 0.6 m bed it touches 30 API at one point, opposite the 1.2 m bed it stays at 30 API over a 0.6 m stretch.
- GR of clean sandstone
- 30 API
- GR of the enclosing shales
- 120 API
- Thicknesses of the sand beds
- 0.3 m, 0.6 m and 1.2 m
- Averaging window of the tool
- 0.6 m
- 0.3 m bed: the share of sand in the window is , and the reading in the middle is API.
- 0.6 m bed: the thickness equals the window, and the tool shows the true 30 API at one point only, when the window coincides with the bed.
- 1.2 m bed: opposite the middle part of length m the reading equals the true value, 30 API.
- Gamma ray index (a measure of how shaly the rock looks: 0 for clean sand, 1 for shale) from the reading of the thin bed: . So clean sandstone looks half shaly.
What it means. A thin bed looks both more shaly and thicker on the log than it is. In the uniform-window model, the width of the anomaly (the bump on the curve) at half its height is not the thickness of the bed. It is the length of the window. The real response of a tool is smoother than a rectangular window, but the conclusion is the same: we cannot take values in beds thinner than the resolution as they stand. We refine them with high-resolution tools, from core, or by special processing. The data in this example are assumed for illustration.
The sampling interval is usually 15 cm, and down to a few millimetres for high-resolution tools. It must be several times smaller than the resolution. Otherwise a thin bed can slip between the samples. But more frequent sampling does not improve the resolution by itself. The physics of the tool sets the resolution, and frequent samples only describe the already smoothed curve in more detail.
How a log is laid out
We read a log from top to bottom, like a section of the well. The vertical axis is the depth along the hole. Across the page there are several tracks (columns), each with its own scale. In the classic format the depth track stands between the first and second tracks. On the left are the lithology curves (GR, SP, caliper). On the right are the resistivities on a logarithmic scale and the porosity methods.
Three tracks and a depth track from 2400 to 2460 metres. In the first track, the GR: about 105 API opposite shales and about 30 API opposite the two sand packages. In the second, the deep and shallow resistivity sondes on a logarithmic scale from 0.2 to 200 Ω·m. In the upper package the deep sonde reads about 32 Ω·m, higher than the shallow one (labelled “oil”). In the lower package it reads about 1 Ω·m, lower than the shallow one (labelled “water”). In the third, density and neutron porosity: in the sandstones the curves coincide, and in the shales the neutron porosity is clearly to the left of the density.
- 1Heading
Read the well name, the date, the bit size, the mud type, the resistivities of the mud, the mud filtrate and the mudcake (with the temperature at which they were measured), the maximum temperature, the recorded intervals and the scales. Without these data we cannot correct or interpret the curves.
- 2Borehole
Use the caliper log to see where the hole has its nominal (planned) diameter, where there are washouts (enlarged sections), and where there is mudcake opposite permeable beds.
- 3Lithology
Use the GR and SP to see where the shales are and where the clean beds (beds with little shale) are. Draw bed boundaries at the middle of the step where the curve moves from one level to another.
- 4Fluids and porosity
Use the resistivity to see where it is high and how the curves of different depths of investigation separate. Use the density and neutron porosity to find porosity, lithology and signs of gas.
- 5Quality
Look at the repeat section and the calibrations at the end of the log. Check whether the records agree, whether the calibrations are within tolerance (the allowed limits), and whether there are stretches where the tool stuck.
We choose the depth scale to suit the task: 1:500 for an overview and for correlation (1 cm of the log is 5 m of hole), and 1:200 for a detailed study of beds (1 cm is 2 m). In Russian-language practice, general surveys over the whole hole use 1:500, and detailed surveys in the prospective (possibly productive) intervals use 1:200. Resistivity is shown on a logarithmic scale (each step is ten times the last), because in one section it varies from tenths to thousands of ohm-metres.
Depth on a log is measured along the hole. In a deviated well, a bed looks thicker along the hole than it does vertically. So for maps and volume calculations we use the directional survey to convert the depths to true vertical depths and the thicknesses to vertical or true thicknesses. We match the records of different runs with each other by the GR curve, which every tool string includes. We shift both the LWD data and the core to fit its characteristic peaks.
Today we get logs in digital form (for example in the text format LAS, Log ASCII Standard) and plot them at any scale and with any set of tracks. But the logic of the classic format has survived. Recording, formats and the heading are covered in the topic Log acquisition, processing and presentation. The order of interpretation is covered in the topic Log interpretation workflow.
When and what is recorded: the logging programme
Wireline logging is usually done at the end of drilling each interval, before the next casing string (the next length of casing) is run, while the hole is still open. One recording of an interval by one tool is called a log run. Runs are numbered separately for each method, starting from its first recording in the well. The run number is given in the heading of the log. So the run numbers of different methods in one interval need not be the same. A difference only shows that one of the methods was not recorded in the upper intervals, which were drilled earlier.
The objectives of the well and the cost of its time decide which surveys to run. In pay intervals, and where drilling showed signs of oil and gas, we record more methods than in a part of the section that is clearly of no interest. In an exploration well we record the full suite even if the result is negative: every such well is expensive, and it is the only chance to study the section. In development wells (wells drilled to produce from a known field) of a well-studied field a reduced suite is usually enough, and some of the methods move to LWD.
- Interval
- Upper part of the section, for the surface casing (the first, shallow string)
- Objectives
- correlation, condition of the hole
- Methods
- GR, caliper, sometimes resistivity; often LWD only
- Interval
- Intermediate intervals
- Objectives
- correlation, estimate of pore pressure (the pressure of the fluid in the pores), tie to seismic (depth match with the seismic survey)
- Methods
- GR, resistivity, sonic, caliper, directional survey
- Interval
- Pay interval
- Objectives
- lithology, porosity, saturation, contacts, pressure, samples
- Methods
- GR (often spectral), SP, resistivity of different depths of investigation, microresistivity tools, density, neutron and sonic logs, NMR, formation tester, sidewall cores
- Interval
- After the casing is run
- Objectives
- quality of the cement behind the casing, depth control of perforation
- Methods
- cement bond log, GR and casing collar locator
| Interval | Objectives | Methods |
|---|---|---|
| Upper part of the section, for the surface casing (the first, shallow string) | correlation, condition of the hole | GR, caliper, sometimes resistivity; often LWD only |
| Intermediate intervals | correlation, estimate of pore pressure (the pressure of the fluid in the pores), tie to seismic (depth match with the seismic survey) | GR, resistivity, sonic, caliper, directional survey |
| Pay interval | lithology, porosity, saturation, contacts, pressure, samples | GR (often spectral), SP, resistivity of different depths of investigation, microresistivity tools, density, neutron and sonic logs, NMR, formation tester, sidewall cores |
| After the casing is run | quality of the cement behind the casing, depth control of perforation | cement bond log, GR and casing collar locator |
This example is assumed. The actual programme depends on the geological objectives, the casing programme and how thoroughly the area has to be studied.
Terms and symbols
- Log
- A record of rock properties against depth. The curves are placed in tracks, each with its own scale.
- Tool string
- Several tools joined together to record in one run. The sensors in it are mounted at different heights.
- Log run
- One recording of an interval of the hole by a given tool. Runs are numbered separately for each method.
- Repeat section
- A short interval recorded twice, to check that the readings can be repeated.
- Depth of investigation
- The distance from the borehole wall from which most of the signal of the tool comes.
- Vertical resolution
- The smallest bed thickness that the tool shows with its true value.
- LWD and MWD
- LWD is logging, and MWD is the measurement of the trajectory and of drilling parameters. Both use sensors in the drill string assembly.
- Rathole
- The part of the hole below the productive bed. It is needed so that all the sensors of the tool string can pass the whole bed.
Common mistakes and misconceptions
“Logging measures porosity and oil saturation.”
It measures physical quantities: radioactivity, resistivity, density, hydrogen content and the speed of sound. We calculate porosity and saturation from models, and their accuracy depends on the model parameters and on the calibration against core.
“If the samples are recorded more often, the tool will resolve thinner beds.”
The design of the tool sets the resolution. Frequent samples only describe the already smoothed curve in more detail: a bed thinner than the resolution will still look thicker and “paler” than it is.
“LWD and wireline logs in the same interval must agree.”
Hours or days pass between the recordings. In that time invasion develops and the hole washes out. The tools are also built differently. A difference between resistivity curves recorded at different times is not necessarily an error. Often it is a sign of a permeable bed.
“The bed thickness on the log is its true thickness.”
The log is plotted against depth along the hole. In a deviated well we recalculate the thickness to allow for the trajectory and the dip of the beds (the angle at which they slope). In thin beds we also allow for the resolution of the tool.
“We can save on logging: we will run the rest of the surveys later.”
Once the casing is run, most open-hole methods are unavailable or lose accuracy, and the zone near the borehole changes with time. Open-hole data can be obtained only once.
In depth: advanced detail
Depth: cable, drill string and depth matching
Each system has its own depth. The driller's depth is the length of the drill string that has been run in, counted pipe by pipe. Core, cuttings (rock chips brought up by the mud) and LWD data are tied to it. The logger's depth is the length of cable measured by the measuring wheel, checked against the magnetic marks and corrected for cable stretch. Pipe also gets longer under its own weight and from heating, and the stretch of the cable grows with depth and with the weight of the tool. So the two depths drift apart, by metres in deep wells.
For interpretation, we bring all the data to one reference depth, usually the depth of the main wireline log. We find the shift from characteristic peaks on the GR. This curve is recorded in every wireline tool string and in LWD, and we measure the natural radioactivity of the recovered core at the surface. Depth matching is especially important for core: without it, it is easy to assign laboratory data to the neighbouring bed.
The shift is not necessarily constant. The stretch of the cable and of the pipe grows with depth, and a tool can pass ledges in the hole in jerks. So we match depths at several tie points (reference peaks) across the whole interval, not at one.
How to get a tool into a deviated or horizontal hole
A tool on a cable goes down under its own weight as long as the component of its weight along the hole, , is greater than the friction force against the wall, . That is, it goes down as long as . Here is the inclination and is the friction coefficient. For the limiting angle in this simplest estimate is about 63–73°. In practice a tool usually stops going down at 60–70°. Then we use other ways to get the tool down the hole:
- On drill pipe. We run the tool string in on pipe and connect the cable to it in the well through a special connector.
- On coiled tubing (a long, flexible steel pipe unreeled from a drum) with the cable inside.
- With a downhole tractor. A wheeled or tracked drive pulls the tool along the horizontal hole.
- LWD. The sensors are in the drill string anyway; in horizontal wells this is the main method.
Every one of these options adds time and the risk of sticking. So in horizontal wells we usually build the programme around LWD, and keep wireline methods for the tasks that LWD does not solve.
Connections to other topics
- Borehole environment: invaded zone and mudcake — how drilling changes the formation around the borehole and which zone each sonde sees.
- Gamma ray log and natural gamma ray spectrometry — the most versatile method: lithology, shale volume and depth matching.
- Overview of logging tools — the design and purpose of the main logging sondes.
- Log acquisition, processing and presentation — recording and data formats, the log heading and scales.
- Log interpretation workflow — the order of interpretation: from depth matching to saturation.
- Measurement while drilling — how measurement-while-drilling systems are built.
- Archie's equation and saturation of clean reservoirs — how water saturation is calculated from resistivity and porosity.
- Core analysis — core as the standard for calibrating logs.
Check yourself
- 1
Why do we record the main wireline log while the tool is pulled up, and not while it is lowered?
- A.The mud-pulse telemetry channel requires it
- B.A taut cable gives depth more accurately, and the tool moves steadily
- C.On the way down the sensors are not yet ready to work
- D.The tool moves faster on the way up
Show the answer
Correct answer: B. A taut cable gives depth more accurately, and the tool moves steadily
On the way down the tool can slow at ledges, the cable sags, and the depth from the measuring wheel differs from the true depth. On the way up the cable is taut and the speed is constant, so the depth is easier to control and to correct for cable stretch.
- 2
A tool with a vertical resolution of about 0.6 m crosses a sand bed 0.3 m thick in shales (sand GR 25 API, shale 115 API). What will the log most likely show in the middle of the bed, and what follows from this?
Show the answer
In the uniform 0.6 m window model the tool sees half sand and half shale: API. A clean bed looks noticeably shaly and thicker than it is. We cannot take such values as they stand. We need high-resolution tools, core or special processing.
- 3
We need to log a horizontal section of the hole 1000 m long, and to correct the trajectory at once from the results. Which method is best?
- A.Logging while drilling (LWD)
- B.Logging through casing
- C.Wireline logging after drilling
- D.Core studies only
Show the answer
Correct answer: A. Logging while drilling (LWD)
LWD gives data in real time and works at any inclination: we use the GR and resistivity at the bit to keep the hole in the bed. A wireline tool will not go down into a horizontal hole by itself, and its data would appear only after drilling.
- 4
The sampling interval of a wireline tool has been reduced from 15 to 5 cm. How will its vertical resolution change?
- A.It will get worse
- B.It will hardly change: it is set by the design of the tool
- C.It will become equal to 5 cm
- D.It will improve three times
Show the answer
Correct answer: B. It will hardly change: it is set by the design of the tool
The physics of the tool sets the resolution: the spacing between the source and the receiver, the size of the detectors, the focusing. More frequent samples describe the same smoothed curve in more detail. They help only if the interval was coarser than the resolution.
- 5
Why is a gamma ray log included in every tool string, even if the task is porosity only?
Show the answer
The GR is a common “ruler” for all the records. We use its characteristic peaks to match in depth the curves of different runs, the LWD, the core and the data of neighbouring wells. It works in any mud and through casing, so we also use it later to tie in the perforations (set their depth).
- 6
The LWD resistivity curves and those of a wireline log recorded four days later coincide in shales but diverge noticeably in sandstone. What does this indicate?
Show the answer
In the time between the recordings, filtrate has gone into the permeable sandstone and the zone near the borehole has changed. In impermeable shales there is no invasion, and the curves coincide. The divergence indicates permeability, and the earlier LWD record is closer to the properties of the uninvaded formation.