| 720 | |
| C | |
| C1 | |
| C2 | |
| C3 | |
| Caband | |
| Ccompl | |
| cj | - unit price of the j-th material: a metre of casing, a bit, a tonne of cement, US$ thousand per unitDrilling time and cost
|
| ck | - direct cost of the event: materials, fishing (recovering stuck or lost tools), tools left in the hole, US$ thousandDrilling time and cost
|
| Clump | - lump-sum costs: the site, mobilisation, wellhead equipment, service operations paid per job, US$ thousandDrilling time and cost
|
| d | |
| D | |
| di | |
| Di | - diameter of the hole in the i-th interval. In open hole (the part with no casing), use the bit diameter, or the real diameter from the caliper log (a log that measures the hole diameter). In cased hole, use the inside diameter of the casing, mHow a well is drilled: the process and the people involved
|
| d, drod | |
| Eder | |
| E[ΔC] | |
| Fder | |
| Fdl | |
| Feq | |
| Ffl | |
| Frod | |
| Gf, gf, t | |
| H | |
| ΔCk | |
| Δtk | |
| K | |
| kdf | |
| L | |
| Li | |
| Lj | |
| Ljt, wcsg | |
| Lst | |
| M | |
| M, ω | - torque and angular speed of the top drive or rotary table (ω=2πnrot/60 at a rotary speed nrot rpm), kN·m, rad/sDrilling rig: power and hoisting systems
|
| n | |
| Naux | |
| Ndrum | |
| Nel | |
| Nhyd | |
| Nin, ηdw | |
| Nrot | |
| pk | |
| pmax | |
| p, Q | |
| Q | |
| r | |
| R | |
| T | |
| tbot | |
| Tcal | |
| Tcsg | |
| Tdrill | |
| tlag | |
| tn | |
| Tprod | |
| Trt | |
| Tshort | |
| t, V, Q | |
| Va | |
| Vann | |
| vmech | |
| Vstk | |
| Vstring | |
| vtech, vcom | |
| Vwell | - the value of the well's production: the NPV (net present value, the value today) of its future cash flows, leaving out the costs already spent and the cost of completion, US$ thousandDrilling time and cost
|
| v, vfl | |
| w | |
| W | |
| Wtrav | |
| W, n, η | |
| W, n, η, Fder | |
| W, Ffl, Fdl | |
| W, Ffl, η, n | |
| Zbit, Zann | |
| η | |
| η, n | |
| ηdrive | |
| ηmech | |
| ηmech, Ndrive | |
| ηv | |
| ω, nrot | |