The producing-time effect is a distortion of the pressure build-up curve (the rise in pressure after a well is shut in). It appears because the well produced for only a limited time, tpt_p, before it was shut in. After shut-in, the drawdown cone created during production (the region where the pressure has dropped) keeps spreading through the reservoir. So the pressure rise a time Δt\Delta t after shut-in is smaller than the pressure drop the same time after the start of production. The slope of the build-up curve also gets smaller with time, and the shorter the producing time was, the more it does so. The Agarwal equivalent time, Δte=tpΔt/(tp+Δt)\Delta t_e = t_p\Delta t/(t_p + \Delta t), converts the time after shut-in so that we can analyse the build-up as a drawdown curve after the start of production.

Why it matters

A short producing time before shut-in is common. In a drill stem test the main flow period lasts for hours, and the final build-up is one and a half times longer. A new well is often shut in for testing soon after completion. Some methods are designed for the drawdown curve: the Miller–Dyes–Hutchinson (MDH) method, type curves (ready-made curves that we match to the data) and the logarithmic derivative with respect to ln⁡Δt\ln\Delta t. On such a build-up they overestimate permeability and show false “constant-pressure boundaries” (boundaries where the pressure stays constant, for example an aquifer). This lesson shows how to recognise the producing-time effect and how to allow for it, with the Horner plot, equivalent time or the derivative with respect to equivalent time. It also shows when none of these techniques helps.

Quick refresher

  • A build-up is the sum of two responses: the continuing pressure drop from the “producing” well, and the rise from an imaginary injection well. So we subtract from the drawdown response the further drop that would have occurred over the time Δt\Delta t if the well had kept producing.
  • The pressure rise after shut-in cannot exceed pi−pwf(tp)p_i - p_{wf}(t_p). In radial flow, the slope of the build-up with respect to ln⁡Δt\ln\Delta t (the derivative Δp′\Delta p') equals me tp/(tp+Δt)m_e\,t_p/(t_p + \Delta t). This is 9% below the plateau at Δt=0.1 tp\Delta t = 0.1\,t_p, and half of the plateau at Δt=tp\Delta t = t_p.
  • The Horner function allows for the producing time exactly. The MDH method is valid only for Δt≪tp\Delta t \ll t_p.
  • Equivalent time Δte\Delta t_e turns a build-up into a drawdown: the pressure rise a time Δt\Delta t after shut-in equals the pressure drop a time Δte\Delta t_e after the start of production. Δte\Delta t_e is always smaller than tpt_p, so the build-up reproduces the drawdown only up to a time equal to the producing time.
  • The derivative with respect to ln⁡Δte\ln\Delta t_e (the same as the derivative with respect to the Horner function) equals the plateau mem_e in radial flow, for any producing time. We plot it both against Δte\Delta t_e and against the elapsed time Δt\Delta t.
  • The time conversion requires the flow to have reached the radial regime before shut-in. With a varying rate, with boundaries, or in gas wells, we need superposition of the whole rate history, and a model.
Key relationships
Δte=tp Δttp+Δt\Delta t_e = \dfrac{t_p\,\Delta t}{t_p + \Delta t}

equivalent time; tpt_p and Δt\Delta t in the same units

ΔpBU(Δt)=ΔpDD(Δte)\Delta p_{BU}(\Delta t) = \Delta p_{DD}(\Delta t_e)

build-up as drawdown: radial flow in an infinite reservoir

Δp′=me tptp+Δt\Delta p' = m_e\,\dfrac{t_p}{t_p + \Delta t}

the local slope of the build-up with respect to ln⁡Δt\ln\Delta t. This is what the MDH method and the derivative with respect to Δt\Delta t see

Δpe′=tp+Δttp Δp′=me\Delta p'_e = \dfrac{t_p + \Delta t}{t_p}\,\Delta p' = m_e

derivative with respect to equivalent time during radial flow

Δt=tp Ttp−T\Delta t = \dfrac{t_p\,T}{t_p - T}

how long to wait after shut-in for the equivalent time to reach TT

Common pitfalls
  • Mistaking the fall of the derivative at the end of a build-up after a short producing time for a constant-pressure boundary or for pressure support (fluid flowing in from outside).
  • Using the MDH method on a build-up longer than a tenth of the producing time.
  • Matching a build-up to drawdown type curves against Δt\Delta t instead of Δte\Delta t_e.
  • Taking the length of a short last flow period after a long production history as tpt_p. The time will be compressed too much.
  • Applying equivalent time when the flow had not reached the radial regime before shut-in.

After this lesson you can

  • use superposition (adding up the effects of separate rate changes) to explain why the pressure rise after a short producing time lags behind the pressure drop after the start of production and cannot exceed pi−pwf(tp)p_i - p_{wf}(t_p)
  • estimate how much the MDH method and the derivative with respect to ln⁡Δt\ln\Delta t underestimate the slope for a given ratio Δt/tp\Delta t/t_p, and choose between MDH, the Horner method and equivalent time
  • calculate the equivalent time and analyse a build-up as a drawdown: find the flow capacity, find the skin from the drawdown formula, and find the initial pressure on the straight line at Δte=tp\Delta t_e = t_p
  • calculate the derivative with respect to equivalent time from the readings, and find the flow capacity from its plateau (the flat part of the curve)
  • plan the flow and shut-in times so that the build-up reproduces the part of the drawdown that we need
  • state the conditions under which equivalent time does not apply, and what to do instead

Why a build-up “remembers” the producing time

The superposition principle gives a convenient picture of shut-in. The well appears to go on producing at the rate qq, while from the moment of shut-in an imaginary injection well with the same rate starts working at the same point (why the pressure builds up). So after shut-in two processes go on in the reservoir at once. At the well itself the pressure rises. But the drawdown cone created during production keeps spreading. Fluid flows towards the wellbore from ever more distant parts of the reservoir, and the pressure there goes on falling for some time. The shorter the producing time, the smaller the cone and the faster it fills in. There is almost nothing left to restore.

Let ΔpDD(t)=pi−pwf(t)\Delta p_{DD}(t) = p_i - p_{wf}(t) be the drop in bottomhole pressure a time tt after the start of production at a constant rate, from a reservoir with uniform pressure (the drawdown curve, DD). Let ΔpBU(Δt)\Delta p_{BU}(\Delta t) be the pressure rise a time Δt\Delta t after shut-in (the build-up, BU), that is, pws(Δt)−pwf(Δt=0)p_{ws}(\Delta t) - p_{wf}(\Delta t = 0). Superposition links them in a single line:

Build-up from the drawdown response
ΔpBU(Δt)=ΔpDD(Δt)−[ΔpDD(tp+Δt)−ΔpDD(tp)]\Delta p_{BU}(\Delta t) = \Delta p_{DD}(\Delta t) - \Big[\Delta p_{DD}(t_p + \Delta t) - \Delta p_{DD}(t_p)\Big]
where:
  • ΔpBU(Δt)\Delta p_{BU}(\Delta t)rise in bottomhole pressure a time Δt\Delta t after shut-in: pws(Δt)−pwf(Δt=0)p_{ws}(\Delta t) - p_{wf}(\Delta t = 0), Pa
  • ΔpDD(t)\Delta p_{DD}(t)drop in bottomhole pressure a time tt after the start of production at a constant rate qq from a reservoir at pressure pip_i: pi−pwf(t)p_i - p_{wf}(t), Pa
  • tpt_pproducing time at the rate qq before shut-in, s
  • Δt\Delta ttime after shut-in, s

Units: any consistent system of units

Holds when
  • The problem is linear: the fluid is single-phase and slightly compressible, and the reservoir and fluid properties do not depend on pressure.
  • Before the start of production the pressure in the reservoir is uniform, and before shut-in the surface rate was constant.
  • ΔpDD\Delta p_{DD} is the response of the same well, with the same skin and wellbore storage, shut in at the same point. Then the equality is exact, not approximate.

The square bracket is how much further the bottomhole pressure would have dropped over the time Δt\Delta t if the well had kept producing. While Δt≪tp\Delta t \ll t_p it is small: after a long producing time the pressure drop hardly grows over a short interval, and the build-up repeats the drawdown. When Δt\Delta t is comparable with tpt_p, the bracket is comparable with ΔpDD(Δt)\Delta p_{DD}(\Delta t) itself, and the recovery visibly lags behind the pressure drop after the start of production.

The second consequence is a limit. In an infinite reservoir the pressure returns to its initial value after a very long shut-in. So the pressure rise cannot exceed pi−pwf(tp)=ΔpDD(tp)p_i - p_{wf}(t_p) = \Delta p_{DD}(t_p), which is the drop accumulated during the producing time. The drawdown grows without limit, like the logarithm of time. The build-up, however, runs into a “ceiling”, and the shorter the producing time was, the lower the ceiling is. That is why a build-up after a short producing time flattens out earlier, and its logarithmic derivative falls.

Logarithmic derivative of the build-up with respect to ln Δt after different producing times, and the drawdown derivative0.010.11100.010.11Shut-in time Δt, hDerivative Δp′, MPa0.5 h2 h6 h24 htp:plateau meDrawdown

Log–log plot. Shut-in time runs from 0.01 to 30 hours, and the derivative from 0.003 to 1 MPa. All the curves start near 0.75 MPa, descend, and merge by 0.1 hours on a plateau of about 0.24 MPa. The dashed drawdown curve stays on the plateau to the end. The four solid curves turn downwards. The curve for half an hour of production turns after 0.05 hours and reaches 0.004 MPa by 30 hours. The curve for 2 hours turns after 0.2 hours. The curve for 6 hours (orange) turns after 0.6 hours and goes down to 0.04 MPa. The curve for 24 hours turns after 2 hours and goes down to 0.1 MPa. Each curve has a dot at a shut-in time equal to the producing time, at a level of about 0.12 MPa.

CalculatedCalculated logarithmic derivative of the build-up with respect to ln⁡Δt\ln\Delta t for the well of the lesson's examples, after production at the same rate for 0.5, 2, 6 and 24 h (solid lines; 6 h in orange), and the derivative of the drawdown (dashed). At the start all the curves are the same: the fall after wellbore storage, and then the plateau mem_e. Then the derivative of each build-up turns downwards, and the shorter the producing time, the earlier it does so. The dot on each curve marks the moment Δt=tp\Delta t = t_p, where the derivative is half the plateau.

Local slope: the MDH method and the Horner plot

We can see how fast the build-up lags from the logarithmic approximation. As long as both the flow period and the shut-in take place in radial flow in an infinite reservoir, ΔpDD(t)=me(ln⁡tD+0.809+2S)\Delta p_{DD}(t) = m_e(\ln t_D + 0.809 + 2S). Here tDt_D is the dimensionless time, and me=qBμ/(4πkh)m_e = qB\mu/(4\pi kh) is the slope of the semilog straight line per unit of natural logarithm. It is also the level of the plateau of the logarithmic derivative (derivative plateau). We put this into the formula of the previous section and differentiate with respect to ln⁡Δt\ln\Delta t:

Local slope of the build-up with respect to the logarithm of the shut-in time
Δp′= d ΔpBU dln⁡Δt=me tptp+Δt\Delta p' = \frac{\dd\,\Delta p_{BU}}{\dd\ln\Delta t} = m_e\,\frac{t_p}{t_p + \Delta t}
where:
  • Δp′\Delta p'logarithmic derivative of the build-up with respect to ln⁡Δt\ln\Delta t — the slope of the MDH plot per unit of natural logarithm, Pa
  • mem_elevel of the derivative plateau: qBμ/(4πkh)qB\mu/(4\pi kh), Pa
  • tp, Δtt_p,\ \Delta tproducing time and time after shut-in, s

Units: any consistent system of units

Holds when
  • Radial flow in an infinite reservoir at the times Δt\Delta t and tp+Δtt_p + \Delta t: wellbore storage is over and the boundaries have no effect.
  • The rate is constant before shut-in.

The factor tp/(tp+Δt)t_p/(t_p + \Delta t) depends neither on the reservoir nor on the well. It depends only on the ratio of the times. This is the producing-time effect on the slope. So on the MDH plot (pwsp_{ws} against lg⁡Δt\lg\Delta t) the points bend downwards from the straight line, and the derivative with respect to ln⁡Δt\ln\Delta t leaves the plateau, although the reservoir has no boundaries at all.

Local slope of the build-up with respect to ln⁡Δt\ln\Delta t as a fraction of the plateau in radial flow
Δt/tp\Delta t/t_p
0.01
tp/(tp+Δt)t_p/(t_p + \Delta t)
0.990
What it means
the MDH method is practically exact
Δt/tp\Delta t/t_p
0.05
tp/(tp+Δt)t_p/(t_p + \Delta t)
0.952
What it means
the slope is 5% lower
Δt/tp\Delta t/t_p
0.1
tp/(tp+Δt)t_p/(t_p + \Delta t)
0.909
What it means
9% lower
Δt/tp\Delta t/t_p
0.5
tp/(tp+Δt)t_p/(t_p + \Delta t)
0.667
What it means
a third lower
Δt/tp\Delta t/t_p
1
tp/(tp+Δt)t_p/(t_p + \Delta t)
0.500
What it means
half as large
Δt/tp\Delta t/t_p
1.5
tp/(tp+Δt)t_p/(t_p + \Delta t)
0.400
What it means
the typical end of a build-up in a drill stem test
Δt/tp\Delta t/t_p
3
tp/(tp+Δt)t_p/(t_p + \Delta t)
0.250
What it means
a quarter as large

This is the instantaneous slope at the moment Δt\Delta t. The slope of a chord (a straight line drawn between two points) across a section of the build-up is the average of this factor over the section (in logarithms of time). So it is distorted less than the slope at the right-hand end of the section.

The Horner equation (Horner equation and plot) has no such distortion. The function lg⁡[(tp+Δt)/Δt]\lg[(t_p + \Delta t)/\Delta t] contains the producing time, and in radial flow the points fall on a straight line with the slope m=2.303 mem = 2.303\,m_e for any tpt_p. The MDH method drops the term lg⁡[(tp+Δt)/tp]\lg[(t_p + \Delta t)/t_p], so it is valid only for Δt≪tp\Delta t \ll t_p. By the time Δt\Delta t, the points of the MDH plot lie below the continuation of the initial straight line by mlg⁡[(tp+Δt)/tp]m\lg[(t_p + \Delta t)/t_p].

Equivalent time

The build-up lags the drawdown because the time after shut-in “weighs” less. So we can look for a time at which the two coincide. We put the logarithmic approximation into all three terms of the superposition. Of the three constants 0.809+2S0.809 + 2S, two cancel. The logarithms of the times combine into the logarithm of a single fraction. What remains is the drawdown formula, only with a different time:

Equivalent time
ΔpBU(Δt)=ΔpDD(Δte),Δte=tp Δttp+Δt\Delta p_{BU}(\Delta t) = \Delta p_{DD}(\Delta t_e),\qquad \Delta t_e = \frac{t_p\,\Delta t}{t_p + \Delta t}
where:
  • Δte\Delta t_eequivalent time: the time after the start of production at which the pressure drop on the drawdown would equal the pressure rise on the build-up a time Δt\Delta t after shut-in, s
  • tp, Δtt_p,\ \Delta tproducing time and time after shut-in, s
  • ΔpBU, ΔpDD\Delta p_{BU},\ \Delta p_{DD}pressure rise after shut-in and pressure drop after the start of production, Pa

Units: any consistent system; Δte\Delta t_e is in the same units as tpt_p and Δt\Delta t

Holds when
  • Radial flow in an infinite reservoir at the times tpt_p and tp+Δtt_p + \Delta t: before shut-in the flow had reached the radial regime, and the disturbance had not reached the boundaries.
  • At the time Δt\Delta t the flow is also radial, or else Δt≪tp\Delta t \ll t_p. In that case Δte≈Δt\Delta t_e \approx \Delta t, and the equality holds during wellbore storage as well.
  • The rate is constant before shut-in.

We can analyse a build-up plotted against Δte\Delta t_e with all the tools of drawdown analysis (Pressure drawdown analysis): the semilog straight line, the drawdown skin formula and drawdown type curves. R. Agarwal published the technique in 1980. The Horner equation has long contained the same function of time, and equivalent time merely writes it as a time.

In other unit systems (1)
Through the Horner ratio (decimal logarithms)
lg⁡Δte=lg⁡tp−lg⁡tp+ΔtΔt\lg\Delta t_e = \lg t_p - \lg\frac{t_p + \Delta t}{\Delta t}

tpt_p and Δt\Delta t in the same units; Δte\Delta t_e in the same units.

There are no constants: a semilog plot against lg⁡Δte\lg\Delta t_e is the Horner plot mirrored left to right and shifted by lg⁡tp\lg t_p. A Horner ratio of 1 corresponds to Δte=tp\Delta t_e = t_p.

  • At the start of the build-up Δte≈Δt\Delta t_e \approx \Delta t: at Δt=0.1 tp\Delta t = 0.1\,t_p the equivalent time is 9% less than the elapsed time.
  • Δte\Delta t_e is always less than tpt_p. It tends to tpt_p as the shut-in becomes infinitely long. At Δt=tp\Delta t = t_p it equals tp/2t_p/2.
  • The point on the straight line at Δte=tp\Delta t_e = t_p corresponds to an infinitely long shut-in. This is where we read p∗p^*, which in a virgin reservoir equals the initial pressure.
  • The longer the shut-in, the more crowded the points on the Δte\Delta t_e axis. The last hours of the record are squeezed into fractions of an hour of equivalent time. The Horner axis squeezes the points in the same way.

A build-up plotted against Δte\Delta t_e is a drawdown. So we calculate the skin from the drawdown formula (skin from a drawdown), using the pressure rise on the straight line at Δte\Delta t_e = 1 h. The correction for the producing time, which we add to the Horner skin formula, is already included here by the time conversion itself:

Skin from the straight line against equivalent time
S=1.151[Δp1hm−lg⁡kϕ μ ct rw2+2.098]S = 1.151\left[\frac{\Delta p_{1\text{h}}}{m} - \lg\frac{k}{\phi\,\mu\,c_t\,r_w^2} + 2.098\right]
where:
  • Δp1h\Delta p_{1\text{h}}pressure rise on the straight line (or its continuation) at Δte\Delta t_e = 1 h, measured from pwf(Δt=0)p_{wf}(\Delta t = 0), MPa
  • mmslope of the straight line against lg⁡Δte\lg\Delta t_e per decimal cycle — the same as that of the Horner line, MPa
  • k, ϕ, μ, ct, rwk,\ \phi,\ \mu,\ c_t,\ r_wpermeability (from the slope), porosity, viscosity, total compressibility, wellbore radius, mD, —, mPa·s, 1/MPa, m

Units: metric oilfield units: pressure in MPa, kk in mD, μ\mu in mPa·s, ctc_t in 1/MPa, rwr_w in m, time in hours

Holds when
  • The conditions of equivalent time hold: before shut-in the flow had reached the radial regime.
  • We read Δp1h\Delta p_{1\text{h}} on the straight line, not from a measured point. If tpt_p is less than an hour, the point Δte\Delta t_e = 1 h lies on the continuation of the line beyond tpt_p.

The formula is the same as for a drawdown (Pressure drawdown analysis), with Δp1h\Delta p_{1\text{h}} in place of pi−p1hp_i - p_{1\text{h}}. It coincides with the Horner formula if we add the term lg⁡[(tp+1)/tp]\lg[(t_p + 1)/t_p] to the latter. Without that term, the Horner skin after a short producing time comes out too low.

In other unit systems (1)
Oilfield units
S=1.151[Δp1hm−lg⁡kϕ μ ct rw2+3.23]S = 1.151\left[\frac{\Delta p_{1\text{h}}}{m} - \lg\frac{k}{\phi\,\mu\,c_t\,r_w^2} + 3.23\right]

pressure and mm in psi, kk in mD, μ\mu in cP, ctc_t in 1/psi, rwr_w in ft, time in hours.

3.23=−lg⁡(2.637⋅10−4)−0.809/ln⁡103.23 = -\lg(2.637\cdot10^{-4}) - 0.809/\ln 10, as in the drawdown skin formula; in metric units 2.098=−lg⁡(3.553⋅10−3)−0.3512.098 = -\lg(3.553\cdot10^{-3}) - 0.351.

Final pressure build-up in a drill stem test (assumed data)
Δt\Delta t, h
0.01
Δte\Delta t_e, h
0.00998
pwsp_{ws}, MPa
21.4875
Δp\Delta p, MPa
2.6969
Δt\Delta t, h
0.02
Δte\Delta t_e, h
0.0199
pwsp_{ws}, MPa
21.8868
Δp\Delta p, MPa
3.0962
Δt\Delta t, h
0.05
Δte\Delta t_e, h
0.0496
pwsp_{ws}, MPa
22.1990
Δp\Delta p, MPa
3.4084
Δt\Delta t, h
0.1
Δte\Delta t_e, h
0.0984
pwsp_{ws}, MPa
22.3875
Δp\Delta p, MPa
3.5969
Δt\Delta t, h
0.2
Δte\Delta t_e, h
0.194
pwsp_{ws}, MPa
22.5617
Δp\Delta p, MPa
3.7711
Δt\Delta t, h
0.5
Δte\Delta t_e, h
0.462
pwsp_{ws}, MPa
22.7777
Δp\Delta p, MPa
3.9871
Δt\Delta t, h
1
Δte\Delta t_e, h
0.857
pwsp_{ws}, MPa
22.9291
Δp\Delta p, MPa
4.1385
Δt\Delta t, h
1.5
Δte\Delta t_e, h
1.20
pwsp_{ws}, MPa
23.0110
Δp\Delta p, MPa
4.2204
Δt\Delta t, h
2
Δte\Delta t_e, h
1.50
pwsp_{ws}, MPa
23.0651
Δp\Delta p, MPa
4.2745
Δt\Delta t, h
3
Δte\Delta t_e, h
2.00
pwsp_{ws}, MPa
23.1348
Δp\Delta p, MPa
4.3442
Δt\Delta t, h
4.5
Δte\Delta t_e, h
2.57
pwsp_{ws}, MPa
23.1956
Δp\Delta p, MPa
4.4050
Δt\Delta t, h
6
Δte\Delta t_e, h
3.00
pwsp_{ws}, MPa
23.2328
Δp\Delta p, MPa
4.4422
Δt\Delta t, h
9
Δte\Delta t_e, h
3.60
pwsp_{ws}, MPa
23.2768
Δp\Delta p, MPa
4.4862

The main flow period is tpt_p = 6 h at an oil rate of 64 m³/d. The bottomhole pressure at the moment the valve is closed is pwf(Δt=0)p_{wf}(\Delta t = 0) = 18.7906 MPa, and Δp=pws−pwf(Δt=0)\Delta p = p_{ws} - p_{wf}(\Delta t = 0). The data are calculated from a model of a homogeneous infinite reservoir with skin and wellbore storage below the valve at the packer, and rounded to 0.0001 MPa, which is the resolution of a quartz gauge.

Build-up pressures against shut-in time and against equivalent time0.111022.422.622.823.023.223.4Time, hPressure pws, MPavs Δtvs ΔteΔte = tp

Semilog plot. Time runs from 0.1 to 10 hours, and pressure from 22.3 to 23.5 MPa. The filled dots, which show the same pressures against equivalent time, lie on an orange dashed straight line. It rises from 22.4 MPa at 0.1 hours to 23.4 MPa at 6 hours. The end of the line is labelled: equivalent time equals producing time. The open circles, which show the pressures against elapsed time, almost coincide with the filled dots up to 1 hour. After 1–2 hours they move away to the right and below the line. The last circle, at 9 hours, is at 23.28 MPa.

CalculatedThe build-up pressures from the table, plotted twice on a semilog plot: against the shut-in time Δt\Delta t (open circles, the MDH plot) and against the equivalent time Δte\Delta t_e (filled dots). Against Δt\Delta t, the points bend downwards after 1–2 h. Against Δte\Delta t_e, they lie on the radial-flow straight line (dashed), which the example below draws through the readings at 1.5 and 6 h. Its continuation to Δte=tp\Delta t_e = t_p = 6 h gives the initial pressure.
Worked exampleThree ways to analyse one build-up
Given (assumed data)
Main flow period
qq = 64 m³/d of oil, tpt_p = 6 h; the final build-up lasts 9 h
Reservoir and fluid
BB = 1.21; μ\mu = 1.35 mPa·s; hh = 9 m; ϕ\phi = 0.18; ct=1.5⋅10−3c_t = 1.5\cdot10^{-3} MPa⁻¹; rwr_w = 0.108 m
Readings
the table above; we draw the line through the readings at 1.5 h (23.0110 MPa) and 6 h (23.2328 MPa), both after wellbore storage has ended
Solution
  1. The pressure difference is 23.2328−23.0110=0.221823.2328 - 23.0110 = 0.2218 MPa, and qBμ=64⋅1.21⋅1.35=104.544qB\mu = 64\cdot1.21\cdot1.35 = 104.544.
  2. MDH method: m=0.2218/lg⁡(6/1.5)=0.2218/0.60206=0.3684m = 0.2218/\lg(6/1.5) = 0.2218/0.60206 = 0.3684 MPa per cycle, and k=2.149⋅104.544/(0.3684⋅9)=67.8k = 2.149\cdot104.544/(0.3684\cdot9) = 67.8 mD.
  3. Horner method: the horizontal coordinates are lg⁡(7.5/1.5)=0.69897\lg(7.5/1.5) = 0.69897 and lg⁡(12/6)=0.30103\lg(12/6) = 0.30103. Then m=0.2218/(0.69897−0.30103)=0.5574m = 0.2218/(0.69897 - 0.30103) = 0.5574 MPa per cycle, and k=2.149⋅104.544/(0.5574⋅9)=44.8k = 2.149\cdot104.544/(0.5574\cdot9) = 44.8 mD.
  4. Equivalent time: Δte=6⋅1.5/7.5=1.2\Delta t_e = 6\cdot1.5/7.5 = 1.2 h and 6⋅6/12=36\cdot6/12 = 3 h. Then m=0.2218/lg⁡(3/1.2)=0.2218/0.39794=0.5574m = 0.2218/\lg(3/1.2) = 0.2218/0.39794 = 0.5574 MPa. This is the same slope as the Horner one, because lg⁡2.5=lg⁡5−lg⁡2\lg 2.5 = \lg 5 - \lg 2.
  5. Skin from the drawdown formula. The pressure rise at the 1.5 h reading (Δte\Delta t_e = 1.2 h) is 23.0110−18.7906=4.220423.0110 - 18.7906 = 4.2204 MPa. On the straight line at Δte\Delta t_e = 1 h it is Δp1h=4.2204−0.5574⋅lg⁡1.2=4.2204−0.5574⋅0.07918=4.1763\Delta p_{1\text{h}} = 4.2204 - 0.5574\cdot\lg 1.2 = 4.2204 - 0.5574\cdot0.07918 = 4.1763 MPa. Next, lg⁡kϕμctrw2=lg⁡44.80.18⋅1.35⋅1.5⋅10−3⋅0.1082=7.0227\lg\dfrac{k}{\phi\mu c_tr_w^2} = \lg\dfrac{44.8}{0.18\cdot1.35\cdot1.5\cdot10^{-3}\cdot0.108^2} = 7.0227. So S=1.151 (4.1763/0.5574−7.0227+2.098)=2.96S = 1.151\,(4.1763/0.5574 - 7.0227 + 2.098) = 2.96.
  6. We read the initial pressure on the straight line at Δte=tp\Delta t_e = t_p = 6 h. The pressure rise at the 6 h reading (Δte\Delta t_e = 3 h) is 23.2328−18.7906=4.442223.2328 - 18.7906 = 4.4422 MPa. On the line at 6 h it is 4.4422+0.5574⋅lg⁡(6/3)=4.61004.4422 + 0.5574\cdot\lg(6/3) = 4.6100 MPa. So pi=18.7906+4.6100=23.4006p_i = 18.7906 + 4.6100 = 23.4006 MPa.
Answer: By the Horner method and by equivalent time, k≈44.8k \approx 44.8 mD, the skin is 2.96 and pi≈23.40p_i \approx 23.40 MPa. The MDH method overestimated the permeability: it gave 67.8 mD, which is 51% too high.

What it means. The data were calculated from a model with a permeability of 45 mD, a skin of 3 and an initial pressure of 23.4 MPa. Horner and equivalent time recovered these values with an error of under 1% in permeability and 0.04 in skin. This small error comes from wellbore storage that had not quite finished by the 1.5 h reading, together with the rounding of the readings. MDH went wrong not because of the data. By 6 h the local slope with respect to lg⁡Δt\lg\Delta t is only 6/(6+6)=0.56/(6 + 6) = 0.5 of the full one, and the chord through 1.5 and 6 h is 1.5 times flatter than the straight line. The skin from the drawdown formula at Δte\Delta t_e = 1 h is the same as the skin from the Horner formula with the correction lg⁡[(tp+1)/tp]\lg[(t_p + 1)/t_p]. Without the correction, the Horner formula would have given a skin lower by 0.08. The data in this example are assumed for illustration.

Derivative with respect to equivalent time

For the diagnostic plot of a build-up after a short producing time, we take the derivative not with respect to ln⁡Δt\ln\Delta t but with respect to ln⁡Δte\ln\Delta t_e. Since ln⁡Δte=ln⁡tp−ln⁡[(tp+Δt)/Δt]\ln\Delta t_e = \ln t_p - \ln[(t_p + \Delta t)/\Delta t], this is the same derivative as the one with respect to the Horner function, that is, with respect to the superposition time function for a single rate. We get it from the ordinary derivative by multiplication:

Derivative with respect to equivalent time
Δpe′= d ΔpBU dln⁡Δte=tp+Δttp⋅ d ΔpBU dln⁡Δt\Delta p'_e = \frac{\dd\,\Delta p_{BU}}{\dd\ln\Delta t_e} = \frac{t_p + \Delta t}{t_p}\cdot\frac{\dd\,\Delta p_{BU}}{\dd\ln\Delta t}
where:
  • Δpe′\Delta p'_elogarithmic derivative of the build-up with respect to equivalent time, Pa
  •  d ΔpBU/ dln⁡Δt\dd\,\Delta p_{BU}/\dd\ln\Delta tordinary logarithmic derivative of the build-up with respect to the time after shut-in, Δp′\Delta p', Pa
  • tp, Δtt_p,\ \Delta tproducing time and time after shut-in, s

Units: any consistent system; the derivatives are in units of pressure

Holds when
  • tpt_p is the producing time at a constant rate before shut-in. With a varying rate, we take the derivative with respect to the superposition function of the whole history (Equivalent producing time and synthetic flowing time).
  • The logarithm is natural. The relation follows from  dln⁡Δte/ dln⁡Δt=tp/(tp+Δt)\dd\ln\Delta t_e/\dd\ln\Delta t = t_p/(t_p + \Delta t).

The factor (tp+Δt)/tp(t_p + \Delta t)/t_p exactly cancels the factor tp/(tp+Δt)t_p/(t_p + \Delta t) of the local slope. So in radial flow, Δpe′=me\Delta p'_e = m_e for any producing time. While Δt≪tp\Delta t \ll t_p, the two derivatives coincide. At the end of a long build-up, the derivative with respect to equivalent time is larger than the ordinary one, by the same factor by which tp+Δtt_p + \Delta t is larger than tpt_p. For the same neighbouring readings, the noise is amplified by the same factor.

We can plot it in two ways. We can plot both ΔpBU\Delta p_{BU} and Δpe′\Delta p'_e against Δte\Delta t_e, as Agarwal proposed for the pressure. The build-up can then be overlaid on drawdown type curves. Interpretation software usually plots them against the elapsed time Δt\Delta t. Then the late part of the record is not squeezed towards tpt_p, and radial flow is still seen as a plateau. The values of the derivative are the same in both cases. Only the time axis differs.

We calculate it from the readings with the same three-point formula as the ordinary derivative (how the derivative is calculated from readings), with ln⁡Δte\ln\Delta t_e in place of ln⁡Δt\ln\Delta t. We also measure the differentiation interval in ln⁡Δte\ln\Delta t_e. At the end of the record the readings crowd together on this axis, so for the same interval the neighbouring points are ever further apart in elapsed time.

Diagnostic plot of the example build-up: pressure rise and two derivatives0.010.11100.1110Shut-in time Δt, hΔp and Δp′, MPaΔpper ln Δteper ln Δtplateau me = 0.241 MPa

Log–log plot. Shut-in time runs from 0.01 to 10 hours, and pressure and derivative from 0.05 to 10 MPa. The dots of the pressure rise climb slowly from 2.7 to 4.5 MPa. Both derivatives start near 0.75 MPa and descend to the plateau of 0.241 MPa, shown by a dashed line. The orange derivative, with respect to equivalent time, stays on the plateau up to 9 hours. The grey derivative, with respect to elapsed time, turns downwards after 0.5 hours and falls to 0.1 MPa by 9 hours.

CalculatedDiagnostic plot of the build-up in the table. It shows the pressure rise (dots) and two derivatives, calculated from the lesson's model and plotted against the elapsed time Δt\Delta t: the derivative with respect to ln⁡Δt\ln\Delta t (grey) and the derivative with respect to ln⁡Δte\ln\Delta t_e (orange). The dashed line is the plateau mem_e. After 0.5 h the grey derivative turns downwards, while the orange one stays on the plateau to the end of the record.
Worked exampleDerivative from readings: with respect to Δt and to Δt_e
Given (assumed data)
Readings
from the table: pressure rise 4.2204 MPa at 1.5 h, 4.3442 MPa at 3 h, 4.4422 MPa at 6 h, 4.4862 MPa at 9 h
Test
tpt_p = 6 h; qBμqB\mu = 104.544; hh = 9 m
Solution
  1. First, with respect to ln⁡Δt\ln\Delta t at the 3 h point. The neighbours at 1.5 and 6 h are each ln⁡2=0.6931\ln 2 = 0.6931 away from it, so the derivative is a central difference (the difference between the two neighbours, divided by the distance between them): Δp′=(4.4422−4.2204)/(2⋅0.6931)=0.1600\Delta p' = (4.4422 - 4.2204)/(2\cdot0.6931) = 0.1600 MPa.
  2. Now with respect to ln⁡Δte\ln\Delta t_e. The equivalent times of the same readings are 1.2, 2 and 3 h. The distances are ln⁡(2/1.2)=0.5108\ln(2/1.2) = 0.5108 and ln⁡(3/2)=0.4055\ln(3/2) = 0.4055. The chord slopes are sl=(4.3442−4.2204)/0.5108=0.2424s_l = (4.3442 - 4.2204)/0.5108 = 0.2424 MPa and sr=(4.4422−4.3442)/0.4055=0.2417s_r = (4.4422 - 4.3442)/0.4055 = 0.2417 MPa.
  3. The weighted average of the chord slopes is Δpe′=(0.2424⋅0.4055+0.2417⋅0.5108)/(0.5108+0.4055)=0.2420\Delta p'_e = (0.2424\cdot0.4055 + 0.2417\cdot0.5108)/(0.5108 + 0.4055) = 0.2420 MPa. As a check with the factor, 0.1600⋅(6+3)/6=0.24000.1600\cdot(6 + 3)/6 = 0.2400 MPa.
  4. At the 6 h point (neighbours at 3 and 9 h) the same formula gives Δp′=0.1206\Delta p' = 0.1206 MPa with respect to ln⁡Δt\ln\Delta t and Δpe′=0.2414\Delta p'_e = 0.2414 MPa with respect to ln⁡Δte\ln\Delta t_e.
  5. The flow capacity from the derivative with respect to equivalent time is kh=0.933⋅104.544/0.2420=403kh = 0.933\cdot104.544/0.2420 = 403 mD·m, so k=44.8k = 44.8 mD. The derivative with respect to ln⁡Δt\ln\Delta t at the same point would have given 610 mD·m, which is 1.5 times higher.
Answer: The derivative with respect to ln⁡Δt\ln\Delta t falls: 0.1600 MPa at 3 h and 0.1206 MPa at 6 h. The derivative with respect to ln⁡Δte\ln\Delta t_e sits on the plateau: 0.2420 and 0.2414 MPa. From it, k≈44.8k \approx 44.8 mD.

What it means. The fall of the derivative with respect to ln⁡Δt\ln\Delta t is exactly the factor tp/(tp+Δt)t_p/(t_p + \Delta t): 6/9 = 0.67 at 3 h and 6/12 = 0.5 at 6 h. There is no boundary in the reservoir, and the derivative with respect to equivalent time shows this. It is slightly above the plateau of the model (0.2409 MPa), because of the tail of wellbore storage and the rounding of the readings. If the fall had remained on the derivative with respect to Δte\Delta t_e as well, we would need to look for its cause in the reservoir. The data in this example are assumed for illustration.

Type curves, time compression and planning the flow period

Type curves for a well with wellbore storage and skin (Type-curve matching) are calculated for the start of production at a constant rate. For a build-up we would have to construct a separate family of curves for each dimensionless producing time tpD=ktp/(ϕμctrw2)t_{pD} = kt_p/(\phi\mu c_tr_w^2). We would also need to know the permeability before matching, to choose the right family. Equivalent time removes this problem. We plot the pressure rise and the derivative Δpe′\Delta p'_e against Δte\Delta t_e and match them to the same curves as a drawdown. The pressure match gives khkh, and the time match gives the wellbore storage coefficient CC (we use Δte\Delta t_e in the formula instead of Δt\Delta t). The curve parameter gives the skin.

The price is time compression. The Δte\Delta t_e axis ends at tpt_p. However long the shut-in lasts, the build-up reproduces the drawdown only up to a time equal to the producing time, and the late hours of the record are squeezed towards this limit. In the lesson's example, 9 h of build-up gave an equivalent time of only 3.6 h. This gives a simple planning rule: for the build-up to show an equivalent time TT, the shut-in must last

Shut-in duration for a given equivalent time
Δt=tp Ttp−T,T<tp\Delta t = \frac{t_p\,T}{t_p - T},\qquad T < t_p
where:
  • TTequivalent time up to which the build-up must reproduce the drawdown, h
  • tpt_pproducing time before shut-in, h
  • Δt\Delta trequired shut-in duration, h

Units: any identical units of time

Holds when
  • The reservoir is infinite and the flow is radial. The formula is the inverse of Δte(Δt)\Delta t_e(\Delta t).
  • We choose TT according to what we need to see: for example, one cycle of the derivative plateau after wellbore storage has ended.

The closer TT is to tpt_p, the longer the shut-in. At T=tp/2T = t_p/2 it equals tpt_p, and at T=0.8 tpT = 0.8\,t_p it is already 4tp4t_p. The whole test, tp+Δtt_p + \Delta t, is shortest when the flow lasts 2T2T and the shut-in also lasts 2T2T. The derivative of the sum with respect to tpt_p is 1−T2/(tp−T)21 - T^2/(t_p - T)^2, and it vanishes at tp=2Tt_p = 2T.

Worked exampleWhich flow period to choose
Given (assumed data)
Goal
to see the derivative plateau on the build-up up to an equivalent time TT = 5 h (wellbore storage ends within half an hour)
Options
a main flow period of 6, 10 or 15 h
Solution
  1. tpt_p = 6 h: Δt=6⋅5/(6−5)=30\Delta t = 6\cdot5/(6 - 5) = 30 h, so the whole test takes 36 h.
  2. tpt_p = 10 h (=2T= 2T): Δt=10⋅5/(10−5)=10\Delta t = 10\cdot5/(10 - 5) = 10 h, so the total is 20 h.
  3. tpt_p = 15 h: Δt=15⋅5/(15−5)=7.5\Delta t = 15\cdot5/(15 - 5) = 7.5 h, so the total is 22.5 h.
Answer: The shortest test has a flow period of 10 h and a shut-in of 10 h. It takes 20 h in total, instead of 36 h with a six-hour flow period.

What it means. A longer flow period pays off as long as the shut-in gets shorter faster than the flow period grows. But an hour of flow costs differently from an hour of shut-in. The production in a test is usually burned off in a flare, the risk of sand production grows, and the test programme limits the volume produced. The calculation shows what each extra hour of equivalent time costs. The final decision is a compromise. The data in this example are assumed for illustration.

When equivalent time does not help

Equivalent time is derived from the logarithmic approximation of radial flow in an infinite reservoir. Wherever this approximation fails for even one of the three terms of the superposition, the time conversion stops being exact.

  • The flow has not reached the radial regime. Suppose the well was shut in during the transition period of wellbore storage. Then the bottomhole pressure at shut-in has not yet settled on the semilog straight line. The build-up against Δte\Delta t_e does not coincide with the drawdown curve. The late points are squeezed towards Δte≈tp\Delta t_e \approx t_p, where the type curve is still on its hump, and the skin calculated from the pressure at shut-in comes out too low. The derivative with respect to ln⁡Δte\ln\Delta t_e at the end of a long build-up does still reach the plateau (we plot it against Δt\Delta t). We describe the record as a whole with a model that has the whole rate history (example below).
  • Boundaries. If the disturbance from the start of production or from the shut-in has reached the boundaries, the logarithmic approximation is wrong for ΔpDD(tp+Δt)\Delta p_{DD}(t_p + \Delta t). In a closed region the build-up levels out at the average pressure (Build-up in a bounded reservoir and average reservoir pressure), whereas the drawdown goes to a unit-slope line (Reservoir limit test). No choice of time will turn one into the other. Near a sealing fault, the derivative with respect to ln⁡Δte\ln\Delta t_e rises with time to twice the plateau level. But against Δte\Delta t_e this rise is squeezed towards tpt_p, so we look for boundaries on the plot against Δt\Delta t.
  • Varying rate. We derived the formula for a single rate. With several rates, we take the superposition function of the whole history, or we choose a single notional producing time (Equivalent producing time and synthetic flowing time). A dangerous mistake is to take only the last flow period as tpt_p after a long production history and a short intermediate shut-in. The time will then be compressed too much, and the derivative will be distorted.
  • Gas wells. The gas equation is nonlinear. So we apply superposition and equivalent time to the pseudo-pressure (real gas pseudo-pressure) and, for large pressure changes, to pseudo-time as well. Pseudo-time allows for the change of μct\mu c_t with pressure.
  • Changing skin and wellbore storage. Clean-up of the near-wellbore region during the flow period, or the redistribution of gas and liquid in the wellbore after shut-in, breaks the linearity of the problem (Nonideal wellbore storage, well clean-up and changing skin).
Worked exampleA flow period shorter than wellbore storage
Given (assumed data)
Well
the same reservoir and the same skin, but after completion: a 1 h clean-up flow with shut-in at the surface, free gas in the tubing, CC = 0.15 m³/MPa
Readings
pwf(Δt=0)p_{wf}(\Delta t = 0) = 19.3643 MPa; 10 h after shut-in — 23.3761 MPa, 40 h after shut-in — 23.3940 MPa
Solution
  1. The start of the semilog straight line, from the estimate in the wellbore storage lesson (duration of wellbore storage), is t≈44.8 (60+3.5⋅3) 1.35⋅0.1545⋅9=1.58t \approx 44.8\,(60 + 3.5\cdot3)\,\dfrac{1.35\cdot0.15}{45\cdot9} = 1.58 h. This is longer than the whole flow period.
  2. The Horner line through 10 and 40 h: the horizontal coordinates are lg⁡(11/10)=0.04139\lg(11/10) = 0.04139 and lg⁡(41/40)=0.01072\lg(41/40) = 0.01072. Then m=(23.3940−23.3761)/(0.04139−0.01072)=0.5836m = (23.3940 - 23.3761)/(0.04139 - 0.01072) = 0.5836 MPa per cycle, and k=2.149⋅104.544/(0.5836⋅9)=42.8k = 2.149\cdot104.544/(0.5836\cdot9) = 42.8 mD.
  3. Continuing the line gives p∗=23.3940+0.5836⋅0.01072=23.4003p^* = 23.3940 + 0.5836\cdot0.01072 = 23.4003 MPa.
  4. Skin from the Horner formula with the correction for the producing time, lg⁡[(1+1)/1]=0.30103\lg[(1 + 1)/1] = 0.30103. We have p1h=23.4003−0.5836⋅0.30103=23.2246p_{1\text{h}} = 23.4003 - 0.5836\cdot0.30103 = 23.2246 MPa and lg⁡kϕμctrw2=7.0029\lg\dfrac{k}{\phi\mu c_tr_w^2} = 7.0029. So S=1.151 [(23.2246−19.3643)/0.5836−7.0029+2.098+0.30103]=2.31S = 1.151\,[(23.2246 - 19.3643)/0.5836 - 7.0029 + 2.098 + 0.30103] = 2.31.
  5. The equivalent time of the readings is 1⋅10/11=0.9091\cdot10/11 = 0.909 h and 1⋅40/41=0.9761\cdot40/41 = 0.976 h. Both are right at the limit tpt_p = 1 h.
Answer: The permeability of 42.8 mD and p∗p^* = 23.40 MPa are close to the correct values (45 mD and 23.4 MPa), but the skin is 2.31 instead of 3.

What it means. The late readings already lie in radial flow, so the slope and p∗p^* are nearly right. The Horner method does not need the flow to have reached the straight line before shut-in. The skin does need it. The formula assumes that at shut-in the bottomhole pressure lay on the semilog straight line of the drawdown. In fact it was still above the line, because the reservoir had not had time to “feel” the full drawdown. On type curves against Δte\Delta t_e, these readings would fall at Δte≈1\Delta t_e \approx 1 h. There the drawdown curve of the well is still on its hump (its derivative is 1.9 times higher than the plateau), while the build-up derivative with respect to ln⁡Δte\ln\Delta t_e is already almost on the plateau. The match would be meaningless. The right way is a model with wellbore storage, skin and the rate history, fitted to the whole record. The data in this example are assumed for illustration.

Terms and symbols

Producing time tpt_p
The length of production at a constant rate before shut-in. With a varying rate, it is a notional time that replaces the history (Equivalent producing time and synthetic flowing time).
Equivalent time Δte\Delta t_e
The time after the start of production at which the drawdown would show the same pressure change as the build-up a time Δt\Delta t after shut-in, tpΔt/(tp+Δt)t_p\Delta t/(t_p + \Delta t). It is always less than tpt_p.
Pressure rise after shut-in ΔpBU\Delta p_{BU}
The rise in pressure after shut-in, pws(Δt)−pwf(Δt=0)p_{ws}(\Delta t) - p_{wf}(\Delta t = 0). It cannot exceed the pressure drop over the producing time, pi−pwf(tp)p_i - p_{wf}(t_p).
Derivative with respect to equivalent time Δpe′\Delta p'_e
The derivative  dΔpBU/ dln⁡Δte\dd\Delta p_{BU}/\dd\ln\Delta t_e. It is equal to the derivative with respect to the Horner function, and in radial flow it is equal to the plateau mem_e for any tpt_p.
Time compression
A property of the Horner function and of equivalent time: the late hours of a build-up fit into a narrow interval near Δte=tp\Delta t_e = t_p.
Desuperposition
Recovering the drawdown from the build-up by adding the continuation of the pressure drop that the producing well would have given (see the advanced section).

Common mistakes and misconceptions

Wrong

“The derivative at the end of the build-up has halved — the reservoir has a constant-pressure boundary.”

In fact

First compare the length of the record with the producing time. After a short producing time, the derivative with respect to ln⁡Δt\ln\Delta t falls by the factor (tp+Δt)/tp(t_p + \Delta t)/t_p even without any boundaries. The derivative with respect to equivalent time shows whether there is a real decline.

Wrong

“The MDH method is simpler, and the result is the same.”

In fact

Only when Δt≪tp\Delta t \ll t_p. In the lesson's example, after a six-hour flow period, MDH applied to the readings at 1.5 and 6 h overestimated the permeability by a factor of 1.5.

Wrong

“The longer the build-up, the deeper into the reservoir the test sees, however long the flow period was.”

In fact

Equivalent time does not exceed tpt_p. The build-up reproduces the drawdown only up to a time equal to the producing time. The late information is squeezed towards tpt_p and needs very accurate readings. To see further, lengthen the flow period.

Wrong

“Equivalent time is suitable for any build-up.”

In fact

Only if the flow had reached the radial regime before shut-in, and the boundaries had no effect during the test. After a one-hour clean-up flow with gas in the tubing, the skin from the build-up in the lesson's example came out at 2.3 instead of 3.

Wrong

“Equivalent time and equivalent producing time are the same thing.”

In fact

Δte\Delta t_e converts the time after shut-in, while Np/qN_p/q replaces the producing time when the rate varies. We use the first in place of Δt\Delta t, and the second in place of tpt_p.

In depth: advanced detail

Derivation of equivalent time and its error

In radial flow in an infinite reservoir, ΔpDD(t)=me [ln⁡(at)+0.809+2S]\Delta p_{DD}(t) = m_e\,[\ln(at) + 0.809 + 2S], where a=k/(ϕμctrw2)a = k/(\phi\mu c_tr_w^2) converts time into dimensionless time. We put this into ΔpBU=ΔpDD(Δt)+ΔpDD(tp)−ΔpDD(tp+Δt)\Delta p_{BU} = \Delta p_{DD}(\Delta t) + \Delta p_{DD}(t_p) - \Delta p_{DD}(t_p + \Delta t). Of the three terms 0.809+2S0.809 + 2S, only one remains, and the logarithms combine into ln⁡a+ln⁡[tpΔt/(tp+Δt)]\ln a + \ln[t_p\Delta t/(t_p + \Delta t)]. The result is ΔpBU=me[ln⁡(aΔte)+0.809+2S]=ΔpDD(Δte)\Delta p_{BU} = m_e[\ln(a\Delta t_e) + 0.809 + 2S] = \Delta p_{DD}(\Delta t_e).

Where the approximation is not exact, it is useful to know by how much. Let ε(t)\varepsilon(t) be the deviation of the drawdown from its semilog straight line. It is negative during wellbore storage and zero in radial flow. From the same superposition we get:

Error of equivalent time
ΔpBU(Δt)−ΔpDD(Δte)=[ε(Δt)−ε(Δte)]+[ε(tp)−ε(tp+Δt)]\Delta p_{BU}(\Delta t) - \Delta p_{DD}(\Delta t_e) = \big[\varepsilon(\Delta t) - \varepsilon(\Delta t_e)\big] + \big[\varepsilon(t_p) - \varepsilon(t_p + \Delta t)\big]
where:
  • ε(t)\varepsilon(t)deviation of the drawdown from its semilog straight line: ΔpDD(t)−me[ln⁡(at)+0.809+2S]\Delta p_{DD}(t) - m_e[\ln(at) + 0.809 + 2S], Pa
  • Δt, Δte, tp\Delta t,\ \Delta t_e,\ t_ptime after shut-in, equivalent time, producing time, s

Units: any consistent system

Holds when
  • The reservoir is infinite, wellbore storage and skin are constant, and the problem is linear.

The first bracket vanishes when Δt≪tp\Delta t \ll t_p (then Δte≈Δt\Delta t_e \approx \Delta t) or when both times are already in radial flow. The second vanishes when the flow period itself has reached the radial regime. So the main condition is a flow period several times longer than wellbore storage. In the lesson's test (tpt_p = 6 h, wellbore storage lasting tenths of an hour), the difference over the whole record is no more than 0.00085 MPa. After a one-hour clean-up flow with gas in the tubing (the example in the section on limits), both brackets are large, because both the producing time and the equivalent time fall in the transition from wellbore storage to radial flow. At 10 h after shut-in the first bracket is 0.154 MPa and the second is −0.132 MPa. The build-up lies above the drawdown curve by their sum, 0.022 MPa.

Desuperposition: stretching the pressure instead of compressing the time

We can make the same correction in the pressure instead of the time. We rewrite the superposition as ΔpDD(Δt)=ΔpBU(Δt)+[ΔpDD(tp+Δt)−ΔpDD(tp)]\Delta p_{DD}(\Delta t) = \Delta p_{BU}(\Delta t) + [\Delta p_{DD}(t_p + \Delta t) - \Delta p_{DD}(t_p)]. To the pressure rise after shut-in, we add the amount by which the pressure in a producing well would have dropped over the time Δt\Delta t. The result is a true drawdown, stretched to the full length of the shut-in. This technique is called desuperposition.

Desuperposition in radial flow
ΔpDD(Δt)≈ΔpBU(Δt)+m lg⁡tp+Δttp\Delta p_{DD}(\Delta t) \approx \Delta p_{BU}(\Delta t) + m\,\lg\frac{t_p + \Delta t}{t_p}
where:
  • ΔpDD(Δt)\Delta p_{DD}(\Delta t)reconstructed pressure drop, as after the start of production, MPa
  • mmslope of the semilog straight line per decimal cycle, MPa
  • ΔpBU, tp, Δt\Delta p_{BU},\ t_p,\ \Delta tpressure rise after shut-in, producing time and time after shut-in, MPa, h, h

Units: pressure in any units (MPa), time in any identical units

Holds when
  • From the moment of shut-in onwards, the well would have “gone on” producing in the radial-flow regime. Otherwise we take the correction from a recorded drawdown or from a model.

We do not know the slope mm in advance, so the calculation is iterative (we repeat it until the answer stops changing). The first pass is without the correction (this is the MDH method). Then we apply the correction with the slope we found, and so on. For a pair of points, the slope error at each pass is multiplied by the share that the difference of the corrections makes up of the difference of the logarithms of time. In the lesson's example (readings at 1.5 and 6 h) this share is 0.34, and the iterations converge to the Horner slope. Equivalent time does the same at once, without iterations, which is why it is used more often. Desuperposition is convenient when we take the continuation of the drawdown not from a formula but from the record itself, for example from the pressure trend in a developed reservoir (Testing in a developed reservoir: Slider's method).

Connections to other topics

Check yourself

  1. 1

    A well produced for 10 h and the build-up was recorded for 15 h; there are no boundaries in the reservoir. By what factor is the derivative with respect to ln⁡Δt\ln\Delta t at the end of the record below the radial-flow plateau?

    1. A.Not below: in radial flow the derivative is constant
    2. B.15 times
    3. C.2.5 times
    4. D.1.5 times
    Show the answer

    Correct answer: C. 2.5 times

    The local slope with respect to ln⁡Δt\ln\Delta t is me tp/(tp+Δt)=me⋅10/25=0.4 mem_e\,t_p/(t_p + \Delta t) = m_e\cdot10/25 = 0.4\,m_e, which is 2.5 times below the plateau. The derivative with respect to equivalent time would have stayed on the plateau at this point.

  2. 2

    A well produced for 8 h. Calculate the equivalent time of the readings at 2, 8 and 40 h after shut-in. What does this mean for the analysis of the late readings?

    Show the answer

    Δte=8⋅2/10=1.6\Delta t_e = 8\cdot2/10 = 1.6 h, 8⋅8/16=48\cdot8/16 = 4 h, and 8⋅40/48≈6.678\cdot40/48 \approx 6.67 h. The last 32 h of the record (from 8 to 40 h) fit into the equivalent-time interval from 4 to 6.67 h, which is less than a quarter of a logarithmic cycle. The late readings are squeezed towards tpt_p = 8 h. Through them the build-up reproduces the drawdown only up to 6.67 h, and for the derivative plot it is better to plot them against Δt\Delta t.

  3. 3

    Which method of analysing a build-up after a short producing time gives the correct radial-flow slope?

    1. A.Any of them: the slope does not depend on the producing time
    2. B.The MDH method on the points after wellbore storage has ended
    3. C.Matching to drawdown type curves against Δt\Delta t
    4. D.The Horner plot or a plot against lg⁡Δte\lg\Delta t_e
    Show the answer

    Correct answer: D. The Horner plot or a plot against lg⁡Δte\lg\Delta t_e

    The Horner function and equivalent time contain the producing time, so in radial flow the points fall on a straight line with the correct slope. MDH and matching against Δt\Delta t do not allow for it: the slope with respect to lg⁡Δt\lg\Delta t is underestimated by the factor (tp+Δt)/tp(t_p + \Delta t)/t_p, and the permeability is overestimated.

  4. 4

    After a 4 h flow period, a straight line was drawn on the build-up against lg⁡Δte\lg\Delta t_e. The slope is 0.42 MPa per cycle, the pressure rise on the line at Δte\Delta t_e = 1 h is 3.70 MPa, and the bottomhole pressure at shut-in is 17.30 MPa. The reservoir is virgin (not yet produced), and no boundaries are seen. Find the initial pressure, and explain why we read it at Δte\Delta t_e = 4 h.

    Show the answer

    On the straight line at Δte=tp\Delta t_e = t_p = 4 h, the pressure rise is 3.70+0.42lg⁡4=3.70+0.253≈3.953.70 + 0.42\lg 4 = 3.70 + 0.253 \approx 3.95 MPa, so pi≈17.30+3.95=21.25p_i \approx 17.30 + 3.95 = 21.25 MPa. The value Δte=tp\Delta t_e = t_p corresponds to an infinitely long shut-in (a Horner ratio of 1). In an infinite reservoir the pressure would return to its initial value, and the pressure rise would reach pi−pwf(tp)p_i - p_{wf}(t_p).

  5. 5

    Why does interpretation software usually plot the derivative with respect to equivalent time against the elapsed time Δt\Delta t, rather than against Δte\Delta t_e?

    Show the answer

    The values of the derivative do not depend on the choice of axis. Against Δte\Delta t_e, the late part of a long build-up is squeezed near tpt_p. Signs of boundaries that appear at Δt\Delta t greater than tpt_p fit into a narrow strip and are hard to see. Against Δt\Delta t, the late readings stay where they are, and radial flow is still seen as a plateau.

  6. 6

    The clean-up flow of a new well lasted 40 minutes, with shut-in at the surface. The wellbore is partly filled with gas, and an estimate shows that the semilog straight line on the drawdown would have started only after 2 h. What can we reliably get from the following 30 h build-up?

    1. A.The flow capacity and p∗p^* from the late points; the skin calculated from the pressure at shut-in will come out too low
    2. B.The skin exactly, but not the flow capacity
    3. C.Everything, if the record is analysed against Δte\Delta t_e
    4. D.Nothing
    Show the answer

    Correct answer: A. The flow capacity and p∗p^* from the late points; the skin calculated from the pressure at shut-in will come out too low

    The late points of the build-up lie in radial flow, so we can find the slope and p∗p^* from them. The skin requires the bottomhole pressure at shut-in to lie on the semilog straight line of the drawdown, but the flow had not reached it. In the lesson's example, after a one-hour clean-up flow, the skin came out at 2.3 instead of 3. Converting the time to Δte\Delta t_e does not help here. We need a model with the whole rate history.

Updated: 19 October 2026