Casing cementing: slurry and displacement volumes

Slurry volume for a single-stage casing job: the open-hole annulus with excess, the overlap with the previous casing, the shoe track and the rat hole, plus the displacement volume down to the float collar.

Formula
V_oh = π/4 · (D_b² − D_c²) · (H_s − max(H_c, H_p)) · (1 + k)V_ov = π/4 · (d_p² − D_c²) · max(0, H_p − H_c)V_st = π/4 · d_c² · h; V_rh = π/4 · D_b² · L_r · (1 + k)V = V_oh + V_ov + V_st + V_rhV_d = π/4 · d_c² · (H_s − h)

One stage, one slurry. For lead and tail slurries, compute the volume from the shoe to the top of the tail and subtract it from the total. Surface lines and the compressibility of the displacement fluid are not included — add them as the job plan requires.

Source: Bourgeois et al., Applied Drilling Engineering (SPE, 1986), ch. 3; Nelson E. B., Guillot D. (eds.), Well Cementing, 2nd ed. (Schlumberger, 2006)

Inputs

You can change a field's unit: the value is converted to the formula's units automatically.

D_b

Bit size, or the caliper average (then with a smaller excess).

k

From a caliper log or offset wells.

D_c
d_c
H_s
H_c

0 for cement to surface.

H_p

0 if there is none.

d_p
h
L_r
Unit converter for this formulaLength · Liquid volume · Fraction and percent
Metric
  • m1
  • cm100
  • mm1,000
  • km0.001
US field units
  • ft3.28084
  • in39.3701
  • 1/32 in1,259.84
  • 1/64 in2,519.69
  • mile0.000621371
All units
Result
VSlurry volume
Fill in all fields
  • V_ohOpen-hole annulus (with excess)
  • V_ovAnnulus inside the previous casing
  • V_stShoe track
  • V_rhRat hole
  • V_dDisplacement volume

More in Cementing

Results are engineering estimates from standard formulas; for design decisions check them against the codes, project documents and specialists' calculations. The formulas carried over from the original set are unchanged, and their errors are described in the notes.