Skip to content
Brent$104.61Gas TTF$906USD446.56 ₸
MunaiHub

Straight-line slope of a build-up or drawdown curve

Slope m of the semilog straight line of a pressure build-up (+) or drawdown (−) curve, in psi per log cycle.

Formula
m = C × q × B × μ / (k × h)

Inputs

You can change a field's unit: the value is converted to the formula's units automatically.

C
q
B
μ
k
h
Unit converter for this formulaLiquid rate · Oil formation volume factor · Viscosity · Permeability · Length · Semilog slope
Metric
  • m³/d1
  • m³/h0.0416667
  • L/s0.0115741
  • L/min0.694444
  • m³/min0.000694444
US field units
  • bbl/d6.28981
  • Mbbl/d0.00628981
  • ft³/d35.3147
  • US gpm0.183453
  • bbl/min0.00436792

A day is 24 hours.

All units
Result
mStraight-line slope
Fill in all fields

More in Build-up and drawdown

Results are engineering estimates from standard formulas; for design decisions check them against the codes, project documents and specialists' calculations. The formulas carried over from the original set are unchanged, and their errors are described in the notes.