Producing time and Horner time ratio

Effective producing time before a build-up from the cumulative production and the last rate, the Horner time ratio (t_p + Δt)/Δt for the plot axis, and Agarwal's equivalent time.

Formula
t_p = 24 · N_p / q(t_p + Δt) / ΔtΔt_e = Δt · t_p / (t_p + Δt)

The varying rate before shut-in is replaced by the last rate over the time t_p with the same cumulative production (Horner). If t_p is much longer than the build-up, the MDH plot of pressure against log Δt works too. The equivalent time Δt_e lets drawdown type curves be used on a build-up.

Source: Horner (1951); Earlougher, SPE Monograph 5 (1977), ch. 5; equivalent time: Agarwal, SPE 9289 (1980)

Inputs

You can change a field's unit: the value is converted to the formula's units automatically.

N_p

Since start-up or since the last long shut-in that let the pressure recover.

q

Stabilized, in the same terms as N_p.

Δt
Unit converter for this formulaLiquid volume · Liquid rate · Time
Metric
  • 1
  • 10³ m³0.001
  • 10⁶ m³1·10⁻⁶
  • L1,000
US field units
  • bbl6.28981
  • Mbbl0.00628981
  • MMbbl6.28981·10⁻⁶
  • ft³35.3147
  • US gal264.172
All units
Result
t_pEffective producing time
Fill in all fields
  • (t_p + Δt)/ΔtHorner time ratio
  • Δt_eAgarwal equivalent time

More in Build-up and drawdown

Results are engineering estimates from standard formulas; for design decisions check them against the codes, project documents and specialists' calculations. The formulas carried over from the original set are unchanged, and their errors are described in the notes.